Proposal
Alterations to shop front, involving reduction of single storey rear extension with rooflights.
As published by the council, reference 23/03670/FUL
Timeline
Dates from the published record
-
10 Nov 2023
Received by Enfield
-
28 Nov 2023
Validated
Checked as complete and ready for consideration.
-
23 Jan 2024
Decision issued: Granted With Conditions
-
3 Aug 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
23/03666/PMA Withdrawn
82 London Road Enfield EN2 6HU
Prior approval for change of use of office building at ground floor (Class E) to 1 x self contained flat at front and 1 x self contained flat at rear (Class C3), involving reduction of single storey rear extension.
-
23/03984/NMA Granted
25 Tiptree Drive Enfield EN2 6TY
Non material amendment to Ref: 23/02137/HOU to allow repositioning of front rooflights.
-
23/03942/HOU Granted
25 Chalkwell Park Avenue Enfield EN1 2AL
Single storey side to rear extension.
-
23/03943/CEA Granted
25 Chalkwell Park Avenue Enfield EN1 2AL
Single storey side extension.
-
26/01474/FUL Awaiting decision
Convent 52 London Road Enfield EN2 6EN
Change of use of part ground floor from community use (Sui Generis) to 3 x self-contained residential units ( Class C3), including internal reconfiguration and minor non-structural alterations.
-
26/02529/FUL Awaiting decision
Tower Point 52 Sydney Road Enfield EN2 6SZ
Replacement of spandrel panels and steel composite cladding with non-combustible materials, together with replacement of timber decking to balconies.
Other full applications applications
In Enfield
-
26/02374/FUL Granted
Unit 1- 3 And 44- 46 Redburn Industrial Estate Woodall Road Enfield EN3 4LE
Conversion of existing light industrial (E(g)(iii)) and storage/distribution (B8) units into 3 x units, involving rear extension.
-
26/03072/FUL Withdrawn
40 Woodstock Crescent London N9 7LY
Change of use from Use Class C3 (dwelling house) to Use Class C4 (house in multiple occupation - HMO) with single-storey rear extension involving demolition of existing extension, rear dormer with front roof lights and associated amenity refuse and cycle storage.
-
26/02191/FUL Granted
67 Mapleton Crescent Enfield EN3 5RB
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey side/rear extension, rear dormer, hip to gable roof conversion and front rooflights, with associated amenity, cycle and refuse storage.
-
26/01823/FUL Granted
48 Burford Gardens London N13 4LP
Single storey rear extension involving changes to rear fenestration.
-
26/02031/FUL Refused
46 Elmhurst Road Enfield EN3 5TB
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear wraparound extension, rear dormer, rear outrigger dormer with front rooflights, associated amenity, cycle and refuse storage.