Planning application
St Marys Rc Primary School Durants Road Enfield EN3 7DE
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of canopy to rear of main block.
As published by the council, reference 20/02244/FUL
Application record
- Reference
- 20/02244/FUL
- Type
- Full
- Status
- Decided
- Decision
- Granted With Conditions
- Received
- 17 Jul 2020
- Validated
- 4 Aug 2020
- Decided
- 29 Sep 2020
- Ward
- Ponders End
- Decision by
- Delegated Decision
- Postcode
- EN3 7DE
Timeline
Dates from the published record
-
17 Jul 2020
Received by Enfield
-
4 Aug 2020
Validated
Checked as complete and ready for consideration.
-
29 Sep 2020
Decision issued: Granted With Conditions
-
5 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Saffron Walden
30 applications on PlanIndex · across 14 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
180 Nags Head Road Enfield EN3 7AR
Rear and outrigger dormer with Juliet balcony and front rooflights.
Granted Lawful development Extension Loft or dormer 7 docs -
144 Nags Head Road Enfield EN3 7AR
Single storey rear extension 6m deep x 3m high (2.75m high to eaves).
Granted Prior approval Extension 11 docsSmall domestic -
128 Nags Head Road Enfield EN3 7AP
Conversion of single-family dwelling house into 4 self-contained flats, involving a two storey side extension, single storey wrap-around and first floor side extension to the outrigger, together with rear dormers in the main roof slope and above the outrigger.
Granted Full applications New dwelling Extension +1 8 docsSmall domestic -
133 Nags Head Road Enfield EN3 7AD
68% historically approved · decision due ~16 Sep
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer to outrigger dormer, front roof lights, with associated amenity, cycle and refuse storage.
Awaiting decision Full applications Extension Loft or dormerDomestic -
86 Clydesdale Enfield EN3 4RN
Sub-division of site and erection of an end-of-terraced 2-storey, 2-bed dwelling house with cycle and refuse storage.
Refused Full applications 20 docsDomestic -
86 Clydesdale Enfield EN3 4RN
Variation of condition 02 of Ref: 25/00240/FUL to allow an increased area to the front of the new dwelling at ground floor level and increase area to the front and rear at first floor level.
Refused Amendments New dwelling 15 docsDomestic
Other full applications applications
In Enfield
-
26/02060/FUL Granted
292 - 296 Firs Lane London N13 5QQ
Installation of air conditioning units at ground floor level within protective metal cages and acoustic screening on the external side elevation (RETROSPECTIVE).
-
26/03701/FUL Awaiting decision
30 Gordon Road London N9 0LU
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear infill extension, rear dormer to outrigger dormer, with associated amenity, cycle and refuse storage.
-
26/03688/FUL Awaiting decision
16 Goldsdown Road Enfield EN3 7QZ
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving rear dormer and new ground floor flank window, with associated amenity, cycle and refuse storage.
-
26/03683/FUL Awaiting decision
152 Galliard Road London N9 7LP
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension and rear dormer with front rooflights.
-
26/03673/FUL Awaiting decision
80 Stoneleigh Avenue Enfield EN1 4HH
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, refuse and cycle storage involving single storey rear extension with roof extension to side, rear dormer and front roof lights.