Skip to content
PlanIndex Get alerts
Menu

Planning application

38A Bury Street London N9 7JY

Granted Enfield 22/00258/FUL Full

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing garages and redevelopment of the site to provide 9 single family dwellings together with associated landscaping.

As published by the council, reference 22/00258/FUL

Application record

Reference
22/00258/FUL
Type
Full
Status
Decided
Decision
Granted With Conditions
Received
25 Jan 2022
Validated
14 Feb 2022
Decided
27 May 2022
Ward
Lower Edmonton
Decision by
Delegated Decision
Postcode
N9 7JY

Timeline

Dates from the published record

  1. 25 Jan 2022

    Received by Enfield

  2. 14 Feb 2022

    Validated

    Checked as complete and ready for consideration.

  3. 27 May 2022

    Decision issued: Granted With Conditions

  4. 5 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

2,025 applications on PlanIndex · across 33 councils · 98% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

38 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 38A Bury Street London N9 7JY

    23/04100/CND Submitted 15 Dec 2023 0m away

    Details submitted pursuant to reference 22/00258/FUL: energy report (11) in respect of demolition of existing garages and redevelopment of the site to provide 9 single family dwellings together with associated landscaping.

    Granted Conditions Demolition 3 docs
  • 55 Millbrook Road London N9 7HY

    23/03290/CEU Submitted 9 Oct 2023 54m away

    Use of a single family dwellinghouse as a house in multiple occupation (HMO).

    Refused Lawful development 7 docs
    Domestic
  • 31 Beamish Road London N9 7JA

    26/02454/FUL Submitted 10 Jun 2026 61m away

    68% historically approved · decision due ~5 Aug

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear and infill extension, rear dormer, rear outrigger dormer, front roof lights, with associated amenity, cycle and refuse storage.

    Decided Full applications Extension Loft or dormer
    Small domestic
  • 16 Beamish Road London N9 7JA

    20/02534/PRH Submitted 10 Aug 2020 63m away

    Single storey rear extension 6.00m deep x 3.80m high (3.00m high to eaves).

    Granted Prior approval Extension 7 docs
    Small domestic
  • 14 Beamish Road London N9 7JA

    22/01737/PRH Submitted 17 May 2022 64m away

    Single storey rear extension 6m deep x 2.92m high (2.92m high to eaves).

    Refused Prior approval Extension 5 docs
    Small domestic
  • 32 Beamish Road London N9 7JA

    26/01335/HOU Submitted 1 Apr 2026 83m away

    Part single, part two-storey side/rear extension.

    Refused Householder Extension 9 docs
    Domestic

In Enfield

  • 26/02060/FUL Granted

    292 - 296 Firs Lane London N13 5QQ

    Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).

    18 May 2026 Full applications
  • 26/03701/FUL Awaiting decision

    30 Gordon Road London N9 0LU

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear infill extension, rear dormer to outrigger dormer, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03688/FUL Awaiting decision

    16 Goldsdown Road Enfield EN3 7QZ

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer and new ground floor flank window, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03683/FUL Awaiting decision

    152 Galliard Road London N9 7LP

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension and rear dormer with front rooflights.

    1 Sep 2026 Full applications
  • 26/03673/FUL Awaiting decision

    80 Stoneleigh Avenue Enfield EN1 4HH

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension with roof extension to side, rear dormer and front roof lights.

    1 Sep 2026 Full applications