Planning application
24/01223/FUL
Cedar Lodge Headley Road Epsom Surrey KT18 6BH
Proposal
Conversion of existing stable blocks into 6 residential 1-bedroom units
As published by the council, reference 24/01223/FUL
Timeline
Dates from the published record
-
20 Sep 2024
Received by Epsom and Ewell
-
15 Nov 2024
Decision issued: Application Refused
-
30 Jul 2026
Added to PlanIndex
What refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00231/FLH Granted
Cedar Court The Ridge Epsom Surrey KT18 7EP
Extension and enclosure of front entrance portico, part single storey, part two storey side extension and single storey rear extension to main house. Single storey front extension to detached garage/annexe and conversion of ground floor southern annexe accommodation to provide additional garage parking. Alterations to fenestration, internal reconfiguration, external hard and soft landscaping alterations to suit and associated works
-
24/01121/TPO Granted
Wood End The Ridge Epsom Surrey KT18 7EP
T1 Ash - (96/T11) Reduce the low over extended lateral limb growing over the neighbours property by 2.5 meters to remove weight and windsail to prevent failure. Remove the deadwood from the canopy.
-
MO/2026/00800 Granted
PINEWOOD HOUSE PLEASURE PIT ROAD ASHTEAD KT21 1HR
TPO/103/1/P T1 - Eucalyptus - Reduce back to previous reduction points by removing up to 3m of new growth leaving suitable pruning points T2 - Common Oak - Reduce back to previous reduction points by removing up to 2.5m of new growth leaving suitable pruning points. T3 - Common Oak - Reduce back to previous reduction points by removing up to 2.5m of new growth leaving suitable pruning points. T4- Common Oak - Reduce back to previous reduction points by removing up to 2.5m of new growth leaving suitable pruning points. T5 - Common Oak - Reduce back to previous reduction points by removing up to 2.5m of new growth leaving suitable pruning points. T6 - Cherry - Prunus Kansan - Reduce crown of Cherry tree to previous reduction points by removing up to 2.5m of new growth leaving suitable pruning points. The proposed works for each tree are for full radial crown reductions so these works would be all over.
Other full applications applications
In Epsom and Ewell
-
26/00330/FUL Granted
Linden Bridge School Grafton Road Worcester Park Surrey KT4 7JW
Erection of 3m fencing around northwest site perimeter.
-
26/00549/FUL Granted
2 Larch Crescent West Ewell Surrey KT19 9EL
Roof extension to first floor maisonette to accommodate a habitable space incorporating a rear dormer and two front roof lights
-
26/00633/FUL Granted
62 High Street Ewell Surrey KT17 1RL
Change of use from Class E(g) to F1(a), for education use on the ground, first and second floor.
-
26/00367/FUL Refused
Pavement Outside 64 High Street Epsom KT19 8AT
Installation of 1No. internally illuminated multifunction communication hub including a defibrillator, digital LCD advertisement display and interactive touch screen
-
26/00506/FUL Refused
13 Kirby Close Ewell Surrey KT19 0PW
Sub-division of the existing dwelling to create an additional residential unit incorporating conversion of the garage and construction of a first-floor extension above to accommodate the new residential dwelling