Planning application
6 Anne Way West Molesey Surrey KT8 2PT
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension.
As published by the council, reference 2025/1085
Application record
- Reference
- 2025/1085
- Type
- Prior Approval Householders
- Status
- Final Decision
- Decision
- Granted As published: Prior Approval Not Required
- Received
- 22 Apr 2025
- Validated
- 22 Apr 2025
- Decided
- 28 May 2025
- Ward
- Molesey West Ward
- Decision by
- Officer delegated
- Postcode
- KT8 2PT
Site history
Applications at this address on the Elmbridge register
This site has had 3 applications since 2025: 2 approved, 0 refused.
-
2025/1034 Withdrawn
6 Anne Way West Molesey Surrey KT8 2PT
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension following removal of chimney stack.
-
2025/1033 Granted
6 Anne Way West Molesey Surrey KT8 2PT
First-floor side extension, single-storey front extension, single-storey rear extension, pitched roof over front elevation and conversion of garage into living space following removal of rear chimney.
Timeline
Dates from the published record
-
22 Apr 2025
Received by Elmbridge
-
28 May 2025
Decision issued: Prior Approval Not Required
-
30 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Elmbridge granted permission on 28 May 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
6 Anne Way West Molesey Surrey KT8 2PT
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension following removal of chimney stack.
Withdrawn Prior approval Extension 12 docsSmall domestic -
6 Anne Way West Molesey Surrey KT8 2PT
First-floor side extension, single-storey front extension, single-storey rear extension, pitched roof over front elevation and conversion of garage into living space following removal of rear chimney.
Granted Householder Extension 24 docsSmall domestic -
14 Anne Way West Molesey Surrey KT8 2PT
Part two/part single storey side/front extension, rear dormer windows and alterations to fenestration.
Refused Householder Extension Loft or dormer +1 11 docsSmall domestic -
14 Anne Way West Molesey Surrey KT8 2PT
Part two/part single storey side/front extension, rear dormer windows and alterations to fenestration.
Refused Householder Extension Loft or dormer +1 6 docsSmall domestic -
4 Helen Close West Molesey Surrey KT8 2PU
Two-storey side extension, single-storey rear extension, conversion of garage into living space, increase in ridge height and alterations to fenestration following partial demolition of existing house.
Granted Householder Extension Roofing +2 8 docsSmall domestic -
8 Helen Close West Molesey Surrey KT8 2PU
Part two/part single-storey side extension, conversion of garage into living space and alterations to fenestration following partial demolition of the existing house.
Granted Householder Extension Demolition +1 14 docsSmall domestic
Other prior approval applications
In Elmbridge
-
2026/1917 Refused
4 Rosslyn Park Weybridge Surrey KT13 9QZ
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension which projects out from the rear wall of the original house by 4.00 metres, a maximum height of 3.18 metres and with an eaves height of 3.00 metres.
-
2026/1892 Granted
95 Grove Way Esher Surrey KT10 8HF
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension which projects out from the rear wall of the original house by 4.15 metres, a maximum height of 3 metres and with an eaves height of 2.85 metres following demolition of existing extension.
-
2026/2184 Awaiting decision
56 Rydens Grove Hersham Walton-On-Thames Surrey KT12 5RU
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension which projects out from the rear wall of the original house by 4.5 metres, a maximum height of 3.15 metres and with an eaves height of 2.98 metres.
-
2026/1895 Refused
4 Goldrings Road Oxshott Leatherhead Surrey KT22 0QR
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension which projects out from the rear wall of the original house by 4.48 metres, a maximum height of 3.30 metres and with an eaves height of 3.30 metres.
-
2026/2123 Awaiting decision
1 Foxholm Cottage Byfleet Road Cobham Surrey KT11 1EB
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension which projects out from the rear wall of the original house by 6.00 metres, a maximum height of 3.00 metres and with an eaves height of 3.00 metres.