Land South of Creek Cottages Creek Road East Molesey Surrey KT8 9BE

Granted Elmbridge Full Application

Proposal

Detached two-storey building for Commercial Office use (Class E) (117sqm) with associated hard and soft landscaping, refuse and cycle store and parking.

As published by the council, reference 2024/2037

Timeline

Dates from the published record

  1. 30 Jul 2024

    Received by Elmbridge

  2. 14 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 8 Oct 2024

    Decision issued: Grant Planning Permission

  4. 30 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2024/1271 Awaiting decision

    33 Creek Road East Molesey Surrey KT8 9BE

    First-floor side/front extension.

    13 May 2024 18m away Householder
  • 2024/3234 Granted

    33 Creek Road East Molesey Surrey KT8 9BE

    First floor side/front extension.

    13 Dec 2024 18m away Householder
  • 2025/3441 Refused

    35 - 37 Creek Road East Molesey Surrey KT8 9BE

    Insertion of 4no. roof lights to the main pitched roof in order to provide natural light and ventilation to the existing first floor.

    30 Dec 2025 28m away Lawful development
  • 2026/1438 Awaiting decision

    Katey's House Ltd 35 - 37 Creek Road East Molesey Surrey KT8 9BE

    Front and rear rooflights and alterations to fenestration.

    15 Jun 2026 28m away Full applications
  • 2025/0702 Decided

    Prince Of Wales Public House 23 Bridge Road East Molesey Surrey KT8 9EU

    East Molesey Kent Town Conservation Area - T5 1 x Poplar to reduce height to around 4m above ground level (back to historic pruning points).

    17 Mar 2025 55m away Trees
  • 2024/2825 Granted

    Flat 2 41A Bridge Road East Molesey Surrey KT8 9ER

    Rear juliet balcony, side roof light and alterations to fenestration.

    29 Oct 2024 68m away Full applications

In Elmbridge

  • 2026/1360 Refused

    1A Rydens Grove Hersham Walton-On-Thames Surrey KT12 5RX

    Detached single-storey building for light industrial use (Class E(g)(iii)) with residential unit (C3) following demolition of existing building (Class E)

    8 Jun 2026 Full applications
  • 2025/3161 Granted

    22A and 22B High Street Cobham Surrey KT11 3EB

    Construction of a second and third floor to create 8 self-contained flats with private amenity space, two-storey rear extension to accommodate access and internal stairs; construction of a single storey rear outbuilding for cycle and refuse/recycle provision; re-provision of parking to the rear and hard/soft landscaping including green roofs.

    3 Dec 2025 Full applications
  • 2026/1049 Refused

    Ridgemount Devonshire Road Weybridge Surrey KT13 8HB

    Installation of new 2 metre (maximum) high east boundary wall with one new 1.9 metre high pedestrial gate and two new 1.9 metre high vehicular gates, following the removal of the existing 1.2 metre high east boundary wall.

    5 May 2026 Full applications
  • 2026/0079 Granted

    Flat 1 3A Bridge Road East Molesey Surrey KT8 9EU

    Construction of a third floor self-contained residential flat with an increase in roof ridge height, dormer windows and private amenity space.

    13 Jan 2026 Full applications
  • 2026/0911 Granted

    49A Church Street Weybridge Surrey KT13 8DG

    Replacement of nine single-glazed timber windows with timber effect double-glazed uPVC windows to match the appearance of the existing windows.

    17 Apr 2026 Full applications