Planning application
Eagle House 291 High Street Enfield EN3 4DN
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of shopfront with shutter and auto sliding door together with, replacement of existing illuminated signs.
As published by the council, reference 23/03537/FUL
Application record
- Reference
- 23/03537/FUL
- Type
- Full
- Status
- Decided
- Decision
- Granted With Conditions
- Received
- 30 Oct 2023
- Validated
- 29 Nov 2023
- Decided
- 18 Jan 2024
- Ward
- Ponders End
- Decision by
- Delegated Decision
- Postcode
- EN3 4DN
Timeline
Dates from the published record
-
30 Oct 2023
Received by Enfield
-
29 Nov 2023
Validated
Checked as complete and ready for consideration.
-
18 Jan 2024
Decision issued: Granted With Conditions
-
3 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
2 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Eagle House 291 High Street Enfield EN3 4DN
Installation of 3x internally illuminated fascia sign.
Granted Advertising 12 docs -
Advertisement Hoarding Adjacent To 286 High Street Enfield EN3 4HF
Installation of double-sided internally illuminated digital free standing advertising display.
Granted Advertising 12 docs -
2A Nags Head Road Enfield EN3 7AJ
68% historically approved · decision due ~30 Jul
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) (PART-RETROSPECTIVE).
Awaiting decision Full applications 12 docsDomestic -
259 High Street Enfield EN3 4DS
Prior approval for the construction of an additional 3rd and 4th floors levels above existing commercial building (former bank premises) to provide 5 new self-contained flats (3x 2-bedroom units and 2 x 1-bedroom units) total height of building 16.8m , together with installation of cycle storage units, planters & refuse storage in rear yard.
Granted New dwelling 17 docs -
12 Nags Head Road Enfield EN3 7AJ
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, cycle and refuse storage.
Refused Full applications 12 docsDomestic -
7 Garfield Road Enfield EN3 4RP
68% historically approved · decision due ~13 Aug
Change of use from Use Class C3 (dwelling house) to Use Class Sui-Generis (HMO-house in multiple occupation) including single storey rear/side extension, rear dormer with outrigger dormer and front rooflights, acoustic entrance canopy and acoustic fence with associated amenity, cycle and refuse storage.
Awaiting decision Full applications Extension Loft or dormerSmall domestic
Other full applications applications
In Enfield
-
26/02060/FUL Granted
292 - 296 Firs Lane London N13 5QQ
Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).
-
26/03701/FUL Awaiting decision
30 Gordon Road London N9 0LU
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear infill extension, rear dormer to outrigger dormer, with associated amenity, cycle and refuse storage.
-
26/03688/FUL Awaiting decision
16 Goldsdown Road Enfield EN3 7QZ
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer and new ground floor flank window, with associated amenity, cycle and refuse storage.
-
26/03683/FUL Awaiting decision
152 Galliard Road London N9 7LP
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension and rear dormer with front rooflights.
-
26/03673/FUL Awaiting decision
80 Stoneleigh Avenue Enfield EN1 4HH
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension with roof extension to side, rear dormer and front roof lights.