Planning application

Waltham Cross to Tottenham Substation, near to Highbridge Street, Waltham Abbey

Awaiting decision Epping Forest EPF/1214/26 Approval of details reserved by a condition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application to discharge Requirement 13 (Stage 5a) - Construction Environment Management Plan by National Grid Electricity Transmission plc for an Order Granting Development Consent for the North London Reinforcement Project for the uprating of an existing 275kV transmission line of approximately 14km in length from Waltham Cross substation to Tottenham substation to enable it to run at a voltage of 400kV, together with associated development.

As published by the council, reference EPF/1214/26

Application record

Reference
EPF/1214/26
Type
Approval of details reserved by a condition
Status
Under Consultation
Received
18 Jun 2026
Validated
18 Jun 2026
Ward
Waltham Abbey West
Parish
Waltham Abbey

Site history

Applications at this address on the Epping Forest register

This site has had 6 applications since 2026: 4 approved, 0 refused.

  • EPF/1213/26 Awaiting decision

    Waltham Cross to Tottenham Substation, near to Highbridge Street, Waltham Abbey

    Application to discharge Requirement 13 (Stage 5b) - Construction Environment Management Plan by National Grid Electricity Transmission plc for an Order Granting Development Consent for the North London Reinforcement Project for the uprating of an existing 275kV transmission line of approximately 14km in length from Waltham Cross substation to Tottenham substation to enable it to run at a voltage of 400kV, together with associated development.

    Submitted 18 Jun 2026 Conditions
  • EPF/1170/26 Granted

    Waltham Cross to Tottenham Substation, near to Highbridge Street, Waltham Abbey

    Application to discharge Requirement 11 (Stage 5b) - Contaminated Land Strategy by National Grid Electricity Transmission plc for an Order Granting Development Consent for the North London Reinforcement Project for the uprating of an existing 275kV transmission line of approximately 14km in length from Waltham Cross substation to Tottenham substation to enable it to run at a voltage of 400kV, together with associated development.

    Decided 22 Jul 2026 Conditions
  • EPF/1122/26 Granted

    Waltham Cross to Tottenham Substation, near to Highbridge Street, Waltham Abbey

    Application to discharge Requirement 4 (Stage 5a) - In Accordance with Approved Details by National Grid Electricity Transmission plc for an Order Granting Development Consent for the North London Reinforcement Project for the uprating of an existing 275kV transmission line of approximately 14km in length from Waltham Cross substation to Tottenham substation to enable it to run at a voltage of 400kV, together with associated development.

    Decided 23 Jun 2026 Conditions
  • EPF/1123/26 Granted

    Waltham Cross to Tottenham Substation, near to Highbridge Street, Waltham Abbey

    Application to discharge Requirement 12 (Stage 5b) - Ecological Management Strategy by National Grid Electricity Transmission plc for an Order Granting Development Consent for the North London Reinforcement Project for the uprating of an existing 275kV transmission line of approximately 14km in length from Waltham Cross substation to Tottenham substation to enable it to run at a voltage of 400kV, together with associated development.

    Decided 15 Jul 2026 Conditions
  • EPF/1094/26 Granted

    Waltham Cross to Tottenham Substation, near to Highbridge Street, Waltham Abbey

    Application to discharge Requirement 10 (Stage 5a) - Surface Water Drainage by National Grid Electricity Transmission plc for an Order Granting Development Consent for the North London Reinforcement Project for the uprating of an existing 275kV transmission line of approximately 14km in length from Waltham Cross substation to Tottenham substation to enable it to run at a voltage of 400kV, together with associated development.

    Decided 9 Jul 2026 Conditions

Timeline

Dates from the published record

  1. 18 Jun 2026

    Received by Epping Forest

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Epping Forest took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Epping Forest for determination, against a statutory target of eight weeks. Over the last year Epping Forest decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Epping Forest

  • EPF/1684/26 Awaiting decision

    177 High Road Chigwell IG7 6NX

    Approval of Details Reserved by Condition 18 Contaminated Land of EPF/2868/20 Allowed on Appeal (Proposed mixed-use development to provide 35 residential dwellings (Use Class C3) and 512 sqm of commercial floorspace (Use Class E) together with cycle and car parking, landscaping, provision of new pavement and loading bay on Brook Mews and associated infrastructure).

    3 Sep 2026 Conditions
  • EPF/0678/26 Split decision

    Alandale Scaffolding, Langston Road, Loughton IG10 3SL

    Approval of Details Reserved by Condition 4 (Contaminated Land) of EPF/1165/22 & EPF/0388/26 (New Data Centre).

    1 Apr 2026 Conditions
  • EPF/1676/26 Awaiting decision

    16, Palmers Hill, Epping, CM16 6SQ

    Approval of Details Reserved by Conditions 7 Surface Water Disposal, 8 Construction Method Statement, 9 EVP, 13 Biodiversity Enhancement Strategy and 14 Habitat Management and Monitoring Plan of EPF/1008/25 (Demolition of existing rear extension and relocation of upper and lower windows. Erection of new adjoining single dwelling and amendments to the existing driveway access).

    2 Sep 2026 Conditions
  • EPF/1518/26 Granted

    225, High Street, Epping, CM16 4BL

    Approval of Details Reserved by Condition 3 Roof tiles of EPF/0327/26 (Grade II Listed Building consent for proposed external repair, replacement and refurbishment works).

    7 Aug 2026 Conditions
  • EPF/1509/26 Granted

    19, Globe Cottage, Lambourne Road, Chigwell, IG7 6HA

    Approval of Details Reserved by Conditions 5 and 22 Foul and Surface Water Drainage of EPF/0834/22 (The development of three family dwellings on the site of the previously consented scheme at 19 Lambourne Road. The proposal is comprised of three 4-bedroom dwellings, similar in height, materials & style to the neighbouring buildings).

    6 Aug 2026 Conditions