Skip to content
PlanIndex Get alerts
Menu

Planning application

37 Higher Green Ewell Surrey KT17 3BB

Granted Epsom and Ewell 23/00999/FLH Full Planning Permission (Householder)

Works: Extension Loft or dormer Windows or glazing Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

First floor rear extension, rear dormer roof extension and alterations to fenestration.

As published by the council, reference 23/00999/FLH

Application record

Reference
23/00999/FLH
Type
Full Planning Permission (Householder)
Status
Decided
Decision
Granted As published: Application Permitted
Received
11 Sep 2023
Validated
11 Sep 2023
Decided
27 Nov 2023
Ward
Nonsuch
Decision by
Delegated Decision
Postcode
KT17 3BB

Site history

Applications at this address on the Epsom and Ewell register

This site has had 3 applications since 2022: 1 approved, 2 refused.

  • 22/01872/FLH Refused

    37 Higher Green Ewell Surrey KT17 3BB

    Erection of a first floor rear extension, loft conversion and side dormer window

    Decided 24 Jan 2023 Householder
  • 22/01276/FLH Refused

    37 Higher Green Ewell Surrey KT17 3BB

    First floor sides extension, two storey rear extension incorporating conversion of loft space to habitable use.

    Decided 13 Oct 2022 Householder

Timeline

Dates from the published record

  1. 11 Sep 2023

    Received by Epsom and Ewell

  2. 27 Nov 2023

    Decision issued: Application Permitted

  3. 17 Nov 2026

    Added to PlanIndex

Documents

21 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What this grant of permission means

Epsom and Ewell granted permission on 27 November 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 37 Higher Green Ewell Surrey KT17 3BB

    22/01276/FLH Submitted 3 Aug 2022 50 yards away

    First floor sides extension, two storey rear extension incorporating conversion of loft space to habitable use.

    Refused Householder Extension 13 docs
    Domestic
  • 37 Higher Green Ewell Surrey KT17 3BB

    22/01872/FLH Submitted 28 Nov 2022 50 yards away

    Erection of a first floor rear extension, loft conversion and side dormer window

    Refused Householder Extension Loft or dormer +1 14 docs
    Domestic
  • 35 Higher Green Ewell Surrey KT17 3BB

    23/01415/CAT Submitted 29 Nov 2023 50 yards away

    Yew (T1) - crown reduce by approximately 2m to control size and encroachment over neighbouring garden. Lawson Cypress (T2) - fell to remove encroachment into the Yew.

    Granted Trees 5 docs
  • 39 Higher Green Ewell Surrey KT17 3BB

    24/01142/TPO Submitted 2 Sep 2024 50 yards away

    TPO398/T17 - Cedar - To selectively reduce lateral branches from mature Cedar located in the rear garden by 2.0m in places where the branches protrude the natural crown. All branches will be pruned to appropriate growth points. All works are carried out to BS 3998: 2010 Tree work recommendations. A well balanced shape will be maintained. The work will help improve the balance and aesthetics of the tree and will increase the amount of light into customer and neighbouring garden.

    Granted Trees Drawings (1) 6 docs
  • 33 Higher Green Ewell Surrey KT17 3BB

    23/01401/CAT Submitted 24 Nov 2023 50 yards away

    Two Yews (G1) - reduce height by approximately 2m and lateral branches by up to 2m to control size and leave a well balanced shape. Cherry (T2) - crown reduce by approximately 2m to control size. Apple (T3) - crown reduce by approximately 2m to control size. Neighbours Cherry (T4) on north west boundary. Reduce lateral branches to south/south east by approximately 2 - 3m to reduce encroachment over the garden.

    Granted Trees 10 docs
  • 31 Higher Green Ewell Surrey KT17 3BB

    22/01885/TPO Submitted 23 Nov 2022 50 yards away

    Retrospective application to remove Blue Atlas Cedar T30 of TPO 32 that was located in the rear garden. The applicant advises the tree was not present when they moved in.

    Granted Trees 3 docs

In Epsom and Ewell

  • 26/01195/FLH Awaiting decision

    12 Richmond Crescent Epsom Surrey KT19 8JA

    Conversion of garage to accommodate a habitable space incorporating revised hard and soft landscaping for parking. Installation of air conditioning units and associated works.

    Received 18 Oct, published by the council 17 Nov 2026 Householder
  • 26/00886/FLH Granted

    143 Manor Green Road Epsom Surrey KT19 8LL

    Single storey front extension and first floor side extension including front facing balcony

    25 Aug 2026 Householder
  • 26/01073/FLHF Granted

    12 Ewell Downs Road Ewell Surrey KT17 3BP

    Two-storey and a single-storey rear extension and installation of solar panels to main roof.

    Received 16 Sep, published by the council 17 Sep 2026 Householder
  • 26/00832/FLH Granted

    25 Bramley Road Cheam Surrey SM2 7LR

    Garage conversion to habitable room, front single storey extension, new porch, infill two storey rear extension.

    27 Aug 2026 Householder
  • 26/01062/FLH Awaiting decision

    124 Woodstone Avenue Stoneleigh Surrey KT17 2JN

    Single storey rear extension and associated works following demolition of existing conservatory

    16 Oct 2026 Householder