Skip to content
PlanIndex Get alerts
Menu

Planning application

181 Ember Lane East Molesey Surrey KT8 0BU

Awaiting decision Elmbridge 2026/1535 Variation of Condition Under S73

Works: Extension Loft or dormer Windows or glazing

Relates to 2025/3370

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of Condition 2 (Approved Plans) and Removal of Conditions 4 (Balcony Screens) and Condition 5 (Obscure Glass) of planning permission 2025/3370 (Construction of a part single/part two-storey rear extension, partial conversion of garage into habitable living space, hipped roof and front and rear rooflights creating rooms in the roofspace, new side dormer window and alterations to fenestration following removal of chimney stacks) to alter rear gabled roof end to hipped end over balcony including side walls with timber posts and rear rooflights.

As published by the council, reference 2026/1535

Application record

Reference
2026/1535
Type
Variation of Condition Under S73
Status
Registered
Received
23 Jun 2026
Validated
15 Jul 2026
Ward
Thames Ditton Ward
Decision by
Officer delegated
Postcode
KT8 0BU

Site history

Applications at this address on the Elmbridge register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • 2025/3370 Granted

    181 Ember Lane East Molesey Surrey KT8 0BU

    Construction of a part single/part two-storey rear extension, partial conversion of garage into habitable living space, hipped roof and front and rear rooflights creating rooms in the roofspace, new side dormer window and alterations to fenestration following removal of chimney stacks.

    Decided 29 May 2026 Householder

Timeline

Dates from the published record

  1. 23 Jun 2026

    Received by Elmbridge

  2. 15 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 30 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 9 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Elmbridge took a median of 62 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 2025/3370 Granted

    181 Ember Lane East Molesey Surrey KT8 0BU

    Construction of a part single/part two-storey rear extension, partial conversion of garage into habitable living space, hipped roof and front and rear rooflights creating rooms in the roofspace, new side dormer window and alterations to fenestration following removal of chimney stacks.

    Decided 29 May 2026 Householder

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Elmbridge for determination, against a statutory target of eight weeks. Over the last year Elmbridge decided amendment applications in a median of 76 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 181 Ember Lane East Molesey Surrey KT8 0BU

    2025/3370 Submitted 19 Dec 2025 0m away

    Construction of a part single/part two-storey rear extension, partial conversion of garage into habitable living space, hipped roof and front and rear rooflights creating rooms in the roofspace, new side dormer window and alterations to fenestration following removal of chimney stacks.

    Granted Householder Extension Loft or dormer +1 21 docs
    Domestic
  • 185 Ember Lane East Molesey Surrey KT8 0BU

    2025/0477 Submitted 24 Feb 2025 36m away

    Part single/part two-storey side/rear extensions and roof extension incorporating rear dormer window and rooflights, with the addition of solar panels on left side elevation, following demolition of existing garage and conservatory.

    Refused Householder Extension Loft or dormer +2 31 docs
    Small domestic
  • 185 Ember Lane East Molesey Surrey KT8 0BU

    2025/2612 Submitted 8 Oct 2025 36m away

    Part single/part two-storey side/rear extensions and roof extension incorporating rear dormer window and rooflights, with the addition of solar panels on left side elevation, following demolition of existing garage and conservatory.

    Granted Householder Extension Loft or dormer +2 37 docs
    Small domestic
  • 187 Ember Lane East Molesey KT8 0BU

    2022/1859 Submitted 14 Jun 2022 50m away

    Tree Preservation Order EL:20/50 - Propose pruning to a safe distance 1 x Mature Oak.

    Split decision Trees 4 docs
  • 176 Ember Lane East Molesey Surrey KT8 0BS

    2021/2328 Submitted 25 Jun 2021 56m away

    Single-storey rear extension and boundary wall following demolition of existing rear projection.

    Granted Householder Extension Demolition 10 docs
    Small domestic
  • 70 Embercourt Road Thames Ditton Surrey KT7 0LW

    2022/2882 Submitted 21 Sep 2022 81m away

    Confirmation of Compliance with Condition: 6 (Landscaping scheme) of planning permission 2020/2572.

    Decided Conditions 5 docs

In Elmbridge

  • 2026/2086 Decided

    Holly Cottage Fairmile Park Road Cobham Surrey KT11 2PL

    Non-Material Amendment of planning permission 2026/0533 to amend the description to replace "integral garage" with "garage".

    27 Aug 2026 Amendments
  • 2026/1455 Granted

    20 The Drive Esher Surrey KT10 8DH

    Variation of Condition 2 (Approved Plans) of planning permission 2025/1738 (Roof extension incorporating rear dormer windows, increase in ridge height, first-floor side/rear extension, first-floor front extension, first-floor side extension, ground-floor front extension, solar panels, new front porch and alterations to fenestration following partial demolition of existing house) to add 2no. front rooflights and remove flat roof trim from the garage east elevation.

    16 Jun 2026 Amendments
  • 2026/1645 Granted

    31 Ashley Drive Walton-On-Thames Surrey KT12 1JT

    Variation to Condition 2 (Approved Plans) of planning permission 2025/1233 (Part two/part single storey rear extension, single storey side extension, rear dormer windows, open front porch and changes to fenestration and elevation materials) to extend the render/timber detailing to the entire front elevation and alterations to fenestration.

    6 Jul 2026 Amendments
  • 2026/1298 Granted

    28 River Mount Walton-On-Thames Surrey KT12 2PR

    Variation of Condition 2 (Approved Plans) of Planning Permission ref: 2025/2540 (Two-storey rear extension, roof extension incorporating dormer windows, new front porch, rooflights and alterations to fenestration). Variation to consist of alteration to size of ground floor aspect and to fenestration.

    1 Jun 2026 Amendments
  • 2026/1878 Decided

    43 The Drive Esher Surrey KT10 8DJ

    Non-Material Amendments to planning permission 2025/2063 to change the dark brown timber cladding to black timber cladding and to change the window frames to black.

    3 Aug 2026 Amendments