Skip to content
PlanIndex Get alerts
Menu

Planning application

22 Swansea Road Enfield EN3 4JG

Granted Enfield 22/00529/FUL Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Sub-division of site and erection of a 2-storey, attached dwelling house, involving a single storey rear extension to existing house, with associated parking (revised plans)

As published by the council, reference 22/00529/FUL

Application record

Reference
22/00529/FUL
Type
Full
Status
Decided
Decision
Granted With Conditions
Received
15 Feb 2022
Validated
28 Feb 2022
Decided
8 Jun 2022
Ward
Ponders End
Decision by
Delegated Decision
Postcode
EN3 4JG

Timeline

Dates from the published record

  1. 15 Feb 2022

    Received by Enfield

  2. 28 Feb 2022

    Validated

    Checked as complete and ready for consideration.

  3. 8 Jun 2022

    Decision issued: Granted With Conditions

  4. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21 Brecon Road Enfield EN3 4JD

    22/01827/CEU Submitted 24 May 2022 47m away

    All elevations of the property are to be overclad with insulation and finished with a 'dashed' proprietary rendered finish to match the existing pebble-dash rendered finish, including handmade red brick slips to replicate the existing brick quoin details

    Granted Lawful development 13 docs
  • 19 Brecon Road Enfield EN3 4JD

    22/01825/CEU Submitted 24 May 2022 50m away

    All elevations of the property are to be overclad with insulation and finished with a 'dashed' proprietary rendered finish to match the existing pebble-dash rendered finish, including handmade red brick slips to replicate the existing brick quoin details

    Granted Lawful development 16 docs
  • 12 Swansea Road Enfield EN3 4JG

    26/03177/FUL Submitted 27 Jul 2026 55m away

    68% historically approved · decision due ~13 Oct

    Conversion of single family dwelling house into 2 self-contained dwelling houses including part single, part 2-storey side/rear extension, single storey front extension involving alterations to existing fenestrations.

    Awaiting decision Full applications Extension
    Small domestic
  • 13 Brecon Road Enfield EN3 4JF

    22/01824/CEU Submitted 24 May 2022 77m away

    All elevations of the property are to be overclad with insulation and finished with a 'dashed' proprietary rendered finish to match the existing pebble-dash rendered finish, including handmade red brick slips to replicate the existing brick quoin details

    Granted Lawful development 15 docs
  • 9 Tenby Road Enfield EN3 4JE

    26/03274/FUL Submitted 31 Jul 2026 86m away

    68% historically approved · decision due ~25 Sep

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with part single, part 2-storey rear extension, gable end roof extension, rear dormer, associated amenity, cycle and refuse storage.

    Awaiting decision Full applications Extension Loft or dormer
    Domestic
  • 9 Tenby Road Enfield EN3 4JE

    26/03145/PRH Submitted 23 Jul 2026 86m away

    78% historically approved · decision due ~17 Sep

    Single storey rear extension 6m deep x 3m high (3m high to eaves).

    Awaiting decision Extension
    Small domestic

In Enfield

  • 26/02060/FUL Granted

    292 - 296 Firs Lane London N13 5QQ

    Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).

    18 May 2026 Full applications
  • 26/03701/FUL Awaiting decision

    30 Gordon Road London N9 0LU

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear infill extension, rear dormer to outrigger dormer, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03688/FUL Awaiting decision

    16 Goldsdown Road Enfield EN3 7QZ

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer and new ground floor flank window, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03683/FUL Awaiting decision

    152 Galliard Road London N9 7LP

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension and rear dormer with front rooflights.

    1 Sep 2026 Full applications
  • 26/03673/FUL Awaiting decision

    80 Stoneleigh Avenue Enfield EN1 4HH

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension with roof extension to side, rear dormer and front roof lights.

    1 Sep 2026 Full applications