Skip to content
PlanIndex Get alerts
Menu

Planning application

61 Pemberton Road East Molesey Surrey KT8 9LG

Granted Elmbridge 2024/0641 Lawful Development Cert - Proposed

Works: Extension Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Hip-to-gable roof extension incorporating rear L-shaped dormer window and removal of chimney stack

As published by the council, reference 2024/0641

Application record

Reference
2024/0641
Type
Lawful Development Cert - Proposed
Status
Final Decision
Decision
Grant Lawful Development Cert - Proposed
Received
11 Mar 2024
Validated
11 Mar 2024
Decided
8 May 2024
Ward
Molesey East Ward
Decision by
Officer delegated
Postcode
KT8 9LG

Site history

Applications at this address on the Elmbridge register

This site has had 4 applications since 2023: 3 approved, 1 refused.

  • 2024/2156 Granted

    61 Pemberton Road East Molesey Surrey KT8 9LG

    Variation of Condition: 2 (Approved Plans) of planning permission 2023/2786 (Single-storey rear/side extension) to revise ground floor footprint, revise the rear door and alterations to side elevation including repositioning of a ground floor side window, and replacing side door with window.

    Decided 22 Oct 2024 Amendments
  • 2023/3472 Refused

    61 Pemberton Road East Molesey Surrey KT8 9LG

    Hip-to-gable roof extension incorporating rear L-shaped dormer window and removal of chimney stack

    Decided 28 Feb 2024 Lawful development
  • 2023/2786 Granted

    61 Pemberton Road East Molesey Surrey KT8 9LG

    Single-storey rear/side extension.

    Decided 21 Dec 2023 Householder

Timeline

Dates from the published record

  1. 11 Mar 2024

    Received by Elmbridge

  2. 8 May 2024

    Decision issued: Grant Lawful Development Cert - Proposed

  3. 14 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 8 May 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 61 Pemberton Road East Molesey Surrey KT8 9LG

    2023/3472 Submitted 20 Dec 2023 0m away

    Hip-to-gable roof extension incorporating rear L-shaped dormer window and removal of chimney stack

    Refused Lawful development Extension Loft or dormer +1 11 docs
  • 61 Pemberton Road East Molesey Surrey KT8 9LG

    2023/2786 Submitted 10 Oct 2023 0m away

    Single-storey rear/side extension.

    Granted Householder Extension 13 docs
    Small domestic
  • 65 Pemberton Road East Molesey Surrey KT8 9LG

    2025/2729 Submitted 20 Oct 2025 13m away

    Single-storey side extension and alterations to fenestration.

    Granted Householder Extension Windows or glazing 16 docs
    Small domestic
  • 60 Pemberton Road East Molesey Surrey KT8 9LH

    2025/1358 Submitted 23 May 2025 31m away

    Hip-to-gable roof extensions and rear dormer window.

    Granted Lawful development Extension Loft or dormer +1 10 docs
  • 56 Pemberton Road East Molesey Surrey KT8 9LH

    2024/0661 Submitted 12 Mar 2024 38m away

    Single-storey rear extension and alterations to fenestration following demolition of existing conservatory and removal of chimney.

    Granted Householder Extension Demolition +1 18 docs
    Small domestic
  • St Barnabus R C Church Vine Road East Molesey Surrey KT8 9LF

    2025/1052 Submitted 16 Apr 2025 60m away

    East Molesey Kent Conservation Area - T1 - Walnut. Current height 10m. Current span 9m. Reduce tree by 3 meters and to good shape. Tree has previously been reduced in the past. This prune in to keep healthy shape of tree and maintain size. T2 - Conifer. Current height 9m. Current span 7m. Reduce by circa 4 meters in height and trim sides to good shape. Reducing in height as this Conifer grown too tall next to neighbouring property. Maintaining health of tree.

    Granted Trees 6 docs

In Elmbridge

  • 2026/1633 Refused

    41 Ember Lane Esher Surrey KT10 8EA

    Single storey rear extension.

    3 Jul 2026 Lawful development
  • 2026/1461 Refused

    1 Home Farm Close Esher Surrey KT10 9HA

    Outbuilding following removal of existing outbuilding.

    16 Jun 2026 Lawful development
  • 2026/1877 Granted

    21 Manor Walk Weybridge Surrey KT13 8SD

    Single storey side extension following demolition of existing detached outbuilding.

    31 Jul 2026 Lawful development
  • 2026/1739 Granted

    20 Sidney Road Walton-OnThames Surrey KT12 2NA

    Bifold doors to rear following demolition of existing rear bay window.

    16 Jul 2026 Lawful development
  • 2026/1664 Granted

    12 Green Lane Cobham Surrey KT11 2NN

    Enlargement of rear first-floor window.

    7 Jul 2026 Lawful development