Planning application

16 Clare Hill Esher Surrey KT10 9NB

Granted Elmbridge 2024/1383 Householder Application

Works: Extension Loft or dormer Demolition Windows or glazing Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Two-storey rear infill extension, roof extension incorporating rear dormer windows, alterations to existing front dormer, solar panels and alterations to fenestration following partial demolition of existing house.

As published by the council, reference 2024/1383

Application record

Reference
2024/1383
Type
Householder Application
Status
Final Decision
Decision
Granted As published: Grant Planning Permission
Received
23 May 2024
Validated
11 Jun 2024
Decided
6 Aug 2024
Ward
Esher Ward
Decision by
Officer delegated
Postcode
KT10 9NB

Site history

Applications at this address on the Elmbridge register

This site has had 2 applications since 2024: 1 approved, 1 refused.

  • 2024/3198 Refused

    16 Clare Hill Esher Surrey KT10 9NB

    Two-storey front/side/rear extension, roof extension incorporating rear dormer windows and pitched rooflights, alterations to existing front dormer, solar panels and alterations to fenestration following partial demolition of existing house.

    Decided 18 Feb 2025 Householder

Timeline

Dates from the published record

  1. 23 May 2024

    Received by Elmbridge

  2. 11 Jun 2024

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2024

    Decision issued: Grant Planning Permission

  4. 30 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 6 August 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 16 Clare Hill Esher Surrey KT10 9NB

    2024/3198 Submitted 10 Dec 2024 50 yards away

    Two-storey front/side/rear extension, roof extension incorporating rear dormer windows and pitched rooflights, alterations to existing front dormer, solar panels and alterations to fenestration following partial demolition of existing house.

    Refused Householder Extension Loft or dormer +2 33 docs
    Domestic
  • 11 Clare Hill Esher Surrey KT10 9NA

    2020/1032 Submitted 30 Apr 2020 100 yards away

    Confirmation of Compliance with Condition 8 (Plant Noise and Vibration) of planning application 2017/0720 allowed at appeal.

    Decided Conditions 6 docs
  • Kookaburra 11 Clare Hill Esher Surrey KT10 9NA

    2022/0205 Submitted 24 Jan 2022 100 yards away

    Tree Preservation Order EL:17/05 - Crown clean 1 x Copper Beech.

    Granted Trees 4 docs
  • 11 Clare Hill Esher Surrey KT10 9NA

    2021/0670 Submitted 25 Feb 2021 100 yards away

    Tree Preservation Order EL:17/05 - Crown reduce 1 x Copper Beech by 2m.

    Refused Trees 8 docs
  • 6 Old Chestnut Avenue Claremont Park Esher Surrey KT10 9LS

    2019/3569 Submitted 20 Dec 2019 150 yards away

    Single-storey rear extension, new raised patio and alterations to fenestration following demolition of existing rear projection.

    Granted Householder Extension Demolition +1 19 docs
    Small domestic
  • 25 Clare Hill Esher Surrey KT10 9NB

    2020/3565 Submitted 21 Dec 2020 200 yards away

    Tree Preservation Order EL:99/02 - Remove dead branch of 1 x Oak (T4).

    Granted Trees 4 docs

In Elmbridge

  • 2026/1934 Granted

    31 Common Road Claygate Esher Surrey KT10 0HG

    Single storey rear extension with alterations to fenestration.

    Received 7 Aug, published by the council 21 Aug 2026 Householder
  • 2026/1131 Granted

    9 Riverside Drive Esher Surrey KT10 8PG

    Part two-storey front extension, new front porch, two-storey rear extension and alterations to fenestration.

    Received 12 May, published by the council 30 Jul 2026 Householder
  • 2026/1856 Granted

    119 Silverdale Avenue Walton-On-Thames Surrey KT12 1EQ

    Two storey side/rear extension, alteration of the single storey rear extension roof, single storey rear outbuilding, side and rear canopy structures to accommodate outdoor kitchen, retention of the existing vehicular access with proposed replacement entrance gates with associated driveway and landscaping works to the front and rear including land level alterations and alterations to fenestration including metal gates and materiality following demolition of existing detached shed structure.

    Received 30 Jul, published by the council 21 Aug 2026 Householder
  • 2026/1442 Granted

    4 Cedar Close East Molesey Surrey KT8 9HR

    Side dormer window, first floor rear and side extension, single storey side extension, detached garage to rear garden following removal of existing prefabricated detached garage, side rooflights and alterations to fenestration.

    Received 15 Jun, published by the council 30 Jul 2026 Householder
  • 2026/1833 Granted

    5A Sassoons Cottages Cottimore Crescent Walton-On-Thames Surrey KT12 2DA

    Single-storey rear infill extension below existing structure and alterations to fenestration.

    Received 28 Jul, published by the council 14 Aug 2026 Householder