Skip to content
PlanIndex Get alerts
Menu

Planning application

59-69 Church Lane London N9 9PZ

Awaiting decision Enfield 20/03969/FUL Full

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Glass shelter for the foot path around the main Temple block.

As published by the council, reference 20/03969/FUL

Application record

Reference
20/03969/FUL
Type
Full
Status
Application in Progress
Received
8 Dec 2020
Validated
16 Dec 2020
Ward
Haselbury
Decision by
Delegated Decision
Postcode
N9 9PZ

Timeline

Dates from the published record

  1. 8 Dec 2020

    Received by Enfield

  2. 16 Dec 2020

    Validated

    Checked as complete and ready for consideration.

  3. 25 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 10 February 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Enfield took a median of 63 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Enfield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 71 Church Lane London N9 9PZ

    20/02522/CEA Submitted 7 Aug 2020 20m away

    Alterations to roof to form gable end, rear dormer with 2 x front rooflights together with detached outbuilding at rear.

    Granted Lawful development Loft or dormer 6 docs
  • 71 Church Lane London N9 9PZ

    20/02300/PRH Submitted 22 Jul 2020 20m away

    Single storey 3.68m rear extension to existing 2.32m extension totalling 6m deep x 3m high (2.50m high to eaves).

    Withdrawn Prior approval Extension 5 docs
    Small domestic
  • 34 Church Lane London N9 9QB

    20/02216/CEA Submitted 16 Jul 2020 62m away

    Outbuilding at rear.

    Refused Lawful development 4 docs
  • 37 Latymer Road London N9 9PF

    21/04690/CEA Submitted 16 Dec 2021 95m away

    Single storey rear extension pursuant to: 22/01082/PRH

    Granted Lawful development Extension 23 docs
    Small domestic
  • 37 Latymer Road London N9 9PF

    22/01082/PRH Submitted 28 Mar 2022 95m away

    Single storey rear extension 6m deep x 3.00m high (3.00m high to eaves).

    Granted Prior approval Extension 3 docs
    Small domestic
  • 27 Winchester Road London N9 9HA

    26/02933/CEA Submitted 10 Jul 2026 120m away

    78% historically approved · decision due ~14 Sep

    Single storey rear extension with rear dormer, rear outrigger dormer and front rooflights.

    Awaiting decision Extension Loft or dormer
    Small domestic

In Enfield

  • 26/02060/FUL Granted

    292 - 296 Firs Lane London N13 5QQ

    Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).

    18 May 2026 Full applications
  • 26/03701/FUL Awaiting decision

    30 Gordon Road London N9 0LU

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear infill extension, rear dormer to outrigger dormer, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03688/FUL Awaiting decision

    16 Goldsdown Road Enfield EN3 7QZ

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer and new ground floor flank window, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03683/FUL Awaiting decision

    152 Galliard Road London N9 7LP

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension and rear dormer with front rooflights.

    1 Sep 2026 Full applications
  • 26/03673/FUL Awaiting decision

    80 Stoneleigh Avenue Enfield EN1 4HH

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension with roof extension to side, rear dormer and front roof lights.

    1 Sep 2026 Full applications