Planning application
70 Station Avenue West Ewell Surrey KT19 9UG
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Notification for Prior Approval for a 6m deep single storey rear extension.
As published by the council, reference 19/01679/PDE
Application record
- Reference
- 19/01679/PDE
- Type
- General Permitted Development - Extns
- Status
- Decided
- Decision
- Granted As published: Prior Approval Required and Permitted
- Received
- 10 Dec 2019
- Validated
- 10 Dec 2019
- Decided
- 21 Jan 2020
- Ward
- West Ewell
- Decision by
- Delegated Decision
- Postcode
- KT19 9UG
Timeline
Dates from the published record
-
10 Dec 2019
Received by Epsom and Ewell
-
21 Jan 2020
Decision issued: Prior Approval Required and Permitted
-
17 Nov 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Architect Your Home Wandsworth Agent, an architecture practice
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
5 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Epsom and Ewell granted permission on 21 January 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
55 Station Avenue West Ewell Surrey KT19 9UD
Lawful Development Certificate - Proposed Use: Hip to gable formation of rear dormer to create loft conversion and provide 2no rooflights to front elevation.
Granted Lawful development Loft or dormer 4 docs -
St Clements RC Primary School Fennells Mead Ewell Epsom Surrey KT17 1TX
T1 Lombardy Poplar (T2 of TPO 394) - Reduce height by 8-9 metres 21x9m down to 12x9m. Works to limit further branch failure T2 Cedar (T1 of TPO 394) - Dismantle to ground level - This tree is causing a nuisance with roots constantly blocking the drains. Multiple invoices from drainage company attached as reference to problems
Granted Trees 11 docs -
33 Station Avenue West Ewell Surrey KT19 9UD
Single storey rear extension and associated alterations (following demolition of existing rear porch and conservatory) and alteration of roof from hip to gable end; rear roof extension (involving conversion of roofspace to habitable use) (Application for a Certificate of Lawful Development - Proposed).
Small domestic -
33 Station Avenue West Ewell Surrey KT19 9UD
Single storey rear extension and associated alterations following demolition of the existing rear porch and conservatory
Granted Extension Demolition 15 docsSmall domestic -
St Clements RC Primary School Fennells Mead Ewell Surrey KT17 1TX
Lombardy Poplar (394/T2) Height reduction of 2-4 metres demonstrated by the red line shown in the picture of the tree, height reduction will be to suitable pruning points.
Granted Trees 7 docs -
St Clements RC Primary School Fennells Mead Ewell Surrey KT17 1TX
This application is for the felling of T1 Lombardy Poplar (394/T2) inside the main gates of St Clements School, Ewell. The Poplar has been reduced in the past and dead wooded on multiple occasions and still imposes a huge risk the the school building, staff members and most importantly the children. Multiple large limbs have snapped out in the past damaging cars parked below both in the train station car park and the staff parking that is directly below the tree. One large limb snapped out in high winds causing thousands of pounds worth of damage to the school impaling the roof of the building. The root system has lifted the tarmac considerably making a trip hazard for staff and students that walk, scooter and ride into the school gates with further issues implanting the main drains causing flooding at the front of the school entrance and blocking the guttering on the school roof. The tree has simply outgrown the space and given all the deciding factors we see no other than to safely fell the tree and replant a more suitable tree given the council approval. A site meeting would be beneficial to show the extent of damages caused over the last few years. All work will comply with BS3998
Refused Trees 6 docs
Other prior approval applications
In Epsom and Ewell
-
26/01021/PDE Refused
135 Horton Hill Epsom Surrey KT19 8SY
Permitted Development Prior Notification: Single storey rear extension (6.00m in depth, maximum height of 3.00m and eaves height of 3.00m).
-
26/01197/PDE Awaiting decision
63 Nonsuch Walk Cheam Surrey SM2 7LF
Permitted Development Prior Notification: Single storey rear extension (8.00m in depth, maximum height of 3.25m and eaves height of 3.00m).
-
26/00905/PDCOU Granted
Resources House 8A High Street Epsom Surrey KT19 8AD
Prior Approval: Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) - Schedule 2, Part 3, Class G to create 2 dwelling(s)
-
26/00895/PDCOU Granted
Newplan House 41 East Street Epsom Surrey KT17 1BL
Prior Approval Schedule 2, Part 3, Class MA: Change of Use from Commercial, Business and Service (E) to Residential (C3) to create 6 dwelling(s).
-
26/00809/PDE Granted
5 Poole Road West Ewell Surrey KT19 9SQ
Permitted Development Prior Notification: Single storey rear extension (3.60m in depth, maximum height of 3.60m and eaves height of 2.25m).