Planning application

34 Conway Road London N14 7BA

Granted Enfield 21/00380/FUL Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Sub-division of site and conversion of outbuilding into a self-contained dwelling involving creation of first floor level over existing ground floor together with associated parking.

As published by the council, reference 21/00380/FUL

Application record

Reference
21/00380/FUL
Type
Full
Status
Decided
Decision
Granted With Conditions
Received
3 Feb 2021
Validated
26 Apr 2021
Decided
31 May 2022
Ward
Southgate Green
Decision by
Delegated Decision
Postcode
N14 7BA

Timeline

Dates from the published record

  1. 3 Feb 2021

    Received by Enfield

  2. 26 Apr 2021

    Validated

    Checked as complete and ready for consideration.

  3. 31 May 2022

    Decision issued: Granted With Conditions

  4. 5 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

6 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 30 Conway Road London N14 7BA

    23/03979/CND Submitted 4 Dec 2023 16m away

    Details submitted pursuant to reference 22/03658/HOU: materials (3) in respect of rebuild of front bay window and front boundary wall and replacement footpath.

    Granted Conditions Windows or glazing 16 docs
    Small domestic
  • 55 Conway Road London N14 7BD

    20/02435/HOU Submitted 3 Aug 2020 34m away

    Replacement windows and doors to side and rear elevation (PART RETROSPECTIVE).

    Granted Householder Windows or glazing 16 docs
    Domestic
  • 55 Conway Road London N14 7BD

    20/02453/CND Submitted 4 Aug 2020 34m away

    Details submitted pursuant to reference 14/02562/HOU: front and rear replacement doors (3) in respect of replacement windows and entrance door to front elevation and rear back door.

    Withdrawn Conditions Windows or glazing 6 docs
  • 63 Conway Road London N14 7BD

    26/03178/HOU Submitted 27 Jul 2026 61m away

    75% historically approved · decision due ~6 Oct

    Replacement of timber sashes with new double glazed sashes to front elevation, involving refurbishment of existing sash box frames.

    Awaiting decision Householder Windows or glazing
    Domestic
  • 73 Conway Road London N14 7BD

    22/01517/HOU Submitted 3 May 2022 67m away

    Erection of front boundary wall with gate and side boundary wall with railings to a maximum height of 1.15m, together with reduction of parking area with paving and path leading to steps.

    Granted Householder 17 docs
    Small domestic
  • 12 Harlech Road London N14 7BX

    21/03805/HOU Submitted 7 Oct 2021 97m away

    Single storey rear extension and rear dormer.

    Granted Householder Extension Loft or dormer 11 docs
    Small domestic

In Enfield

  • 26/02060/FUL Granted

    292 - 296 Firs Lane London N13 5QQ

    Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).

    18 May 2026 Full applications
  • 26/03642/FUL Awaiting decision

    20 Brettenham Road London N18 2ET

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, cycle and refuse storage (PART RETROSPECTIVE).

    28 Aug 2026 Full applications
  • 26/01944/FUL Granted

    428 Church Street London N9 9HT

    Change of use from Use Class C3 (dwelling house) to Use Class Sui-Generis (HMO-house in multiple occupation) for up to seven persons, including part single storey, part two storey rear and side extension with associated amenity, cycle and refuse storage.

    11 May 2026 Full applications
  • 26/03619/FUL Awaiting decision

    Commercial Premises 654 - 658 Hertford Road Enfield EN3 6LZ

    Installation of 1 x EV Charger upstand and associated feeder pillar cabinet and car parking layout amendments.

    26 Aug 2026 Full applications
  • 26/03609/FUL Awaiting decision

    36 Lytton Avenue Enfield EN3 6EN

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) for up to 6 persons, including rear dormer and front roof lights with associated amenity, refuse and cycle storage.

    26 Aug 2026 Full applications