Planning application
101 and 101A High Street Esher Surrey KT10 9QE
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Listed Building Consent: Part-retrospective application for alterations to fenestration and alterations to ceiling roofs.
As published by the council, reference 2024/2257
Application record
- Reference
- 2024/2257
- Type
- Listed Building Consent
- Status
- Final Decision
- Decision
- Granted As published: Grant Listed Building Consent
- Received
- 27 Aug 2024
- Validated
- 25 Sep 2024
- Decided
- 12 Dec 2024
- Ward
- Esher Ward
- Decision by
- Officer delegated
- Postcode
- KT10 9QE
Site history
Applications at this address on the Elmbridge register
This site has had 2 applications since 2024: 2 approved, 0 refused.
-
2024/2232 Granted
101 and 101A High Street Esher Surrey KT10 9QE
Part-retrospective application for alterations to fenestration and alterations to ceiling roofs.
Timeline
Dates from the published record
-
27 Aug 2024
Received by Elmbridge
-
25 Sep 2024
Validated
Checked as complete and ready for consideration.
-
12 Dec 2024
Decision issued: Grant Listed Building Consent
-
30 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
2 later applications on the register refer to this one:
-
2025/0605 Decided
101 High Street Esher KT10 9QE
Confirmation of Compliance with Condition 3 (Brickwork cleaning) of planning permission 2024/2257.
-
2025/0490 Decided
101 High Street Esher Surrey KT10 9QE
Confirmation of Compliance with Condition 4 (Detailed drawings of a retained nib and downstand) of planning permission 2024/2257.
Documents
Plans, drawings, consultee responses and the officer's report
44 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Elmbridge granted permission on 12 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
101 High Street Esher KT10 9QE
Confirmation of Compliance with Condition 3 (Brickwork cleaning) of planning permission 2024/2257.
Decided Conditions 5 docs -
101 and 101A High Street Esher Surrey KT10 9QE
Part-retrospective application for alterations to fenestration and alterations to ceiling roofs.
Granted Full applications Windows or glazing 44 docs -
101 High Street Esher Surrey KT10 9QE
Confirmation of Compliance with Condition 4 (Detailed drawings of a retained nib and downstand) of planning permission 2024/2257.
Decided Conditions 5 docs -
105 High Street Esher Surrey KT10 9QE
Advertisement Consent: 3 x internally illuminated fascia signs, 1 x internally illuminated projecting sign and 18 x non-illuminated panel signs.
Refused Advertising 22 docs -
110 High Street Esher Surrey KT10 9QL
Removal of the existing outdoor seating area and balustrading enclosure and construction of a single storey front extension (enclosed seating area) with the roof comprising of a new permanent awning; flower beds and planters and new menu board.
Refused Full applications Extension 20 docsSmall domestic -
110 High Street Esher Surrey KT10 9QL
Esher Conservation Area - Sycamore Trees. On left hand side of car park 3 Sycamore trees to reduce and shape over. T1, T2, T3 On right hand side Sycamore tree is causing damage to wall to reduce in height. T4 Trees are within the Esher Conservation Area. We would like to reduce by 2.5m to growth points no larger than 60m. Removing approx. 20%.
Granted Trees 4 docs
Other heritage and listed building applications
In Elmbridge
-
2025/2535 Granted
Mole Cottage 15 Church Street Cobham Surrey KT11 3EG
Installation of a 500mm diameter Blue Plaque at 2400mm from ground level on side of building to face pavement.
-
2026/2127 Awaiting decision
Cedar House Mill Road Cobham KT11 3AL
Listed Building Consent: Retention of works to House B comprising structural strengthening works within the kitchen; the lifting and relaying of ground-floor finishes and installation of underfloor heating within the kitchen, Great Hall and entrance hall; and alterations to the first-floor gallery floor, including a plywood infill at the former stair opening.
-
2026/2112 Awaiting decision
United Reformed Church Queens Road Weybridge Surrey KT13 9UX
Listed Building Consent: Refurbishment of road frontage fencing, pedestrian and vehicle gates.
-
2026/2083 Awaiting decision
Quillets Royal Bell Road East Molesey Surrey KT8 0SS
Listed Building Consent: To install a replacement larger capacity guttering along the front of the house to improve the collection and discharge of rainwater, as current one fails in heavy rain.
-
2026/0680 Granted
8 Yew Tree Cottage Portsmouth Road Esher Surrey KT10 9AL
Listed Building Consent for the removal of spray foam insulation and repair and re-roofing of the main roof of the property using natural clay pantiles. The existing main roof covering consists of later concrete tiles which are not historically appropriate. The proposal is to remove these and reinstate natural clay pantiles to match the historic roof covering referenced in the listing description and visible on the adjoining cottage. The catslide extension, currently covered with concrete tiles, will not be altered as part of this proposal.