Skip to content
PlanIndex Get alerts
Menu

Planning application

Sports Ground Bull Lane London N18 1RA

Awaiting decision Enfield 26/03316/CND

Works: New dwelling Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details submitted pursuant to reference 24/03470/FUL: artificial grass pitch (16) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.

As published by the council, reference 26/03316/CND

Application record

Reference
26/03316/CND
Status
Application in Progress
Received
4 Aug 2026
Validated
4 Aug 2026
Postcode
N18 1RA

Site history

Applications at this address on the Enfield register

This site has had 7 applications since 2026: 3 approved, 0 refused.

  • 26/03343/CND Awaiting decision

    Sports Ground Bull Lane London N18 1RA

    Details submitted pursuant to reference 24/03470/FUL: Secured By Design (5) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.

    Submitted 6 Aug 2026
  • 26/02865/CND Decided

    Sports Ground Bull Lane London N18 1RA

    Details submitted pursuant to reference 24/03470/FUL: archaeology public engagement (7) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.

    Submitted 7 Jul 2026
  • 26/02864/CND Decided

    Sports Ground Bull Lane London N18 1RA

    Details submitted pursuant to reference 24/03470/FUL: bat survey (Condition 8 in connection with Phase 1) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.

    Submitted 7 Jul 2026
  • 26/02345/CND Granted

    Sports Ground Bull Lane London N18 1RA

    Details submitted pursuant to reference 24/03470/FUL: Construction Logistics and Environmental Management Plan (23) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.

    Decided 20 Jul 2026 Conditions
  • 26/02340/CND Granted

    Sports Ground Bull Lane London N18 1RA

    Details submitted pursuant to reference 24/03470/FUL: written scheme of investigation stage 1 (6) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.

    Decided 17 Jul 2026 Conditions
  • 26/02343/CND Granted

    Sports Ground Bull Lane London N18 1RA

    Details submitted pursuant to reference 24/03470/FUL: arboricultural method statement and tree protection plan (10) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.

    Decided 16 Jul 2026 Conditions

Timeline

Dates from the published record

  1. 4 Aug 2026

    Received by Enfield

  2. 11 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 29 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Enfield took a median of 63 days over the applications it decided in the last year.

What happens while it is decided

This application is with Enfield for determination, against a statutory target of eight weeks. Over the last year Enfield's median decision took 63 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Enfield's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Sports Ground Bull Lane London N18 1RA

    26/02865/CND Submitted 7 Jul 2026 0m away

    78% historically approved · decision due ~1 Sep

    Details submitted pursuant to reference 24/03470/FUL: archaeology public engagement (7) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.

    Decided New dwelling
    Small domestic
  • Sports Ground Bull Lane London N18 1RA

    26/02864/CND Submitted 7 Jul 2026 0m away

    78% historically approved · decision due ~1 Sep

    Details submitted pursuant to reference 24/03470/FUL: bat survey (Condition 8 in connection with Phase 1) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.

    Decided New dwelling
    Small domestic
  • Sports Ground Bull Lane London N18 1RA

    26/03343/CND Submitted 6 Aug 2026 0m away

    78% historically approved · decision due ~1 Oct

    Details submitted pursuant to reference 24/03470/FUL: Secured By Design (5) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.

    Awaiting decision New dwelling
    Small domestic
  • Land Rear Of Unit 7 Landmark Commercial Centre Commercial Road London N18 1UB

    21/04769/FUL Submitted 21 Dec 2021 33m away

    Siting of container for use as commercial kitchen and ancillary development.

    Refused Full applications 13 docs
  • Unit 3 Landmark Commercial Centre Commercial Road London N18 1UB

    20/02834/FUL Submitted 4 Sep 2020 104m away

    Change of use from storage (Class B8) to gym (Class D2) involving alterations to fenestration on front elevation.

    Refused Full applications Windows or glazing 11 docs
  • Unit 21 Landmark Commercial Centre Commercial Road London N18 1UB

    26/02311/FUL Submitted 3 Jun 2026 124m away

    68% historically approved · decision due ~7 Sep

    Part use of ground floor as takeaway food preparation unit with internal configuration and aluminium glazed pergola at front (RETROSPECTIVE).

    Awaiting decision Full applications Windows or glazing