Planning application
11 Sovereign House 1 Bridge Road East Molesey Surrey KT8 9EP
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement windows and condensing unit on roof.
As published by the council, reference 2023/3028
Application record
- Reference
- 2023/3028
- Type
- Full Application
- Status
- Final Decision
- Decision
- Grant Planning Permission
- Received
- 6 Nov 2023
- Validated
- 23 Nov 2023
- Decided
- 21 Feb 2024
- Ward
- Molesey East Ward
- Decision by
- Officer delegated
- Postcode
- KT8 9EP
Timeline
Dates from the published record
-
6 Nov 2023
Received by Elmbridge
-
23 Nov 2023
Validated
Checked as complete and ready for consideration.
-
21 Feb 2024
Decision issued: Grant Planning Permission
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
25 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Flat 1 3A Bridge Road East Molesey Surrey KT8 9EU
Construction of a third floor self-contained residential flat with an increase in roof ridge height, dormer windows and private amenity space.
Granted Full applications Loft or dormer Roofing +1 24 docs -
5A Bridge Road East Molesey Surrey KT8 9EU
Confirmation of Compliance with Condition: 4 (Noise Insulation to Buildings), 5 (Insulation - Commercial and Residential and including the ground floor garage andstorage unit), 6 (Insulation - Residential to residential), 9 (Tree Protection Measures (With Pre-Commencement Meeting)) and 10 (Additional Arboricultural Information) of planning permission 2022/2378.
Refused Conditions Trees 9 docs -
5 Bridge Road East Molesey Surrey KT8 9EU
Non-Material Amendment to planning permission 2020/2106 to add 35mm gas pipe to front elevation.
Decided Amendments 5 docs -
5 Bridge Road East Molesey Surrey KT8 9EU
Three-storey rear extension comprising two flats with garage and storage at ground floor following demolition of existing garage and storage unit.
Refused Full applications New dwelling Extension +1 26 docsSeveral homes -
5 Bridge Road East Molesey Surrey KT8 9EU
Three-storey rear extension comprising two flats with garage and storage at ground-floor following demolition of existing garage and storage unit.
Granted Full applications New dwelling Extension +1 44 docsSeveral homes -
Kiosk River Bank Land Opposite 1 Bridge Road East Molesey Surrey KT8 9EU
Retrospective application for siting of trailer used for the sale of food and drink with associated decking and metal fencing.
Granted Full applications 35 docs
Other full applications applications
In Elmbridge
-
2026/1551 Granted
Squirrels Leap 13 Fernhill Oxshott Leatherhead Surrey KT22 0JH
Two pairs of semi-detached two-storey houses with rooms in the roofspace, bin and cycle storage, new access, associated parking and landscaping following demolition of existing house and detached garage and outbuildings.
-
2025/2670 Granted
Cartref Ellesmere Road Weybridge Surrey KT13 0HY
Residential development comprising 3 detached two-storey houses with rooms in roof space, 1 with a detached garage, and 6 pairs of semi-detached two-storey houses with rooms in the roof space, bin and cycle stores and associated hard and soft landscaping following the demolition of existing house and associated outbuildings.
-
2026/0550 Refused
Tanglewood Sandy Lane Cobham Surrey KT11 2EP
Two-storey detached house with rooms in the roofspace and dormer windows following demolition of the existing house.
-
2026/1406 Decided
Unit 1 Worthy Yard Redhill Road Cobham Surrey KT11 1EG
Application for temporary change of use of land for vehicle parking in connection with vehicle storage and recovery depot (2 years)
-
2026/1475 Granted
15 Ashley Park Road Walton-On-Thames Surrey KT12 1JU
Subdivision of the existing residential plot and the construction of a single self-build residential dwelling, detached garage, parking, new vehicle access from Ashley Park Road with associated entrance gates, pedestrian access from Ashley Drive with associated gate, and associated bin storage and landscaping.