Skip to content
PlanIndex Get alerts
Menu

Planning application

143B And 143D Church Street London N9 9RN

Granted Enfield 20/02966/FUL Full

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension and single storey side / rear extension to ground floor flat, involving installation of new window to side elevation at ground floor level and second floor rear extension to upper floor flat.

As published by the council, reference 20/02966/FUL

Application record

Reference
20/02966/FUL
Type
Full
Status
Decided
Decision
Granted With Conditions
Received
15 Sep 2020
Validated
15 Sep 2020
Decided
10 Nov 2020
Ward
Haselbury
Decision by
Delegated Decision
Postcode
N9 9RN

Timeline

Dates from the published record

  1. 15 Sep 2020

    Received by Enfield

  2. 10 Nov 2020

    Decision issued: Granted With Conditions

  3. 4 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

2 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 11 Arthur Road London N9 9AF

    26/02784/FUL Submitted 1 Jul 2026 94m away

    68% historically approved · decision due ~22 Oct

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, cycle and refuse storage.

    Awaiting decision Full applications
    Domestic
  • Ground Floor Flat 28 Tillotson Road London N9 9AH

    24/00100/FUL Submitted 15 Jan 2024 97m away

    Detached outbuilding to rear.

    Granted Full applications 14 docs
  • 40B Tillotson Road London N9 9AH

    23/03405/FUL Submitted 17 Oct 2023 126m away

    Rear dormer, outrigger dormer with front rooflights.

    Refused Full applications Extension Loft or dormer 11 docs
  • 134 Church Street London N9 9AS

    20/01560/HOU Submitted 22 May 2020 148m away

    Two storey side extension.

    Refused Householder Extension 6 docs
    Domestic
  • 47 Tillotson Road London N9 9AQ

    26/03449/PRH Submitted 14 Aug 2026 156m away

    78% historically approved · decision due ~9 Oct

    Single storey rear extension 5m deep x 3m high (3m high to eaves).

    Awaiting decision Extension
    Small domestic
  • 39 Tillotson Road London N9 9AQ

    26/02293/FUL Submitted 2 Jun 2026 156m away

    68% historically approved · decision due ~6 Aug

    Single storey rear extension and single storey side extension.

    Decided Full applications Extension
    Small domestic

In Enfield

  • 26/02060/FUL Granted

    292 - 296 Firs Lane London N13 5QQ

    Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).

    18 May 2026 Full applications
  • 26/03701/FUL Awaiting decision

    30 Gordon Road London N9 0LU

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear infill extension, rear dormer to outrigger dormer, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03688/FUL Awaiting decision

    16 Goldsdown Road Enfield EN3 7QZ

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer and new ground floor flank window, with associated amenity, cycle and refuse storage.

    1 Sep 2026 Full applications
  • 26/03683/FUL Awaiting decision

    152 Galliard Road London N9 7LP

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension and rear dormer with front rooflights.

    1 Sep 2026 Full applications
  • 26/03673/FUL Awaiting decision

    80 Stoneleigh Avenue Enfield EN1 4HH

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension with roof extension to side, rear dormer and front roof lights.

    1 Sep 2026 Full applications