Proposal
Construction of hard standing in connection with vehicular access.
As published by the council, reference 22/01076/FUL
Timeline
Dates from the published record
-
28 Mar 2022
Received by Enfield
-
6 Apr 2022
Validated
Checked as complete and ready for consideration.
-
1 Jun 2022
Decision issued: Granted With Conditions
-
3 Aug 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22/01489/PRH Withdrawn
145 Gordon Road Enfield EN2 0QA
Single storey rear extension 3.50m deep x 3.09m high (3.00m high to eaves).
-
22/01548/PRH Withdrawn
145 Gordon Road Enfield EN2 0QA
Single storey rear extension 4m deep x 3.50m high (2.70m high to eaves).
-
26/02971/HOU Awaiting decision
105 Manor Road Enfield EN2 0AW
Conversion of garage into a habitable room including changes to front fenestration and new side window.
-
22/00700/CEA Granted
85 Halifax Road Enfield EN2 0PS
Ground floor infill extension, rear dormer with front rooflights and outbuilding to rear.
-
20/02474/PRH Granted
10 Heene Road Enfield EN2 0QG
Single storey rear extension 4.00m deep x 3.90m high (2.90m high to eaves).
-
22/00661/VAR Granted
274 Baker Street Enfield EN1 3LD
Variation of Conditions 1 and 3 of 19/04294/FUL (subsequently amended by 20/02582/VAR) to allow permission for an unlimited period and to change operating hours of hand car wash to 08:30 to 18:30 on Mondays to Fridays, 09:00 to 18:00 on Saturdays and 10:00 to 16:00 on Sundays and Public Holidays.
Other full applications applications
In Enfield
-
26/02374/FUL Granted
Unit 1- 3 And 44- 46 Redburn Industrial Estate Woodall Road Enfield EN3 4LE
Conversion of existing light industrial (E(g)(iii)) and storage/distribution (B8) units into 3 x units, involving rear extension.
-
26/03072/FUL Withdrawn
40 Woodstock Crescent London N9 7LY
Change of use from Use Class C3 (dwelling house) to Use Class C4 (house in multiple occupation - HMO) with single-storey rear extension involving demolition of existing extension, rear dormer with front roof lights and associated amenity refuse and cycle storage.
-
26/02191/FUL Granted
67 Mapleton Crescent Enfield EN3 5RB
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey side/rear extension, rear dormer, hip to gable roof conversion and front rooflights, with associated amenity, cycle and refuse storage.
-
26/01823/FUL Granted
48 Burford Gardens London N13 4LP
Single storey rear extension involving changes to rear fenestration.
-
26/02031/FUL Refused
46 Elmhurst Road Enfield EN3 5TB
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear wraparound extension, rear dormer, rear outrigger dormer with front rooflights, associated amenity, cycle and refuse storage.