Skip to content
PlanIndex Get alerts
Menu

Planning application

170, High Street, Epping, CM16 4AQ

Awaiting decision Epping Forest EPF/1574/26 Full planning permission

Works: Loft or dormer

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Loft conversion and construction of dormer.

As published by the council, reference EPF/1574/26

Application record

Reference
EPF/1574/26
Type
Full planning permission
Status
Under Consultation
Received
14 Aug 2026
Validated
19 Aug 2026
Ward
Epping East
Parish
Epping
Postcode
CM16 4AQ

Comment by 9 September 2026

The council is taking comments on this application until then. Comments go to Epping Forest through their own planning portal.

Timeline

Dates from the published record

  1. 14 Aug 2026

    Received by Epping Forest

  2. 19 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 27 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 14 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Epping Forest took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Epping Forest for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 166, High Street, Epping, CM16 4AQ

    EPF/1501/26 Submitted 5 Aug 2026 0m away

    70% historically approved · decision due ~2 Oct

    Change of use of first and second floor including renovation of front façade and rear extension to create maisonette over existing commercial unit.

    Awaiting decision Full applications Extension 29 docs
  • 196A High Street, Epping, CM16 4AQ

    EPF/2199/24 Submitted 31 Oct 2024 0m away

    Prior approval for change of use of first floor accommodation from Class E (office) to residential use to create 2no flats.

    Granted Prior approval New dwelling 17 docs
    Several homes
  • 229 High Street Epping CM16 4BP

    EPF/1702/21 Submitted 18 Jun 2021 54m away

    Application for Consent to display an illuminated folded aluminium 3 part background fascia sign with 80mm returns.

    Granted Advertising 6 docs
  • 229 High Street Epping CM16 4BP

    EPF/1800/21 Submitted 18 Jun 2021 54m away

    Application for Listed Building Consent for an illuminated folded aluminium 3 part background fascia sign with 80mm returns.

    Granted Heritage and listed buildings 5 docs
  • 225, High Street, Epping, CM16 4BL

    EPF/1518/26 Submitted 7 Aug 2026 64m away

    Approval of Details Reserved by Condition 3 Roof tiles of EPF/0327/26 (Grade II Listed Building consent for proposed external repair, replacement and refurbishment works).

    Granted Conditions Roofing 5 docs
  • 225, High Street, Epping, CM16 4BL

    EPF/1524/26 Submitted 7 Aug 2026 64m away

    89% historically approved · decision due ~2 Oct

    Approval of Details Reserved by Condition 4 Roof of EPF/0327/26 (Grade II Listed Building consent for proposed external repair, replacement and refurbishment works).

    Awaiting decision Conditions 8 docs

In Epping Forest

  • EPF/1035/26 Refused

    Beechside Nursery, Mott Street, Waltham Abbey, E4 7RW

    Residential redevelopment of mixed B8 and E use site for 5 new dwellings.

    27 May 2026 Full applications
  • EPF/1673/26 Awaiting decision

    Gypsy Mead Works, Ongar Road, Fyfield, Ongar, CM5 0RB

    Proposed boundary amendment to previously consented scheme under EPF/0016/19 relating to Plots 5 to 6 (Proposed development of x 23 no. new homes with associated parking facilities, cycle stores and rubbish disposal (FYF.R1 - Allocated Site in Fyfield).

    1 Sep 2026 Full applications
  • EPF/1417/26 Granted

    Epping Sports Club, Lower Bury Lane, Epping, CM16 5HA

    Erection of safety netting along the northeast boundary of the cricket club and Lower Bury Lane.

    21 Jul 2026 Full applications
  • EPF/1036/26 Granted

    Bentons Farm, Middle Street, Nazeing, Waltham Abbey, EN9 2LN

    Proposed Infill to create 1 chalet-style dwelling.

    27 May 2026 Full applications
  • EPF/1311/26 Refused

    Carlton Farm, Middle Street, Nazeing, Waltham Abbey, EN9 2LH

    Erection of agricultural barn.

    2 Jul 2026 Full applications