Skip to content
PlanIndex Get alerts
Menu

Planning application

315 - 317 Green Lanes London N13 4TB

Awaiting decision Enfield 26/03086/FUL Full applications

Works: New dwelling Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of existing upper floors, 3 x self-contained flats (Class C3) to a 13-bedroom, HMO- house in multiple occupation (Sui Generis), involving part 3-storey rear extension.

As published by the council, reference 26/03086/FUL

Application record

Reference
26/03086/FUL
Category
Full applications
Status
Application in Progress
Received
20 Jul 2026
Validated
14 Aug 2026
Postcode
N13 4TB

Timeline

Dates from the published record

  1. 20 Jul 2026

    Received by Enfield

  2. 14 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 19 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 9 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Enfield took a median of 63 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Enfield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2 Upsdell Avenue London N13 6JN

    24/00170/CEA Submitted 22 Jan 2024 70m away

    Outbuilidng to rear.

    Granted Lawful development 7 docs
  • 15 Belsize Avenue London N13 4TL

    22/01222/CEA Submitted 8 Apr 2022 79m away

    Single storey rear extension.

    Granted Lawful development Extension 10 docs
    Small domestic
  • 14 Green Lanes London N13 6JR

    21/04679/FUL Submitted 15 Dec 2021 120m away

    Change of use from ground floor delicatessen/supermarket (A1) to Bakery with food consumption (A3) with outdoor seating area at front (RETROSPECTIVE).

    Granted Full applications 7 docs
  • 14 Green Lanes London N13 6JR

    22/00499/ADV Submitted 11 Feb 2022 121m away

    Installation of internally illuminated fascia shop, canopy sign and hanging sign.

    Granted Advertising 5 docs
  • Public Footpath Outside 16 Green Lanes London N13 6JR

    26/02271/ADV Submitted 1 Jun 2026 127m away

    78% historically approved · decision due ~6 Aug

    Installation of 1 x BT Street Hub Unit with internally illuminated advertisement panels on either side of the unit

    Decided Advertising
  • Public Footpath Outside 16 Green Lanes London N13 6JR

    26/02270/FUL Submitted 1 Jun 2026 127m away

    68% historically approved · decision due ~6 Aug

    Replacement of existing BT phone box with installation of a global street hub with associated advertising screens on both sides of the unit.

    Decided Full applications

In Enfield

  • 26/02060/FUL Granted

    292 - 296 Firs Lane London N13 5QQ

    Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).

    18 May 2026 Full applications
  • 26/03701/FUL Awaiting decision

    30 Gordon Road London N9 0LU

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear infill extension, rear dormer to outrigger dormer, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03688/FUL Awaiting decision

    16 Goldsdown Road Enfield EN3 7QZ

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer and new ground floor flank window, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03683/FUL Awaiting decision

    152 Galliard Road London N9 7LP

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension and rear dormer with front rooflights.

    1 Sep 2026 Full applications
  • 26/03673/FUL Awaiting decision

    80 Stoneleigh Avenue Enfield EN1 4HH

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension with roof extension to side, rear dormer and front roof lights.

    1 Sep 2026 Full applications