Planning application
Meridian Water Willoughby Lane And Meridian Way London N18
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non-material amendment to Phase 1 under ref: 16/01197/RE3 to amend the wording of condition numbers 14 (Public Realm Strategy), 23 (Materials), 27 (Telecommunications infrastructure), 52 (Details of Open Space), 53 (Playspace Strategy), 57 (Meanwhile use strategy) and 74 (Arrangements of paths and roads).
As published by the council, reference 20/02944/NMA
Application record
- Reference
- 20/02944/NMA
- Type
- App for Non-Material Amendments
- Status
- Decided
- Decision
- Granted
- Received
- 14 Sep 2020
- Validated
- 14 Sep 2020
- Decided
- 26 Oct 2020
- Ward
- Upper Edmonton
- Decision by
- Delegated Decision
Site history
Applications at this address on the Enfield register
This site has had 12 applications since 2020: 8 approved, 0 refused.
-
26/02818/CND Decided
Meridian Water Willoughby Lane And Meridian Way London N18
Partial Discharge: Details submitted pursuant to 21/04742/FUL Phase 0 only for Circular Economy Technical Statement (38) in respect of the Full planning application for development of Phase 1b of Meridian Water to provide new residential accommodation (Use Class C3), ground floor commercial floorspace (Use Class E(a, b, c, g)), leisure floorspace (Use Class E(d)) and medical centre (Use Class E(e)) across three buildings including ancillary areas to these uses, roads and footpaths, car and cycle parking provision, public open space including areas for play, landscaping and drainage; and areas of landscaping and open space for temporary and meanwhile uses; Submission of an Environmental Statement.
-
26/02494/CND Decided
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 21/04742/FUL Plot D only: telecommunications/satellite strategy (9) in respect of full planning application for development of Phase 1b of Meridian Water to provide new residential accommodation (Use Class C3), ground floor commercial floorspace (Use Class E(a, b, c, g)), leisure floorspace (Use Class E(d)) and medical centre (Use Class E(e)) across three buildings including ancillary areas to these uses, roads and footpaths, car and cycle parking provision, public open space including areas for play, landscaping and drainage; and areas of landscaping and open space for temporary and meanwhile uses; Submission of an Environmental Statement.
-
26/02495/CND Decided
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 21/04742/FUL: meanwhile use strategy (49) in respect of full planning application for development of Phase 1b of Meridian Water to provide new residential accommodation (Use Class C3), ground floor commercial floorspace (Use Class E(a, b, c, g)), leisure floorspace (Use Class E(d)) and medical centre (Use Class E(e)) across three buildings including ancillary areas to these uses, roads and footpaths, car and cycle parking provision, public open space including areas for play, landscaping and drainage; and areas of landscaping and open space for temporary and meanwhile uses; Submission of an Environmental Statement.
-
26/02355/NMA Granted
Meridian Water Willoughby Lane And Meridian Way London N18
Non material amendment to Ref: 21/04742/FUL to allow amendments to the wording of conditions, 15, 16, 38, 41, 49, 60, 62, 65, to change the triggers for submission.
-
26/01787/CND Granted
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 21/04742/FUL: Construction Environmental Management Plan (44),Construction Logistics Plan (45) and Construction Waste Management Plan (46) in respect of full planning application for development of Phase 1b of Meridian Water to provide new residential accommodation (Use Class C3), ground floor commercial floorspace (Use Class E(a, b, c, g)), leisure floorspace (Use Class E(d)) and medical centre (Use Class E(e)) across three buildings including ancillary areas to these uses, roads and footpaths, car and cycle parking provision, public open space including areas for play, landscaping and drainage; and areas of landscaping and open space for temporary and meanwhile uses; Submission of an Environmental Statement.
-
26/01789/CND Awaiting decision
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 21/04742/FUL:Piling (58) in respect of full planning application for development of Phase 1b of Meridian Water to provide new residential accommodation (Use Class C3), ground floor commercial floorspace (Use Class E(a, b, c, g)), leisure floorspace (Use Class E(d)) and medical centre (Use Class E(e)) across three buildings including ancillary areas to these uses, roads and footpaths, car and cycle parking provision, public open space including areas for play, landscaping and drainage; and areas of landscaping and open space for temporary and meanwhile uses; Submission of an Environmental Statement.
-
26/01363/CND Granted
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 21/04742/FUL: Invasive species (42) in respect of full planning application for development of Phase 1b of Meridian Water to provide new residential accommodation (Use Class C3), ground floor commercial floorspace (Use Class E(a, b, c, g)), leisure floorspace (Use Class E(d)) and medical centre (Use Class E(e)) across three buildings including ancillary areas to these uses, roads and footpaths, car and cycle parking provision, public open space including areas for play, landscaping and drainage; and areas of landscaping and open space for temporary and meanwhile uses; Submission of an Environmental Statement.
-
23/02094/CND Granted
Meridian Water Willoughby Lane And Meridian Way London N18
PARTIAL DISCHARGE PLOT E1.1: Details pursuant to Ref: 16/01197/RE3 for verification report (11) verification report underlaps areas (40) drainage and suds implementation (44) in respect of the development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
-
22/03433/CND Granted
Meridian Water Willoughby Lane And Meridian Way London N18
PARTIAL DISCHARGE PLOTS E2: Details pursuant to ref: 16/01197/RE3 material samples and panels - main site (23), for the development of Phase 1 of Meridian Water.
-
21/02702/CND Granted
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 16/01197/RE3: Leeside Road junction design (75), Albany Road access design (76), Kimberley Road (North) access detailed design (77) and Kimberley Road (pedestrian access) detailed design (79) in respect of development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Timeline
Dates from the published record
-
14 Sep 2020
Received by Enfield
-
26 Oct 2020
Decision issued: Granted
-
4 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Enfield granted permission on 26 October 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Meridian Water Willoughby Lane And Meridian Way London N18
PARTIAL DISCHARGE: Details pursuant to ref: 16/01197/RE3 for Meridian Water Phase 1 Development: - Phasing (4 parts i, ii, iii, v and vi) in respect of the development of Phase 1 of Meridian Water. - Public Realm Strategy (14) in respect of Phase 1A only - Highway and Footway Details (74) in respect of Phase 1A only.
Granted Conditions 47 docs -
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 16/01197/RE3: Leeside Road junction design (75), Albany Road access design (76), Kimberley Road (North) access detailed design (77) and Kimberley Road (pedestrian access) detailed design (79) in respect of development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Granted Conditions 16 docs -
Meridian Water Willoughby Lane And Meridian Way London N18
PARTIAL DISCHARGE PLOT E1.1: Details pursuant to Ref: 16/01197/RE3 for verification report (11) verification report underlaps areas (40) drainage and suds implementation (44) in respect of the development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Granted Conditions 31 docs -
Vacant Land Willoughby Lane London N17 0RY
Details pursuant to ref: 16/01197/RE3: Main Remediation Site (Ground and Gas) (31) for Development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Granted Conditions 5 docs -
Meridian Water Willoughby Lane And Meridian Way London N18
PARTIAL DISCHARGE PLOTS E2: Details pursuant to ref: 16/01197/RE3 material samples and panels - main site (23), for the development of Phase 1 of Meridian Water.
Granted Conditions 14 docs -
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 21/04742/FUL: Invasive species (42) in respect of full planning application for development of Phase 1b of Meridian Water to provide new residential accommodation (Use Class C3), ground floor commercial floorspace (Use Class E(a, b, c, g)), leisure floorspace (Use Class E(d)) and medical centre (Use Class E(e)) across three buildings including ancillary areas to these uses, roads and footpaths, car and cycle parking provision, public open space including areas for play, landscaping and drainage; and areas of landscaping and open space for temporary and meanwhile uses; Submission of an Environmental Statement.
Granted Conditions 7 docs
Other amendment applications
In Enfield
-
25/03547/VAR Granted
Land Adjacent To Cockfosters Underground Station Cockfosters Road Barnet EN4 0DZ
Variation of condition 02, 41 and 42 of Ref: 21/02517/FUL (as amended by 25/03161/NMA) to allow 22 additional residential units, alterations to unit mix, amendments to ground floor landscaping, second stair core to all 4 buildings and increase in height to range between 6 and 15 storeys.
-
26/03598/VAR Awaiting decision
13 Sidney Avenue London N13 4XA
Variation of condition 03 of approval ref: 24/02994/FUL to change wording of condition to "The development hereby permitted shall be occupied by no more than 6no. residents and 4no. members of staff (excluding ad hoc visiting specialists/ therapists) at any one time."
-
26/03597/NMA Awaiting decision
79 Ferndale Road Enfield EN3 6DJ
Non material amendment to reference 26/01837/FUL to allow an overlap of staff not exceeding 30 minutes during shift handovers and to allow existing waste and recycling provision to continue without change.
-
26/03571/NMA Decided
138 Edenbridge Road Enfield EN1 2HU
Non material amendment to 26/02275/HOU to allow retention of greenhouse to rear garden.
-
26/03547/NMA Awaiting decision
Garages Roundhill Drive Enfield EN2 7RW
Non material amendment to Ref: 25/02646/FUL to allow for an increase roof height and increased side of rear dormer.