Skip to content
PlanIndex Get alerts
Menu

Planning application

48, Baldwins Hill, Loughton, IG10 1SF

Granted Epping Forest EPF/2909/22 Householder planning permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of solar panels to roof of existing dwelling

As published by the council, reference EPF/2909/22

Application record

Reference
EPF/2909/22
Type
Householder planning permission
Status
Decision Made
Decision
Approve with Conditions
Received
22 Dec 2022
Validated
22 Dec 2022
Decided
14 Feb 2023
Ward
Loughton St. John's
Parish
Loughton
Decision by
Delegated Decision
Postcode
IG10 1SF

Site history

Applications at this address on the Epping Forest register

This site has had 2 applications since 2022: 2 approved, 0 refused.

  • EPF/1181/26 Granted

    48, Baldwins Hill, Loughton, IG10 1SF

    Baldwin's Hill Conservation Area T1: Poplar - Fell. T2 & T3: Poplar - Crown reduce by up to 5m.

    Submitted 12 Jun 2026 Trees

Timeline

Dates from the published record

  1. 22 Dec 2022

    Received by Epping Forest

  2. 14 Feb 2023

    Decision issued: Approve with Conditions

  3. 13 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Epping Forest granted permission on 14 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land at Whitakers Way to the rear of the rear of 47 - 49 Baldwins Hill Loughton IG10 1SF

    EPF/0086/26 Submitted 14 Jan 2026 0m away

    64% historically approved · decision due ~11 Mar

    Erection of 2 storey 3 bedroom self-build detached dwelling.

    Awaiting decision Full applications New dwelling 22 docs
    Domestic
  • 31, Baldwins Hill, Loughton, IG10 1SF

    EPF/1848/24 Submitted 9 Sep 2024 0m away

    Grade II listed building application for replacement windows.

    Granted Heritage and listed buildings Windows or glazing 10 docs
  • 48, Baldwins Hill, Loughton, IG10 1SF

    EPF/1181/26 Submitted 12 Jun 2026 0m away

    Baldwin's Hill Conservation Area T1: Poplar - Fell. T2 & T3: Poplar - Crown reduce by up to 5m.

    Granted Trees 10 docs
  • 48 BALDWINS HILL, LOUGHTON

    EPF/1585/00 Submitted 25 Sep 2000 31m away

    Driveway gates lamp post lighting and renewal of driveway lighting.

    Granted Full applications 2 docs
  • 29 BALDWINS HILL, LOUGHTON

    EPF/1526/00 Submitted 6 Sep 2000 39m away

    Single storey side extension (amended application).

    Refused Full applications Extension 2 docs
    Small domestic
  • 29 BALDWINS HILL, LOUGHTON

    LB/EPF/1527/00 Submitted 6 Sep 2000 39m away

    Listed Building application for a single storey side extension (revised application).

    Refused Heritage and listed buildings Extension 2 docs
    Small domestic

In Epping Forest

  • EPF/0836/26 Refused

    20, Oak Lodge Avenue, Chigwell, IG7 5HZ

    Proposed ground floor rear extension, part first floor rear and double storey side extension. Alteration to roof and front bay windows.

    28 Apr 2026 Householder
  • EPF/1337/26 Granted

    12 Great Stony Park, High Street, Ongar, CM5 0TH

    Proposed garage conversion to office use

    8 Jul 2026 Householder
  • EPF/1725/26 Awaiting decision

    29, Mount Pleasant Road, Chigwell, IG7 5EP

    Front porch, rear 6m extension, 1 foot rear extension, dormer extension.

    9 Sep 2026 Householder
  • EPF/1709/26 Awaiting decision

    Greenways, Moreton Bridge, Moreton, Ongar, CM5 0LL

    Erection of gable and side extensions, and associated works.

    8 Sep 2026 Householder
  • EPF/1720/26 Awaiting decision

    24, Rous Road, Buckhurst Hill, IG9 6BN

    Single storey rear infill extension and hipped roof over existing 2 storey side extension

    8 Sep 2026 Householder