Planning application
25 Marrilyne Avenue Enfield EN3 6EQ
Works: Extension Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Sub-division of site and conversion of single family dwelling house into 2 dwelling houses, involving part single, part 2 storey rear extension with associated refuse, car and cycle parking.
As published by the council, reference 23/03499/FUL
Application record
- Reference
- 23/03499/FUL
- Type
- Full
- Status
- Decided
- Decision
- Granted With Conditions
- Received
- 25 Oct 2023
- Validated
- 18 Dec 2023
- Decided
- 9 Feb 2024
- Ward
- Enfield Lock
- Decision by
- Delegated Decision
- Postcode
- EN3 6EQ
Timeline
Dates from the published record
-
25 Oct 2023
Received by Enfield
-
18 Dec 2023
Validated
Checked as complete and ready for consideration.
-
9 Feb 2024
Decision issued: Granted With Conditions
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
14 applications on PlanIndex · across 5 councils · 83% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
20 Bideford Road Enfield EN3 6EH
75% historically approved · decision due ~5 Aug
First floor rear extension.
Awaiting decision Householder ExtensionDomestic -
33 Marrilyne Avenue Enfield EN3 6EQ
Sub-division of site and conversion of single family dwelling house into 2x dwelling houses involving first floor side extension and conversion of garage into habitable room.
Granted Full applications Extension 23 docsDomestic -
1 Bilton Way Enfield EN3 6EW
78% historically approved · decision due ~29 Sep
Details submitted pursuant to reference 25/00638/FUL: landscaping (5) and construction management plan (7) in respect of sub-division of site and erection of an end-of-terraced 2-storey dwelling house.
Awaiting decisionDomestic -
Land Adjacent To 2 Bilton Way Enfield EN3 6EW
Erection of two-storey detached two bedroom dwelling house, installation of vehicular access, creation of off-street parking, provision for cycle and refuse storage, associated landscaping and boundary fencing.
Refused Full applications 21 docsDomestic -
1 Bilton Way Enfield EN3 6EW
Sub-division of site and erection of an end-of-terraced 2-storey dwelling house.
Refused Full applications 13 docsDomestic -
11 Bilton Way Enfield EN3 6EW
68% historically approved · decision due ~8 Jul
Sub-division of site and erection of two storey semi-detached dwellinghouse including photovoltaic (PV) panels, an air source heat pump, vehicular access associated landscaping, cycle and refuse storage.
Awaiting decision Full applications 14 docsDomestic
Other full applications applications
In Enfield
-
26/02060/FUL Granted
292 - 296 Firs Lane London N13 5QQ
Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).
-
26/03642/FUL Awaiting decision
20 Brettenham Road London N18 2ET
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, cycle and refuse storage (PART RETROSPECTIVE).
-
26/01944/FUL Granted
428 Church Street London N9 9HT
Change of use from Use Class C3 (dwelling house) to Use Class Sui-Generis (HMO-house in multiple occupation) for up to seven persons, including part single storey, part two storey rear and side extension with associated amenity, cycle and refuse storage.
-
26/03619/FUL Awaiting decision
Commercial Premises 654 - 658 Hertford Road Enfield EN3 6LZ
Installation of 1 x EV Charger upstand and associated feeder pillar cabinet and car parking layout amendments.
-
26/03609/FUL Awaiting decision
36 Lytton Avenue Enfield EN3 6EN
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) for up to 6 persons, including rear dormer and front roof lights with associated amenity, refuse and cycle storage.