Planning application

325 Willow Road Enfield EN1 3BX

Refused Enfield 23/04050/FUL Full

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Single storey rear extension to existing dental surgery, adding one surgery room and enlarging waiting area, with additional window to side elevation.

As published by the council, reference 23/04050/FUL

Application record

Reference
23/04050/FUL
Type
Full
Status
Decided
Decision
Refused
Received
11 Dec 2023
Validated
19 Dec 2023
Decided
12 Feb 2024
Ward
Town
Decision by
Delegated Decision
Postcode
EN1 3BX

Timeline

Dates from the published record

  1. 11 Dec 2023

    Received by Enfield

  2. 19 Dec 2023

    Validated

    Checked as complete and ready for consideration.

  3. 12 Feb 2024

    Decision issued: Refused

  4. 20 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in London

7 applications on PlanIndex · across 5 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 325 Willow Road Enfield EN1 3BX

    23/03303/FUL Submitted 10 Oct 2023 0m away

    Single storey rear extension to existing dental surgery, with additional window at side elevation.

    Refused Full applications Extension Windows or glazing 10 docs
    Small domestic
  • 1-2 Savoy Parade Southbury Road Enfield EN1 1RT

    21/02835/FUL Submitted 20 Jul 2021 62m away

    Amalgamation of ground floor units (Class E)

    Granted Full applications 5 docs
  • 7 - 7A Southbury Road Enfield EN1 1RT

    22/00681/FUL Submitted 24 Feb 2022 72m away

    Single storey rear extension.

    Granted Full applications Extension 7 docs
    Small domestic
  • Powell House 4 Dunstan Mews Enfield EN1 1GF

    22/01513/CEA Submitted 29 Apr 2022 119m away

    Replacement of external wall cladding and external decking materials to match the appearance of the existing.

    Granted Lawful development 20 docs
  • Pinnacle House Colman Parade 6A Southbury Road Enfield EN1 1FY

    22/01512/CEA Submitted 29 Apr 2022 123m away

    Replacement of external wall cladding and external decking materials to match the appearance of the existing.

    Granted Lawful development 16 docs
  • 29 Fyfield Road Enfield EN1 3TT

    26/01119/CEA Submitted 19 Mar 2026 130m away

    85% historically approved · decision due ~22 May

    Use of the ground floor unit as a childrens day nursery within Class E(f), accommodating up to 20 children with a maximum of 6 staff members on site.

    Awaiting decision Lawful development 18 docs

In Enfield

  • 26/02060/FUL Granted

    292 - 296 Firs Lane London N13 5QQ

    Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).

    18 May 2026 Full applications
  • 26/03701/FUL Awaiting decision

    30 Gordon Road London N9 0LU

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear infill extension, rear dormer to outrigger dormer, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03688/FUL Awaiting decision

    16 Goldsdown Road Enfield EN3 7QZ

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer and new ground floor flank window, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03683/FUL Awaiting decision

    152 Galliard Road London N9 7LP

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension and rear dormer with front rooflights.

    1 Sep 2026 Full applications
  • 26/03673/FUL Awaiting decision

    80 Stoneleigh Avenue Enfield EN1 4HH

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension with roof extension to side, rear dormer and front roof lights.

    1 Sep 2026 Full applications