Planning application
Oaks View Court Lane Epsom Surrey KT19 8NG
Works: New dwelling Demolition Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details pursuant to condition 11 (Sustainable Drainage System) of Planning Application ref 16/01145/FUL (Demolition of two vacant dwellings, one garage and annex, and the construction of a new 3 storey flatted development comprising 13 flats ( 3 one bed flats, 6 two bed flats and 4 three bed flats) and associated parking and landscaping works.(Amended drawings received 18.04.2017)).
As published by the council, reference 19/01545/COND
Application record
- Reference
- 19/01545/COND
- Type
- Details pursuant to conditions
- Status
- Decided
- Decision
- Application Permitted
- Received
- 20 Nov 2019
- Validated
- 20 Nov 2019
- Decided
- 29 Nov 2019
- Ward
- Stamford
- Decision by
- Delegated Decision
- Postcode
- KT19 8NG
Timeline
Dates from the published record
-
20 Nov 2019
Received by Epsom and Ewell
-
29 Nov 2019
Decision issued: Application Permitted
-
21 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
31 applications on PlanIndex · across 6 councils · 78% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
Allonby West Hill Epsom Surrey KT19 8JP
T1 Carpinus Betulus (hornbeam) Crown lift the lower branches on the south side of the canopy to a height of 7 metres from ground level, back to the main scaffold with bifurcates into 2 smaller scaffolds. All pruning cuts to be made back to the scaffold branches without leaving stubs of short branch ends. T2 Fagus Sylvatica 'Purpurea Group' (Purple beech) Crown lift the lower branches on the south side of the canopy to a height of 7 metres from ground level, back to the main trunk. There are 4 minor scaffold branches and 6 minor branches which can be removed without damaging the integrity of the tree or spoiling the overall shape and balance of the crown. Remove any ivy growing along the retained scaffolds to allow further light penetration through the canopy to the garden. T3 Fagus Sylvatica 'Asplenifolia' (fern-leaved beech) There are no lower branches to lift and access beneath the canopy is good. Lightly crown thin the upper canopy by 5% to lightly reduce the height and open the canopy allowing more light through to the ground.
Granted Trees 5 docs -
2 Meadway Epsom Surrey KT19 8JR
T1 Ash and T5 Plum - Fell to combat subsidence damage at 2 Meadway, Epsom, KT19 8JR
Granted Trees 7 docs -
-
3 Sharon Close Epsom Surrey KT19 8HY
Lawful Development Certificate - Proposed Use: Formation of a vehicular crossover including dropped kerb and new permeable surface driveway
Granted Lawful development 11 docs -
7 Marshalls Close Epsom Surrey KT19 8HZ
87% historically approved · decision due ~21 Aug
Permitted Development Prior Notification: Single storey rear extension (4.05m in depth, maximum height of 3.00m and eaves height of 2.70m).
Decided ExtensionSmall domestic -
15 West Hill Epsom Surrey KT19 8JN
T1: Yew - Trim by approx .05m all round to re-shape crown. T2: Bay - Remove right-hand stem, trim remaining stems by 1m to re-shape, remove water shoots. T3: Acacia - Fell to ground level.
Granted Trees 7 docs
Other conditions applications
In Epsom and Ewell
-
26/01012/COND Awaiting decision
ALDI 2 Alexandra Road Epsom Surrey KT17 4BJ
Confirmation of Compliance with Condition(s): 12 (Service, Delivery and Operational Management Plan), 21 (Travel Plan) of planning permission 23/00402/FUL allowed at appeal
-
26/00354/COND Granted
Cedars Health And Fitness Suite Woodcote Park Old Barn Road Epsom Surrey KT18 7EW
Confirmation of Compliance with Condition(s): 3 (Sustainability Measures), 5 (Construction Transport Management Plan), 6 (Sustainable Urban Drainage System (SUDS)), 7 (Archaeological Work), 8 (Biodiversity Enhancements) of planning permission 24/01591/FUL
-
26/00991/COND Awaiting decision
Page House 20 - 40 East Street Epsom Surrey KT17 1BH
Confirmation of Compliance with Condition(s): 5 (Bicycle Parking) of planning permission 24/01611/PDCOU
-
26/00969/COND Awaiting decision
Epsom College College Road Epsom Surrey KT17 4JQ
Confirmation of Compliance with Condition(s): 7 (Habitat Management and Monitoring Plan), 8 (Biodiversity Net Gain Plan) of planning permission 25/00545/FUL
-
26/00937/COND Awaiting decision
Sainsbury's Local 63 Dorking Road Epsom Surrey KT18 7JU
Confirmation of Compliance with Condition: 6 (Pedestrian access improvements (Grampian condition) of planning permission 25/01020/FUL