Skip to content
PlanIndex Get alerts
Menu

Planning application

EPF/1406/26

2, Wedgewood Close, Epping, CM16 4QD

Awaiting decision Epping Forest Householder planning permission

Proposal

Single storey flat roof extension with parapet wall and part garage conversion.

As published by the council, reference EPF/1406/26

Timeline

Dates from the published record

  1. 20 Jul 2026

    Received by Epping Forest

  2. 23 Jul 2026

    Added to PlanIndex

  3. 31 Jul 2026

    Status changed to Under Consultation

    Previously Valid.

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Epping Forest for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About householder applications

How this application type works

Householder applications cover work to an existing house and its garden: extensions, loft and garage conversions, porches, outbuildings and similar alterations within the boundary of the home. They cannot be used to create a separate dwelling or change what the building is used for. Councils aim to decide them within eight weeks, and immediate neighbours are usually notified and given a chance to comment.

More on householder applications in our guide

Nearby applications

Within 500 metres

  • EPF/1212/21 Granted

    Land adjacent to 2 Hartland Road Epping CM16 4PE

    TPO/EPF/18/01 T1: Lime - Crown lift to 4.5m from ground level, as specified. T2-T20: 19 x Limes - Reduce lateral spread, of branches overhanging 2 Hartland Road, by up to 2.5m as specified.

    29 Apr 2021 114m away Trees
  • EPF/1737/25 Granted

    236, High Street, Epping, CM16 4AP

    Epping Conservation Area T1 & T2: Lime - Crown reduce by up to 2.5m.

    28 Aug 2025 195m away Trees
  • EPF/2595/25 Granted

    Civic Offices, Conder Building and Car Park, 323 High Street, Epping, CM16 4BZ

    Approval of Details Reserved by Conditions 8 (Boundary Treatment), 9 (External Lighting), 11 (Hard and Soft Landscaping) and Condition 14 (CEMP:Biodiversity) of EPF/0919/21 (The redevelopment of the existing office building and car park. Demolition of the existing office building and alterations to connection to existing Listed Civic Centre. Development to comprise new apartment buildings and houses to provide a mix of residential units (Use Class C3), revised vehicular and pedestrian access from High Street, all associated car and cycle parking, servicing, hard and soft landscaping and associated works).

    23 Dec 2025 236m away Conditions
  • EPF/2054/25 Awaiting decision

    283, High Street, Epping, CM16 4DA

    Proposed Flatted Development for seven new flats.

    8 Oct 2025 242m away Full applications
  • EPF/0964/26 Split decision

    287, High Street, Epping, CM16 4DA

    Approval of Details Reserved by Condition No. 3: External Finishes of EPF/2052/22 (Proposed 1 no. 3 storey and 1 no. 2 storey buildings to accommodate x 5 residential units (4, 1bed units and 1, 2 bed unit) with communal open space, landscaping and associated works).

    18 May 2026 242m away Conditions
  • EPF/1216/26 Awaiting decision

    293, High Street, Epping, CM16 4DA

    Grade II Listed building consent for external repair to render.

    18 Jun 2026 242m away Heritage and listed buildings

In Epping Forest

  • EPF/1110/26 Granted

    13 Parkside, Harlow Road, Matching Tye, Harlow, CM17 0QW

    Demolition of an existing rear extension & existing outbuilding, replacement with the erection of single storey rear / side extension.

    4 Jun 2026 Householder
  • EPF/1474/26 Awaiting decision

    Maltings, 251 Nine Ashes Road, High Ongar, Ongar, CM4 0LA

    Demolition of existing front porch and construction of an enlarged front porch to the principal elevation.

    31 Jul 2026 Householder
  • EPF/1463/26 Awaiting decision

    35, Church Hill, Epping, CM16 4RA

    Demolition of existing garage and rear conservatory, construction of single storey side/rear extension, part first floor rear extension, basement extension with light well and relaying front driveway/forecourt along with associated internal alterations.

    29 Jul 2026 Householder
  • EPF/1087/26 Refused

    27, York Hill, Loughton, IG10 1RP

    Formation of new door opening in gable end to provide access to the existing flat roof area. Addition of guardrails/balustrade to flat roof perimeter.

    3 Jun 2026 Householder
  • EPF/1097/26 Granted

    47, Fallow Fields, Loughton, IG10 4QP

    Orangery extension to rear.

    4 Jun 2026 Householder