Planning application
140 - 142 Ruxley Lane West Ewell Surrey KT19 9JS
Works: New dwelling Demolition Major scheme
Read from the description, not a valuation. How we read the register
At appeal, which passes the decision to the national inspectorate. Anyone who commented before is normally able to comment again.
Proposal
Demolition of existing dwellings and erection of 20 flats within two blocks with associated car parking and landscaping.
As published by the council, reference 21/01406/FUL
Application record
- Reference
- 21/01406/FUL
- Type
- Full Planning Permission
- Status
- Appeal decided
- Decision
- Appeal Refused (Dismissed)
- Received
- 24 Aug 2021
- Validated
- 24 Aug 2021
- Decided
- 22 Aug 2023
- Ward
- Ruxley
- Decision by
- Committee Decision
- Postcode
- KT19 9JS
Timeline
Dates from the published record
-
24 Aug 2021
Received by Epsom and Ewell
-
22 Aug 2023
Decision issued: Appeal Refused (Dismissed)
-
5 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Kingston Upon Thames
35 applications on PlanIndex · across 15 councils · 58% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
30 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens at appeal
The process from here
This application is at appeal, which passes the decision from the council to the national planning inspectorate, or in Scotland usually to a local review body first. The appeal considers the scheme afresh against the same policies.
Anyone who commented on the original application is normally notified and can comment again within the appeal deadline. Appeal decisions take months rather than weeks, and the outcome replaces the council's decision.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
140 And 142 Ruxley Lane West Ewell Surrey KT19 9JS
Variation of Condition 5 (Access and Cross Over Provision) of planning permission 23/00588/FUL to alter the timing of construction of the proposed access to pre-occupation.
Granted Conditions 11 docs -
140 And 142 Ruxley Lane West Ewell Surrey KT19 9JS
Confirmation of Compliance with Condition(s): 4 (External Materials), 5 (Access and Cross Over Provision), 6 (Tracking Details), 7 (Surface Water Drainage Scheme), 8 (Landscaping), 9 (Ground Contamination) of planning permission 23/00588/FUL
Granted Conditions 37 docs -
140 And 142 Ruxley Lane West Ewell Surrey KT19 9JS
Confirmation of Compliance with Condition(s): 17 (Drainage Verification Report), 18 (Ground Contamination Remediation Scheme) of planning permission 25/00913/REM
Granted Conditions 11 docs -
Land At Epsom And Ewell High School Ruxley Lane West Ewell Surrey KT19 9JW
Details pursuant to conditions Condition 50 (Details of the Refuse and Recycling management strategy) and Condition 61 Details of cycle storage of planning consent Ref No 18/01360/FUL
Granted Conditions 8 docs -
13 Cox Lane West Ewell Surrey KT19 9LR
88% historically approved · decision due ~22 Jul
Part demolition and conversion of the existing garage to create habitable space. A single-storey side and rear wrap-around extension, the addition of a first floor, and a new gabled roof with a side dormer window and roof lights. Alterations to the exterior and fenestration to facilitate the converted roof space.
Awaiting decision Householder Extension Loft or dormer +2 26 docsSmall domestic -
13 Cox Lane West Ewell Surrey KT19 9LR
63% historically approved · decision due ~1 Oct
Part demolition and conversion of the existing garage to create habitable space. A single-storey side and rear wrap-around extension, the addition of a first floor, and a new gabled roof with a side dormer window and roof lights. Alterations to the exterior and fenestration to facilitate the converted roof space.
Awaiting decision Full applications Extension Loft or dormer +2Small domestic
Other full applications applications
In Epsom and Ewell
-
26/00901/FUL Awaiting decision
1 Windmill Avenue Epsom Surrey KT17 1LL
Demolition of existing single storey dwelling and construction of a two storey, 4 bedroom dwelling (retrospective)
-
26/00961/FUL Awaiting decision
9, 9B, 9C And 9D St Martins Avenue Epsom Surrey KT18 5HT
Demolition of No.9c and single-storey extension to the rear of No.9, alterations to the rear elevation of No.9 and conversion for use as a single dwellinghouse, and the erection of 1 no. detached 2½ storey house and 2 no. semi-detached 2½ houses at the rear, together with associated access, car parking, bin stores, cycle stores, landscaping and amenity space.
-
26/00900/FUL Awaiting decision
First And Second Floor Flat Above 20 High Street Epsom Surrey KT19 8AH
Replacement of front elevation windows at first and second floor
-
26/00948/FUL Awaiting decision
1 Ewell House Parade Epsom Road Epsom Surrey KT17 1NP
Retrospective application for a side boundary fence 1.2m high
-
26/00842/FUL Awaiting decision
38 The Warren Worcester Park Surrey KT4 7DL
Change of use from a single detached dwellinghouse (Use Class C3) to a private residential care home (Use Class C2)