Skip to content
PlanIndex Get alerts
Menu

Planning application

Tchibo Coffee International Ltd Units 7 And 8 Longmead Industrial Estate Blenheim Road Epsom Surrey KT19 9BE

Granted Epsom and Ewell 23/01076/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replace existing metal Cladding with new Composite Cladding. Replace doors, roller shutters and canopy

As published by the council, reference 23/01076/FUL

Application record

Reference
23/01076/FUL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Application Permitted
Received
14 Sep 2023
Validated
14 Sep 2023
Decided
1 Nov 2023
Ward
Court
Decision by
Delegated Decision
Postcode
KT19 9BE

Site history

Applications at this address on the Epsom and Ewell register

This site has had 2 applications since 2023: 2 approved, 0 refused.

  • 23/01094/PDPV Granted

    Tchibo Coffee International Ltd Units 7 And 8 Longmead Industrial Estate Blenheim Road Epsom Surrey KT19 9BE

    Prior Approval for installation of solar pv panels. The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) - Schedule 2, Part 14, Class J

    Decided 30 Oct 2023 Prior approval

Timeline

Dates from the published record

  1. 14 Sep 2023

    Received by Epsom and Ewell

  2. 1 Nov 2023

    Decision issued: Application Permitted

  3. 17 Nov 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Novanta Designs Ltd Agent, a design practice registered in Slough

Active · incorporated 2007 · Slough

3 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

13 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What this grant of permission means

Epsom and Ewell granted permission on 1 November 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Tchibo Coffee International Ltd Units 7 And 8 Longmead Industrial Estate Blenheim Road Epsom Surrey KT19 9BE

    23/01094/PDPV Submitted 4 Sep 2023 50 yards away

    Prior Approval for installation of solar pv panels. The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) - Schedule 2, Part 14, Class J

    Granted Prior approval 10 docs
  • 86 Miles Road Epsom Surrey KT19 9AB

    19/01689/CLP Submitted 16 Dec 2019 150 yards away

    Erection of rear dormer roof extension, installation of 3 x front rooflights

    Granted Lawful development Extension Loft or dormer 6 docs
  • Epsom Car Care 19A Blenheim Road Epsom Surrey KT19 9AP

    26/00791/CLEF Submitted 6 Jul 2026 150 yards away

    88% historically approved · decision due ~31 Aug

    Lawful Development Certificate - Existing Use: Car repair workshop

    Decided
  • 84 Miles Road Epsom Surrey KT19 9AD

    22/00142/FLH Submitted 2 Feb 2022 150 yards away

    Erection of single storey side and rear wrap-around extension and rear dormer roof extensions to facilitate loft conversion

    Granted Householder Extension Loft or dormer 9 docs
    Small domestic
  • Conifer Park Kiln Lane Epsom Surrey KT17 1DY

    25/00103/CMA Submitted 29 Jan 2025 150 yards away

    Demolition of 3no. existing utility blocks and installation of 5no. utility blocks.

    Granted Outline Demolition 7 docs
  • Conifer Park Kiln Lane Surrey Epsom KT17 1DY

    25/00041/CMA Submitted 16 Jan 2025 150 yards away

    Full planning permission for the demolition of 3no. existing utility blocks and installation of 5no. utility blocks to support the existing residential units on the GRT site at Kiln Lane, Epsom, Surrey

    Granted Outline Demolition 10 docs

In Epsom and Ewell

  • 26/01218/FUL Awaiting decision

    2 Tintagel Close Epsom Surrey KT17 4HA

    Replacement and relocation of existing front boundary fence

    Full applications
  • 26/01295/FUL Awaiting decision

    2 Crosslands Road West Ewell Surrey KT19 9SS

    Single-storey side extension following demolition of existing garage and change of use from C3 (Dwellinghouse) to 8 Bedroom HMO (Sui Generis)

    Full applications
  • 26/01286/FUL Awaiting decision

    Fall Line Design Unit B The Paddock Rear Of The Looe Reigate Road Ewell Surrey KT17 3BZ

    Retrospective change of use of Unit B to a motorcycle repair and maintenance workshop (Use Class B2), together with the proposed installation of a Class 1 and 2 motorcycle MOT testing bay.

    Full applications
  • 26/01069/FUL Granted

    98 Chadacre Road Stoneleigh Surrey KT17 2HF

    Erection of granny annexe

    10 Nov 2026 Full applications
  • 26/01016/FUL Granted

    HSBC 54 High Street Epsom Surrey KT19 8DS

    Replacement of principal entrance door, on a like-for-like basis

    10 Nov 2026 Full applications