Skip to content
PlanIndex Get alerts
Menu

Planning application

16 Beamish Road London N9 7JA

Granted Enfield 20/02534/PRH Class A HH - Prior Approval

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension 6.00m deep x 3.80m high (3.00m high to eaves).

As published by the council, reference 20/02534/PRH

Application record

Reference
20/02534/PRH
Type
Class A HH - Prior Approval
Status
Decided
Decision
No Objection PA Not Required
Received
10 Aug 2020
Validated
10 Aug 2020
Decided
21 Sep 2020
Ward
Lower Edmonton
Decision by
Delegated Decision
Postcode
N9 7JA

Timeline

Dates from the published record

  1. 10 Aug 2020

    Received by Enfield

  2. 21 Sep 2020

    Decision issued: No Objection PA Not Required

  3. 5 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • 14 Beamish Road London N9 7JA

    22/01737/PRH Submitted 17 May 2022 4m away

    Single storey rear extension 6m deep x 2.92m high (2.92m high to eaves).

    Refused Prior approval Extension 5 docs
    Small domestic
  • 31 Beamish Road London N9 7JA

    26/02454/FUL Submitted 10 Jun 2026 8m away

    68% historically approved · decision due ~5 Aug

    Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear and infill extension, rear dormer, rear outrigger dormer, front roof lights, with associated amenity, cycle and refuse storage.

    Decided Full applications Extension Loft or dormer
    Small domestic
  • 32 Beamish Road London N9 7JA

    26/01335/HOU Submitted 1 Apr 2026 39m away

    Part single, part two-storey side/rear extension.

    Refused Householder Extension 9 docs
    Domestic
  • 38A Bury Street London N9 7JY

    22/00258/FUL Submitted 25 Jan 2022 63m away

    Demolition of existing garages and redevelopment of the site to provide 9 single family dwellings together with associated landscaping.

    Granted Full applications Demolition 38 docs
  • 38A Bury Street London N9 7JY

    23/04100/CND Submitted 15 Dec 2023 63m away

    Details submitted pursuant to reference 22/00258/FUL: energy report (11) in respect of demolition of existing garages and redevelopment of the site to provide 9 single family dwellings together with associated landscaping.

    Granted Conditions Demolition 3 docs
  • 55 Millbrook Road London N9 7HY

    23/03290/CEU Submitted 9 Oct 2023 88m away

    Use of a single family dwellinghouse as a house in multiple occupation (HMO).

    Refused Lawful development 7 docs
    Domestic

In Enfield

  • 26/01992/PMA Granted

    598 Hertford Road Enfield EN3 5SX

    Prior approval for change of ground floor commercial premises (Class E) to 2 self-contained units (Class C3).

    13 May 2026 Prior approval
  • 26/02125/PMA Granted

    First Floor Michael House 55 - 57 Chase Side London N14 5BU

    Change of use from first floor offices (Use Class E) to 4 x self-contained flats (Use Class C3).

    21 May 2026 Prior approval
  • 26/02337/PRH Granted

    16 Southfield Road Enfield EN3 4BY

    Single-storey rear extension 6m deep x 3m high (3m high to eaves) and single-storey infill extension 4.5m deep x 3m high (3m high to eaves).

    4 Jun 2026 Prior approval
  • 26/02254/PRH Refused

    5 Titchfield Road Enfield EN3 6AZ

    Single-storey rear extension 6m deep x 3m high (3m high to eaves) and single-storey infill extension 3.63m deep x 3m high (3m high to eaves).

    1 Jun 2026 Prior approval
  • 26/02234/PRH Refused

    3 Cross Road Enfield EN1 1PD

    Single-storey rear extension 6m deep x 3m high (3m high to eaves) and single storey infill extension 3.67m deep x 3m high (3m high to eaves).

    29 May 2026 Prior approval