Skip to content
PlanIndex Get alerts
Menu

Planning application

27 Sweet Briar Green London N9 9NJ

Awaiting decision Enfield 26/02670/FUL Full applications

Works: New dwelling Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Sub-division of site and erection of a single storey detached dwelling house at side.

As published by the council, reference 26/02670/FUL

Application record

Reference
26/02670/FUL
Category
Full applications
Status
Application in Progress
Received
23 Jun 2026
Validated
5 Aug 2026
Postcode
N9 9NJ

Timeline

Dates from the published record

  1. 23 Jun 2026

    Received by Enfield

  2. 5 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Enfield took a median of 63 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Enfield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 4 Dunholme Lane London N9 9NL

    22/01892/CEA Submitted 26 May 2022 30m away

    Refurbishment works to include: external wall insulation, extension to roof on all elevations, gas heating and ventilation systems, replacement windows and doors and installation of solar panels.

    Granted Lawful development Extension Windows or glazing 14 docs
  • 47 Chalfont Road London N9 9LZ

    26/01771/FUL Submitted 1 May 2026 100m away

    68% historically approved · decision due ~31 Aug

    Conversion of dwelling house into 3 self-contained flats including single storey front extension, part single, part 2-storey side/rear extension, construction of hard standing and provision for refuse.

    Awaiting decision Full applications New dwelling Extension 23 docs
    Small domestic
  • 56 Park Lane London N9 9BG

    23/03695/HOU Submitted 13 Nov 2023 131m away

    Part single, part 2-storey side and rear extension and front porch.

    Granted Householder Extension 13 docs
    Small domestic
  • 56 Park Lane London N9 9BG

    23/03696/CEA Submitted 13 Nov 2023 131m away

    Hip to gable roof extension and rear dormer extension together with front rooflights.

    Granted Lawful development Extension Loft or dormer 11 docs
  • 27 South Eastern Avenue London N9 9NR

    26/03379/HOU Submitted 10 Aug 2026 171m away

    75% historically approved · decision due ~5 Oct

    Front entrance porch.

    Awaiting decision Householder Extension
    Small domestic
  • 26 South Eastern Avenue London N9 9NS

    22/01949/CEA Submitted 31 May 2022 172m away

    Refurbishment works to include: external wall insulation, extension to roof on all elevations, gas heating and ventilation systems, replacement windows and doors and installation of solar panels.

    Granted Lawful development Extension Windows or glazing 11 docs

In Enfield

  • 26/02060/FUL Granted

    292 - 296 Firs Lane London N13 5QQ

    Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).

    18 May 2026 Full applications
  • 26/03701/FUL Awaiting decision

    30 Gordon Road London N9 0LU

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear infill extension, rear dormer to outrigger dormer, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03688/FUL Awaiting decision

    16 Goldsdown Road Enfield EN3 7QZ

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer and new ground floor flank window, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03683/FUL Awaiting decision

    152 Galliard Road London N9 7LP

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension and rear dormer with front rooflights.

    1 Sep 2026 Full applications
  • 26/03673/FUL Awaiting decision

    80 Stoneleigh Avenue Enfield EN1 4HH

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension with roof extension to side, rear dormer and front roof lights.

    1 Sep 2026 Full applications