Planning application

Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

Refused Epsom and Ewell 14/00444/FUL Full Planning Permission

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Construction of New Sports Pavilion, access road and car parking, Sports Dome, 3g Artificial Turf Pitch, and Artificial Surface running track.

As published by the council, reference 14/00444/FUL

Application record

Reference
14/00444/FUL
Type
Full Planning Permission
Status
Decided
Decision
Refused As published: Application Refused
Received
6 Aug 2014
Validated
6 Aug 2014
Decided
10 Dec 2014
Ward
Nonsuch
Decision by
Committee Decision
Postcode
SM3 8AB

Site history

Applications at this address on the Epsom and Ewell register

This site has had 8 applications since 2005: 6 approved, 1 refused.

  • 22/00924/TPO Granted

    Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    1)Felling of a Sycamore with Kretzschmaria deusta basal decay (most southerly of the two Sycamores identified on the frontage opposite the side of 81 Anne Bolyns Walk) and 2)Felling of dead Elm stems trees within W2 of TPO 326. 3) Felling of Sycamore with advanced dieback within W1of TPO 326 on the right hand side as you enter the drive/drop off point. The location of the trees are marked in numeric order on the attached plan. Exempt tree work

    Decided 29 Jun 2022 Trees
  • 15/00390/TPO Granted

    Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    Pruning back of trees interfering with the 02 mast in the woodland stand on the school frontage adjacent to the railway line (within W2 TPO 326). See website Ofcom http://www.sitefinder.ofcom.org.uk/search to see the exact mast location.

    Decided 4 Aug 2015 Trees
  • 15/00381/TPO Granted

    Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    gROUPSelective thinning by up to 20% of Ash, Sycamore and Maple regeneration at the woodland edge on the south side of the entrance drive (within W2 TPO 362).

    Decided 3 Aug 2015 Trees
  • 14/01505/COND Granted

    Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    Details pursuant to Condition 2 (Materials) of planning permission 13/01473/FUL.

    Decided 9 Feb 2015 Conditions
  • 13/01473/FUL Granted

    Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    Demolition of existing ROSLA building and existing gymnasium and erection of three-storey teaching block. Single-storey extension to existing school dining facility and alteration to existing caretakers facility to create new pupil entrance.

    Decided 23 May 2014 Full applications
  • 13/01517/FUL Withdrawn

    Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    Construction of new sports pavilion, access road and car parking, sports dome, 3G artificial turf pitch, and artificial surface running track and associated landscaping.

    Decided 9 May 2014 Full applications
  • 04/01223/FUL Granted

    Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    Amendments to previous application (reference 03/0882/FUL) for extension to main building, to form pitched roof over.

    Decided 9 Mar 2005 Full applications

Timeline

Dates from the published record

  1. 6 Aug 2014

    Received by Epsom and Ewell

  2. 10 Dec 2014

    Decision issued: Application Refused

  3. 31 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Appeal: 15/00010/REF (Appeal Granted)

Who's behind it

Company information only, from the register and Companies House

URS Infrastructure & Environment UK Ltd Agent

5 applications on PlanIndex · across 4 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

94 documents on file for this application

  • SITE LOCATION PLAN Plans · 18 Nov 2014
  • TFL COMMENTS Consultation response · 17 Nov 2014
  • LANDSCAPE REPORT - amended Plans · 13 Nov 2014
  • DRAINAGE - proposed Plans · 10 Nov 2014
  • PHASING PLAN - proposed Plans · 10 Nov 2014
  • SITE WEST - proposed Plans · 10 Nov 2014
  • SITE EAST - proposed Plans · 10 Nov 2014
  • PITCHES - proposed Plans · 10 Nov 2014
  • ROADWAY AND PARKING - proposed Plans · 10 Nov 2014
  • ACOUSTIC ANALYSIS - proposed Plans · 10 Nov 2014
  • LANDSCAPE MASTER PLAN - proposed Plans · 10 Nov 2014
  • LANDSCAPE SPECIFICATION AND MANAGEMENT PLAN Supporting Information · 10 Nov 2014
  • PICADY REPORT CURRENT Supporting Information · 10 Nov 2014
  • PICADY REPORT ESTIMATE Supporting Information · 10 Nov 2014
  • SUPPLIMENTARY INFO Supporting Information · 13 Oct 2014
  • AMENDED SITE PLAN Plans · 06 Oct 2014
  • AMENDED SECTION PLAN Plans · 06 Oct 2014
  • AMENDED DOME PLANS Plans · 06 Oct 2014
  • AMENDED SPORTS PAVILION FLOOR PLANS Plans · 06 Oct 2014
  • AMENDED PROPOSED LEVELS Plans · 06 Oct 2014
  • AMENDED PROPOSED PARKING AREA Plans · 06 Oct 2014
  • EXISTING SPORTS USAGE - amended Plans · 06 Oct 2014
  • ACOUSTIC ANALYSIS PLAN - amended Plans · 06 Oct 2014
  • TRANSPORT ASSESSMENT Supporting Information · 06 Oct 2014
  • BAT TRANSECT SURVEY Supporting Information · 06 Oct 2014
  • LBS COMMENTS Consultation response · 11 Sep 2014
  • SPORT ENGLAND COMMENTS Consultation response · 05 Sep 2014
  • ENVIRONMENT AGENCY COMMENT Consultation response · 03 Sep 2014
  • THAMES WATER COMMENTS Consultation response · 01 Sep 2014
  • NEIGHBOUR LETTER Correspondence · 08 Aug 2014
  • LANDSCAPE MASTERPLAN Plans · 06 Aug 2014
  • LANDSCAPE SPECIFICATION AND MANAGEMENT PLAN Supporting Information · 06 Aug 2014
  • TREE SURVEY REPORT Supporting Information · 06 Aug 2014
  • VISUALLY VERIFIABLE PHOTOMONTAGE Photo · 06 Aug 2014
  • PHOTO MONTAGE METHOLOGY STATEMENT Supporting Information · 06 Aug 2014
  • LOCATION PLAN Photo · 06 Aug 2014
  • PHASING PLAN - proposed Plans · 06 Aug 2014
  • PAVILION - proposed Plans · 06 Aug 2014
  • ROADWAY AND PARKING AREAS Plans - Superseded · 06 Aug 2014
  • DRAINAGE STRATEGY - proposed Plans · 06 Aug 2014
  • LEVELS Plans - Superseded · 06 Aug 2014
  • PITCH AND SPORTS DOME - proposed Plans · 06 Aug 2014
  • CIL FORM Supporting Information · 07 Jul 2014
  • PITCH AND SPORTS DOME Plans · 07 Jul 2014
  • SITE SECTIONS Plans - Superseded · 04 Jul 2014
  • CIL FORM Supporting Information · 04 Jul 2014
  • TRANSPORT ASSESSMENT Supporting Information · 04 Jul 2014
  • FLOOD RISK ASSESSMENT Supporting Information · 24 Jun 2014
  • FLOOD RISK ASSESSMENT - TOPOGRAPHIC SURVEY Supporting Information · 24 Jun 2014
  • SPORTS PAVILION FLOOR PLANS - proposed Plans · 24 Jun 2014
  • SPORTS PAVILION ELEVATIONS - proposed Plans · 24 Jun 2014
  • SPORTS PAVILION SECTIONS AND CYCLE/REFUSE PLANS - proposed Plans · 24 Jun 2014
  • ENERGY CONSUMPTION REPORT Supporting Information · 24 Jun 2014
  • SITE LOCATION PLAN Plans - Superseded · 24 Jun 2014
  • SPORTS DOME NORTH AND SOUTH ELEVATIONS Plans - Superseded · 24 Jun 2014
  • SPORTS DOME EAST AND WEST ELEVATIONS Plans - Superseded · 24 Jun 2014
  • 3G PITCH ELEVATIONS - proposed Plans · 24 Jun 2014
  • SPORTS DOME FLOOR PLAN - proposed Plans · 24 Jun 2014
  • SECTIONS 3G PITCH AND DOME Plans - Superseded · 24 Jun 2014
  • 3G PITCH FLOOR PLAN - proposed Plans · 24 Jun 2014
  • PROPOSED SITE LEVELS Plans - Superseded · 24 Jun 2014
  • DRAINAGE STRATEGY Plans - Superseded · 24 Jun 2014
  • SURFACE WATER DRAINAGE STRATEGY - proposed Plans · 24 Jun 2014
  • PHASING PLAN Plans - Superseded · 24 Jun 2014
  • WEST OF SITE Plans - Superseded · 24 Jun 2014
  • EAST OF SITE - proposed Plans · 24 Jun 2014
  • PROPOSED SITE PLAN Plans · 24 Jun 2014
  • EXISTING SITE LEVELS Plans · 24 Jun 2014
  • ROADWAY AND PARKING AREAS Plans - Superseded · 24 Jun 2014
  • RUNNING TRACK - proposed Plans · 24 Jun 2014
  • LIGHT TRANSMISSION THROUGH AIR DOME Supporting Information · 24 Jun 2014
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 24 Jun 2014
  • BREEAM 2011 NEW CONSTRUCTION PRE-ASSESSMENT ESTIMATOR Supporting Information · 24 Jun 2014
  • BREAAM ASSESSMENT - LAND USE AND ECOLOGY SECTION Supporting Information · 24 Jun 2014
  • PRELIMINARY ECOLOGICAL APPRAISAL Supporting Information · 24 Jun 2014
  • GREAT CRESTED NEWT ASSESSMENT Supporting Information · 24 Jun 2014
  • DOUBLE MEMBRANE - AIR DOME Supporting Information · 24 Jun 2014
  • SPORT PITCH MANUFACTURERS SPECIFICATION Supporting Information · 24 Jun 2014
  • SPORT PITCH MANUFACTURERS DETAILS Supporting Information · 24 Jun 2014
  • FULL EMERGENCE BAT SURVEY Supporting Information · 24 Jun 2014
  • PHOTO OF TYPICAL ENCLOSURE AROUND 3G PITCH Supporting Information · 24 Jun 2014
  • 3D IMAGE OF PROPOSED PAVILION Supporting Information · 24 Jun 2014
  • 3D IMAGE OF PROPOSED PAVILION Supporting Information · 24 Jun 2014
  • DESIGN & ACCESS STATEMENT Supporting Information · 24 Jun 2014
  • FLOOD RISK ASSESSMENT - SUPPORTING INFORMATION Supporting Information · 24 Jun 2014
  • DESK BASED ARCHAEOLOGICAL ASSESSMENT Supporting Information · 24 Jun 2014
  • TREE SURVEY Supporting Information · 24 Jun 2014
  • 3D IMAGES OF PROPOSED PAVILION Supporting Information · 24 Jun 2014
  • INITIAL ASSESSMENT BAT SURVEY Supporting Information · 24 Jun 2014
  • SUSTAINABILITY CHECKLIST Supporting Information · 24 Jun 2014
  • TRAVEL PLAN Supporting Information · 24 Jun 2014
  • EXTERNAL FLOODLIGHTING - proposed Plans · 24 Jun 2014
  • FLOODLIGHTING MANUFACTURERS SPECIFICATION Supporting Information · 24 Jun 2014
  • TRANSPORT ASSESSMENT Supporting Information · 24 Jun 2014

Watch members (£5 a month) open the document list from here.

Open the documents

What this refusal means

Epsom and Ewell refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Nonsuch High School For Girls, Ewell Road, Cheam, , SM3 8AB

    A2001/47325 Submitted 12 Mar 2001 50 yards away

    Display of 5 internally illuminated signs.

    Granted
  • Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    22/00924/TPO Submitted 29 Jun 2022 50 yards away

    1)Felling of a Sycamore with Kretzschmaria deusta basal decay (most southerly of the two Sycamores identified on the frontage opposite the side of 81 Anne Bolyns Walk) and 2)Felling of dead Elm stems trees within W2 of TPO 326. 3) Felling of Sycamore with advanced dieback within W1of TPO 326 on the right hand side as you enter the drive/drop off point. The location of the trees are marked in numeric order on the attached plan. Exempt tree work

    Granted Trees 2 docs
  • Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    15/00390/TPO Submitted 12 Jun 2015 50 yards away

    Pruning back of trees interfering with the 02 mast in the woodland stand on the school frontage adjacent to the railway line (within W2 TPO 326). See website Ofcom http://www.sitefinder.ofcom.org.uk/search to see the exact mast location.

    Granted Trees 5 docs
  • Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    15/00381/TPO Submitted 10 Jun 2015 50 yards away

    gROUPSelective thinning by up to 20% of Ash, Sycamore and Maple regeneration at the woodland edge on the south side of the entrance drive (within W2 TPO 362).

    Granted Trees 5 docs
  • Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    14/01505/COND Submitted 23 Jan 2015 50 yards away

    Details pursuant to Condition 2 (Materials) of planning permission 13/01473/FUL.

    Granted Conditions 5 docs
  • Nonsuch High School For Girls Ewell Road Cheam Surrey SM3 8AB

    13/01473/FUL Submitted 5 Mar 2014 50 yards away

    Demolition of existing ROSLA building and existing gymnasium and erection of three-storey teaching block. Single-storey extension to existing school dining facility and alteration to existing caretakers facility to create new pupil entrance.

    Granted Full applications Extension Demolition 39 docs
    Small domestic

In Epsom and Ewell

  • 26/01030/FUL Awaiting decision

    167A Chessington Road West Ewell Surrey KT19 9XE

    First floor rear extension and roof extension to accommodate a habitable space incorporating a rear dormer and front roof light .

    Full applications
  • 26/01028/FUL Awaiting decision

    6 Middleton Road Epsom Surrey KT19 9HE

    Change of Use of a residential dwelling (Class C3 use) to a House in Multiple Occupation (HMO)

    Full applications
  • 26/01181/FUL Awaiting decision

    BARCLAYS 82 - 84 High Street Epsom Surrey KT19 8BA

    Removal of one existing external ATM with resulting opening infilled with matching stone. Replacement of the existing Secure ATM surround with a new surround.

    Full applications
  • 26/01189/FUL Awaiting decision

    The Looe Reigate Road Ewell Surrey KT17 3BZ

    Retention of a storage area and 2no. containers with Class B2 (Storage and Distribution)

    Full applications
  • 26/01115/FUL Awaiting decision

    Garages At Rear Moorland Court Ardrossan Gardens Worcester Park Surrey KT4 7AD

    Replacement vehicular access gate and adjacent fixed fence panel.

    Full applications