Skip to content
PlanIndex Get alerts
Menu

Planning application

72 Ember Lane Esher Surrey KT10 8EN

Granted Elmbridge 2024/2472 Householder Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of 2 external side Air Conditioning units with acoustic enclosures to the first floor side elevation.

As published by the council, reference 2024/2472

Application record

Reference
2024/2472
Type
Householder Application
Status
Final Decision
Decision
Granted As published: Grant Planning Permission
Received
23 Sep 2024
Validated
15 Oct 2024
Decided
3 Jan 2025
Ward
Hinchley Wood and Weston Green Ward
Decision by
Officer delegated
Postcode
KT10 8EN

Site history

Applications at this address on the Elmbridge register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • 2025/1798 Decided

    72 Ember Lane Esher Surrey KT10 8EN

    Confirmation of Compliance with Condition: 4 (Noise from Plant and Equipment) of planning permission 2024/2472.

    Decided 10 Sep 2025 Conditions

Timeline

Dates from the published record

  1. 23 Sep 2024

    Received by Elmbridge

  2. 15 Oct 2024

    Validated

    Checked as complete and ready for consideration.

  3. 3 Jan 2025

    Decision issued: Grant Planning Permission

  4. 30 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 2025/1798 Decided

    72 Ember Lane Esher Surrey KT10 8EN

    Confirmation of Compliance with Condition: 4 (Noise from Plant and Equipment) of planning permission 2024/2472.

    Decided 10 Sep 2025 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 3 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 72 Ember Lane Esher Surrey KT10 8EN

    2025/1798 Submitted 14 Jul 2025 50 yards away

    Confirmation of Compliance with Condition: 4 (Noise from Plant and Equipment) of planning permission 2024/2472.

    Decided Conditions 4 docs
  • 70 Ember Lane Esher Surrey KT10 8EN

    2021/3850 Submitted 8 Nov 2021 50 yards away

    Tree Preservation Order EL:15/12 - Crown lift 1 x Oak.

    Granted Trees 4 docs
  • 70 Ember Lane Esher Surrey KT10 8EN

    2019/3489 Submitted 13 Dec 2019 50 yards away

    Tree Preservation Order EL:15/12 - Crown reduce 1 x Oak by 3m to previous points.

    Refused Trees 5 docs
  • 103 Ember Lane Esher Surrey KT10 8EQ

    2023/0729 Submitted 9 Mar 2023 50 yards away

    Rear dormer window and front rooflights.

    Granted Lawful development Loft or dormer Windows or glazing 19 docs
  • 93 Ember Lane Esher Surrey KT10 8EQ

    2021/3064 Submitted 26 Aug 2021 50 yards away

    Single-storey rear extension, conversion of garage into living space and alterations to fenestration.

    Granted Householder Extension Windows or glazing 9 docs
    Small domestic
  • Cheyne House 76 Ember Lane Esher Surrey KT10 8EN

    2025/1016 Submitted 11 Apr 2025 50 yards away

    Tree Preservation Order EL:98/10 - T1 - Oak: Crown reduce by 1.5-2m with final pruning wounds not exceeding 40mm diameter. Remove any deadwood from the crown. Reason: Continue cyclical pruning of the crown to help maintain the tree as close to its current size given its location and provide clearance from the utility lines.

    Granted Trees 6 docs

In Elmbridge

  • 2026/1934 Granted

    31 Common Road Claygate Esher Surrey KT10 0HG

    Single storey rear extension with alterations to fenestration.

    Received 7 Aug, published by the council 21 Aug 2026 Householder
  • 2026/1131 Granted

    9 Riverside Drive Esher Surrey KT10 8PG

    Part two-storey front extension, new front porch, two-storey rear extension and alterations to fenestration.

    Received 12 May, published by the council 30 Jul 2026 Householder
  • 2026/1856 Granted

    119 Silverdale Avenue Walton-On-Thames Surrey KT12 1EQ

    Two storey side/rear extension, alteration of the single storey rear extension roof, single storey rear outbuilding, side and rear canopy structures to accommodate outdoor kitchen, retention of the existing vehicular access with proposed replacement entrance gates with associated driveway and landscaping works to the front and rear including land level alterations and alterations to fenestration including metal gates and materiality following demolition of existing detached shed structure.

    Received 30 Jul, published by the council 21 Aug 2026 Householder
  • 2026/1442 Granted

    4 Cedar Close East Molesey Surrey KT8 9HR

    Side dormer window, first floor rear and side extension, single storey side extension, detached garage to rear garden following removal of existing prefabricated detached garage, side rooflights and alterations to fenestration.

    Received 15 Jun, published by the council 30 Jul 2026 Householder
  • 2026/1833 Granted

    5A Sassoons Cottages Cottimore Crescent Walton-On-Thames Surrey KT12 2DA

    Single-storey rear infill extension below existing structure and alterations to fenestration.

    Received 28 Jul, published by the council 14 Aug 2026 Householder