Skip to content
PlanIndex Get alerts
Menu

Planning application

83 Sussex Way Barnet EN4 0BH

Granted Enfield 22/01732/FUL Full

Works: New dwelling Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of single family dwelling house into 2 self-contained flats, involving first floor rear extension, associated parking and amenity space.

As published by the council, reference 22/01732/FUL

Application record

Reference
22/01732/FUL
Type
Full
Status
Decided
Decision
Granted With Conditions
Received
17 May 2022
Validated
23 May 2022
Decided
15 Jul 2022
Ward
Cockfosters
Decision by
Delegated Decision
Postcode
EN4 0BH

Timeline

Dates from the published record

  1. 17 May 2022

    Received by Enfield

  2. 23 May 2022

    Validated

    Checked as complete and ready for consideration.

  3. 15 Jul 2022

    Decision issued: Granted With Conditions

  4. 25 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

2 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 60 Bramley Road London N14 4HS

    26/03593/CEA Submitted 25 Aug 2026 42m away

    78% historically approved · decision due ~20 Oct

    Single storey side extension following demolition of existing garage.

    Awaiting decision Extension Demolition
    Small domestic
  • 97 Sussex Way Barnet EN4 0BH

    23/03966/HOU Submitted 4 Dec 2023 55m away

    Single storey rear extension with raised patio, together with demolition of existing outbuilding and construction of replacement outbuilding and covered BBQ area at rear.

    Refused Householder Extension Demolition 8 docs
    Small domestic
  • 62 Bramley Road London N14 4HS

    23/03932/HOU Submitted 1 Dec 2023 61m away

    Single storey side to rear extension

    Granted Householder Extension 8 docs
    Small domestic
  • 92 Bramley Road London N14 4HS

    20/02172/PRH Submitted 13 Jul 2020 76m away

    Single storey rear extension 4.50m deep x 4.00m high (2.40m high to eaves).

    Granted Prior approval Extension 3 docs
    Small domestic
  • 105 Sussex Way Barnet EN4 0BH

    22/01329/HOU Submitted 19 Apr 2022 86m away

    Connection of existing single storey rear extension wall to the outdoor building including a new flat roof.

    Granted Householder Extension 17 docs
    Small domestic
  • 52 Bramley Road London N14 4HS

    24/00549/CEA Submitted 21 Feb 2024 106m away

    Rear dormer with side rooflights.

    Granted Lawful development Loft or dormer 11 docs

In Enfield

  • 26/02060/FUL Granted

    292 - 296 Firs Lane London N13 5QQ

    Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).

    18 May 2026 Full applications
  • 26/03701/FUL Awaiting decision

    30 Gordon Road London N9 0LU

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear infill extension, rear dormer to outrigger dormer, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03688/FUL Awaiting decision

    16 Goldsdown Road Enfield EN3 7QZ

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer and new ground floor flank window, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03683/FUL Awaiting decision

    152 Galliard Road London N9 7LP

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension and rear dormer with front rooflights.

    1 Sep 2026 Full applications
  • 26/03673/FUL Awaiting decision

    80 Stoneleigh Avenue Enfield EN1 4HH

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension with roof extension to side, rear dormer and front roof lights.

    1 Sep 2026 Full applications