Planning application
National Grid Overhead Electric Line Part Adjacent To River Lee Navigation, Brimsdown Substation, Mollison Avenue, Enfield
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Details submitted to discharge Schedule 2, requirement 9 (1) (Stage 2a) Construction Traffic Management Plan (CTMP) in relation to the National Grid (north London reinforcement project) order 2014.
As published by the council, reference 26/02885/DCO
Application record
- Reference
- 26/02885/DCO
- Status
- Application Withdrawn
- Received
- 8 Jul 2026
- Validated
- 8 Jul 2026
Site history
Applications at this address on the Enfield register
This site has had 4 applications since 2026: 1 approved, 0 refused.
-
26/02480/DCO Decided
National Grid Overhead Electric Line Part Adjacent To River Lee Navigation, Brimsdown Substation, Mollison Avenue, Enfield
Details submitted to discharge schedule 2, Requirement 10 - Surface Water Drainage [Stage 5d] in relation to the National Grid (North London Reinforcement Project) Order 2014 Requirement 10 (Stage 5d) Surface Water Drainage
-
26/02388/DCO Granted
National Grid Overhead Electric Line Part Adjacent To River Lee Navigation, Brimsdown Substation, Mollison Avenue, Enfield
Details submitted to discharge schedule 2, Requirement 12 (Stage 5d)- Ecological Management Plan in relation to the National Grid (North London Reinforcement Project) Order 2014.
-
26/02387/DCO Decided
National Grid Overhead Electric Line Part Adjacent To River Lee Navigation, Brimsdown Substation, Mollison Avenue, Enfield
Details submitted to Discharge Schedule 2, Requirement 14 - Archaeology [Stage 5d] in relation to the National Grid (north London reinforcement project) Order 2014
Timeline
Dates from the published record
-
8 Jul 2026
Received by Enfield
-
25 Jul 2026
Added to PlanIndex
What withdrawal means
The applicant withdrew this application before Enfield decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Enfield's portal will say. Our guide explains the common types.