Skip to content
PlanIndex Get alerts
Menu

Planning application

35, Old Park Road South, Enfield, EN2 7DD

Granted Enfield TP/07/0301 Full Application

Works: Extension Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Part single, part 2 storey front extension, rear conservatory, first floor rear extension & formation of front & rear dormer windows (amendment to scheme approved under ref: TP/06/0481).

As published by the council, reference TP/07/0301

Application record

Reference
TP/07/0301
Type
Full Application
Status
Decided
Decision
Granted With Conditions
Received
13 Feb 2007
Validated
13 Feb 2007
Decided
5 Apr 2007
Decision by
Delegated Decision
Postcode
EN2 7DD

Timeline

Dates from the published record

  1. 13 Feb 2007

    Received by Enfield

  2. 5 Apr 2007

    Decision issued: Granted With Conditions

  3. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 35 Old Park Road South Enfield EN2 7DD

    22/01193/HOU Submitted 6 Apr 2022 0m away

    First floor rear infill extension.

    Granted Householder Extension 11 docs
    Domestic
  • 52 Old Park Road South Enfield EN2 7DB

    22/01196/HOU Submitted 6 Apr 2022 63m away

    Part two storey, part single storey side extension.

    Granted Householder Extension 7 docs
    Small domestic
  • 26 The Glen Enfield EN2 7BZ

    26/03276/FUL Submitted 31 Jul 2026 94m away

    68% historically approved · decision due ~6 Oct

    Sub-division of site and erection of a 2-storey detached dwelling house with accommodation in roof space involving solar panels together with associated parking, private amenity space, secured cycle store and bin store. (RETROSPECTIVE).

    Awaiting decision Full applications New dwelling
    Domestic
  • 19 The Coppice Enfield EN2 7BX

    22/00645/HOU Submitted 23 Feb 2022 122m away

    Demolition of existing garage and outbuilding and replacing with single storey side extension.

    Granted Householder Extension Demolition 8 docs
    Small domestic
  • 8 The Coppice Enfield EN2 7BY

    25/04214/OUT Submitted 5 Dec 2025 164m away

    78% historically approved · decision due ~10 Apr

    Sub-division of site and erection of a detached 2-storey dwelling at side (OUTLINE-all matters reserved).

    Awaiting decision Outline 9 docs
    Domestic
  • 188 Gladbeck Way Enfield EN2 7HS

    23/03146/HOU Submitted 26 Sep 2023 178m away

    Rear dormers, with raising the existing level of the roof by 350 mm in order to add a habitable floor with front rooflights.

    Granted Householder Loft or dormer 12 docs
    Domestic

In Enfield

  • 26/02060/FUL Granted

    292 - 296 Firs Lane London N13 5QQ

    Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).

    18 May 2026 Full applications
  • 26/03701/FUL Awaiting decision

    30 Gordon Road London N9 0LU

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear infill extension, rear dormer to outrigger dormer, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03688/FUL Awaiting decision

    16 Goldsdown Road Enfield EN3 7QZ

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer and new ground floor flank window, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03683/FUL Awaiting decision

    152 Galliard Road London N9 7LP

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension and rear dormer with front rooflights.

    1 Sep 2026 Full applications
  • 26/03673/FUL Awaiting decision

    80 Stoneleigh Avenue Enfield EN1 4HH

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension with roof extension to side, rear dormer and front roof lights.

    1 Sep 2026 Full applications