Skip to content
PlanIndex Get alerts
Menu

Planning application

Development Site At 65 London Road Ewell Surrey KT17 2BL

Granted Epsom and Ewell 22/00728/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of a four storey building plus basement for use as a care home (Use Class C2) with up to 70 bedrooms and associated communal spaces and services, together with associated car and cycle parking, refuse storage and ancillary works.

As published by the council, reference 22/00728/FUL

Application record

Reference
22/00728/FUL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Application Permitted
Received
6 Jun 2022
Validated
6 Jun 2022
Decided
17 Jan 2023
Ward
Stoneleigh
Decision by
Committee Decision
Postcode
KT17 2BL

Site history

Applications at this address on the Epsom and Ewell register

This site has had 13 applications since 2022: 12 approved, 0 refused.

  • 26/00919/NMA Granted

    Development Site At 65 London Road Ewell Surrey KT17 2BL

    Non-Material Amendments to planning permission 25/00331/REM to construct additional brick faced retaining walls to manage and support differing site levels

    Decided 3 Sep 2026 Amendments
  • 24/01357/NMA Withdrawn

    Development Site At 65 London Road Ewell Surrey KT17 2BL

    Non-Material Amendments to planning permission 23/00817/FUL to reword Conditions 10 and 16 pending approval on submitted information

    Decided 27 Nov 2024 Amendments
  • 24/01295/S106A Granted

    Development Site At 65 London Road Ewell Surrey KT17 2BL

    Variation to Section 106 Agreement to insert Section 73 clause

    Decided 14 Jan 2025 Conditions
  • 24/01187/COND Granted

    Development Site At 65 London Road Ewell Surrey KT17 2BL

    Confirmation of Compliance with Condition(s): 14 (Noise Treatment Details) of planning permission 23/00817/FUL

    Decided 3 Oct 2024 Conditions
  • 24/01163/COND Granted

    Development Site At 65 London Road Ewell Surrey KT17 2BL

    Confirmation of Compliance with Condition(s): 13 (Nitrogen Dioxide Assessment) of planning permission 23/00817/FUL

    Decided 11 Oct 2024 Conditions
  • 24/01051/COND Granted

    Development Site At 65 London Road Ewell Surrey KT17 2BL

    Confirmation of Compliance with Condition: 5 (Means of Enclosure) of planning permission 23/00817/FUL

    Decided 17 Oct 2024 Conditions
  • 24/00968/COND Granted

    Development Site At 65 London Road Ewell Surrey KT17 2BL

    Confirmation of Compliance with Condition: 10 (SuDS Details) of planning permission 23/00817/FUL dated 27.02.2024

    Decided 22 Nov 2024 Conditions
  • 24/00938/COND Granted

    Development Site At 65 London Road Ewell Surrey KT17 2BL

    Confirmation of Compliance with Condition: 16 (Ground/Groundwater Contamination) of planning permission 23/00817/FUL

    Decided 25 Nov 2024 Conditions
  • 24/00819/COND Granted

    Development Site At 65 London Road Ewell Surrey KT17 2BL

    Confirmation of Compliance with Condition: 3 (Materials) of planning permission 23/00817/FUL

    Decided 15 Aug 2024 Conditions
  • 24/00762/COND Granted

    Development Site At 65 London Road Ewell Surrey KT17 2BL

    Confirmation of Compliance with Condition: 4 (Construction Transport Management Plan) of planning permission 23/00817/FUL

    Decided 11 Oct 2024 Conditions

Timeline

Dates from the published record

  1. 6 Jun 2022

    Received by Epsom and Ewell

  2. 17 Jan 2023

    Decision issued: Application Permitted

  3. 17 Nov 2026

    Added to PlanIndex

Documents

56 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What this grant of permission means

Epsom and Ewell granted permission on 17 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Epsom and Ewell

  • 26/01295/FUL Awaiting decision

    2 Crosslands Road West Ewell Surrey KT19 9SS

    Single-storey side extension following demolition of existing garage and change of use from C3 (Dwellinghouse) to 8 Bedroom HMO (Sui Generis)

    Full applications
  • 26/01286/FUL Awaiting decision

    Fall Line Design Unit B The Paddock Rear Of The Looe Reigate Road Ewell Surrey KT17 3BZ

    Retrospective change of use of Unit B to a motorcycle repair and maintenance workshop (Use Class B2), together with the proposed installation of a Class 1 and 2 motorcycle MOT testing bay.

    Full applications
  • 26/01069/FUL Granted

    98 Chadacre Road Stoneleigh Surrey KT17 2HF

    Erection of granny annexe

    10 Nov 2026 Full applications
  • 26/01016/FUL Granted

    HSBC 54 High Street Epsom Surrey KT19 8DS

    Replacement of principal entrance door, on a like-for-like basis

    10 Nov 2026 Full applications
  • 26/00923/FUL Granted

    Bankside East Street Epsom Surrey KT17 1HH

    Change of use of the ground floor to Class B8 (Storage) and first floor to Class E(g)(i) (Office).

    Received 24 Aug, published by the council 25 Aug 2026 Full applications