Planning application
32 Centre Avenue Epping CM16 4JU
Works: Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey rear extension, loft conversion with a rear dormer.
As published by the council, reference EPF/1764/21
Application record
- Reference
- EPF/1764/21
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Approve with Conditions
- Received
- 24 Jun 2021
- Validated
- 13 Jul 2021
- Decided
- 2 Sep 2021
- Ward
- Epping East
- Parish
- Epping
- Decision by
- Delegated Decision
- Postcode
- CM16 4JU
Timeline
Dates from the published record
-
24 Jun 2021
Received by Epping Forest
-
13 Jul 2021
Validated
Checked as complete and ready for consideration.
-
2 Sep 2021
Decision issued: Approve with Conditions
-
3 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
16, Centre Avenue, Epping, CM16 4JU
Ground floor front and rear extension, first floor front, rear and side extension and roof extension by introduction of a rear dormer
Refused Householder Extension Loft or dormer 14 docsDomestic -
5, Centre Avenue, Epping, CM16 4JU
Single storey rear extension.
Granted Householder Extension 17 docsSmall domestic -
37 Springfield Epping CM16 4LA
Single storey front extension.
Granted Full applications Extension 2 docsSmall domestic -
2 Orchard Heights, Sunnyside Road, Epping, CM16 4JP
TPO/EPF/16/06 T1: Oak - Crown reduce, as specified.
Granted Trees 6 docs -
30 Bridge Hill and Land to the Rear, Epping, CM16 4ER
Demolition of one residential dwelling on Bridge Hill and the construction of nine new dwellings, incorporating new access, parking, landscaping, and pedestrian and cycle connections.
Granted Full applications New dwelling Demolition 134 docsSeveral homes -
30 Bridge Hill and Land to the rear, Bridge Hill, Epping, CM16 4ER
90% historically approved · decision due ~14 Oct
Approval of Details Reserved by Conditions 7 Construction Method Statement (CMS), 9 Hard and Soft Landscaping, 10 Tree Protection Plan and Arboricultural Method Statement (TPP/AMS), 11 Contaminated Land, 12 Construction Environment Management Plan (CEMP), 13 Landscape Ecological Management Plan (LEMP), and 17 Habitat Management and Monitoring Plan (HMMP) of EPF/0863/25 (Demolition of one residential dwelling on Bridge Hill and the construction of nine new dwellings, incorporating new access, parking, landscaping, and pedestrian and cycle connections).
Awaiting decision Conditions New dwelling Demolition +1 4 docsSeveral homes
Other full applications applications
In Epping Forest
-
EPF/1035/26 Refused
Beechside Nursery, Mott Street, Waltham Abbey, E4 7RW
Residential redevelopment of mixed B8 and E use site for 5 new dwellings.
-
EPF/1673/26 Awaiting decision
Gypsy Mead Works, Ongar Road, Fyfield, Ongar, CM5 0RB
Proposed boundary amendment to previously consented scheme under EPF/0016/19 relating to Plots 5 to 6 (Proposed development of x 23 no. new homes with associated parking facilities, cycle stores and rubbish disposal (FYF.R1 - Allocated Site in Fyfield).
-
EPF/1417/26 Granted
Epping Sports Club, Lower Bury Lane, Epping, CM16 5HA
Erection of safety netting along the northeast boundary of the cricket club and Lower Bury Lane.
-
EPF/1036/26 Granted
Bentons Farm, Middle Street, Nazeing, Waltham Abbey, EN9 2LN
Proposed Infill to create 1 chalet-style dwelling.
-
EPF/1311/26 Refused
Carlton Farm, Middle Street, Nazeing, Waltham Abbey, EN9 2LH
Erection of agricultural barn.