Telecommunications Notification: The removal of 3 x AQU4518R24v06 Antenna at 21m from the existing 25m lattice tower to be replaced by the installation of 3 x 2G2J8XBD-27T antenna at 21m utilising existing steelwork upon the tower. Ancillary works will see the existing 3 x T4S4-90-R2 antenna at 21.25m to remain and Dummy antenna. The removal of 6 x Fibre cables, to be replaced by 3 x Multicore fibre cables. The deployment of 3 x RRU s at 21m on existing support poles, the re use of 6 x existing RRH s at 21m, the reuse of 3 DC BoB s and 6 x DC cables, new diagonal bracing struts under the headframe and refreshment works within the ground based equipment cabin. (Cellnex site ref: 1490247, Project ref: COL.MOD.UK.0006950)
As published by the council, reference 2026/1623
Timeline
Dates from the published record
-
1 Jul 2026
Received by Elmbridge
-
7 Jul 2026
Decision issued: Notification - Assessment Confirmed
-
30 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About telecoms applications
How this application type works
Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.
Nearby applications
Within 500 metres
-
25/02749/OUT Awaiting decision
Land Bounded By Clayton Road, Kingston Bypass (A309), Esher Bypass (A3) And Recreational Facilities To The East (known As Hook Park).
Outline application for a phased development including demolition of existing structures and the provision of new homes (Use Classes C2 and C3), non-residential uses (Use Classes E, F and Sui Generis), open spaces and other ancillary infrastructure. (All Matters reserved except for Access.) Cross boundary application with Elmbridge Borough Council. Application accompanied by an Environmental Statement.
-
2025/2765 Awaiting decision
Land by Clayton Road, Kingston Bypass (A309), Esher Bypass (A3) and Hook Park
Cross boundary outline application with Royal Borough of Kingston upon Thames: Development within Elmbridge includes highway works to Kingston Bypass (A309) providing new primary access, altered road layout, new footways and cycle lanes, and works to Woodstock Lane to provide a new left turn only access onto Kingston Bypass. Development within Royal Borough of Kingston upon Thames: phased development including demolition of existing structures and the provision of new homes (Use Classes C2 and C3), non-residential uses (Use Classes E, F and Sui Generis), open spaces and other ancillary infrastructure. (All Matters reserved except for Access.) Application accompanied by an Environmental Statement.
-
2025/1325 Decided
Land West of Woodstock Lane North Long Ditton Surrey KT6
Screening Opinion as to whether an Environmental Impact Assessment is required for the proposed redevelopment of the site to provide up to 150 residential dwellings, associated access and parking, drainage and landscaping.
-
25/03283/AAC Awaiting decision
Land By Clayton Road, Kingston Bypass (A309), Esher Bypass (A3) And Hook Park
2025/2765 - Cross boundary outline application with Royal Borough of Kingston upon Thames: Development within Elmbridge includes highway works to Kingston Bypass (A309) providing new primary access, altered road layout, new footways and cycle lanes, and works to Woodstock Lane to provide a new left turn only access onto Kingston Bypass. Development within Royal Borough of Kingston upon Thames: phased development including demolition of existing structures and the provision of new homes (Use Classes C2 and C3), non-residential uses (Use Classes E, F and Sui Generis), open spaces and other ancillary infrastructure. (All Matters reserved except for Access.) Application accompanied by an Environmental Statement.
Other telecoms applications
In Elmbridge
-
2026/1639 Decided
Manor Farm Stoke D'Abernon Surrey KT11 3PX
Telecommunications Notification for the installation of a 0.6 metre dish antenna positioned at a height of 44.6 metres on a bearing of 121 degrees.
-
2026/1741 Awaiting decision
Byfleet Road Cobham Surrey KT11 1DS
Telecommunications Notification: Intent to replace and relocate 17.5m pole supporting 6no. antennas with 20m pole supporting 12no. antennas, replacement and relocation of 6no. equipment cabinets onto a wide section of existing drainage ditch complete with weed membrane and gravel, installation of 1no. equipment cabinet onto a wide section of existing drainage ditch complete with weed membrane and gravel, installation of 1.10m handrail on both ends of resurfaced drainage ditch on top of concrete pads and development ancillary thereto.
-
2026/1559 Decided
Oaken Lane Claygate Surrey KT10 0RQ
Telecommunications Notification: Intent to install new 10m wooden pole to facilitate fixed line broadband electronic communications apparatus.
-
2026/1562 Decided
Oaken Lane Claygate Surrey KT10 0RQ
Telecommunications Notification: Intent to install new 10m wooden pole to facilitate fixed line broadband electronic communications apparatus.
-
2026/1556 Decided
Oaken Lane Claygate Surrey KT10 0RQ
Telecommunications Notification: Intent to install new 10m wooden pole to facilitate fixed line broadband electronic communications apparatus.