Planning application
31 High Street Thames Ditton Surrey KT7 0SD
Works: Windows or glazing
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Replacement shopfront and installation of security shutter.
As published by the council, reference 2023/2480
Application record
- Reference
- 2023/2480
- Type
- Full Application
- Status
- Final Decision
- Decision
- Refuse Planning Permission
- Received
- 7 Sep 2023
- Validated
- 18 Oct 2023
- Decided
- 4 Dec 2023
- Ward
- Thames Ditton Ward
- Decision by
- Officer delegated
- Postcode
- KT7 0SD
Site history
Applications at this address on the Elmbridge register
This site has had 3 applications since 2023: 2 approved, 1 refused.
Timeline
Dates from the published record
-
7 Sep 2023
Received by Elmbridge
-
18 Oct 2023
Validated
Checked as complete and ready for consideration.
-
4 Dec 2023
Decision issued: Refuse Planning Permission
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this refusal means
Elmbridge refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
31 High Street Thames Ditton Surrey KT7 0SD
Installation of security shutter on external face of shopfront.
Granted Full applications Windows or glazing 16 docs -
31 High Street Thames Ditton Surrey KT7 0SD
Replacement shopfront.
Granted Full applications Windows or glazing 15 docs -
33 High Street Thames Ditton Surrey KT7 0SD
Replacement roof to single-storey front projection.
Refused Lawful development Roofing 8 docsSmall domestic -
27 High Street Thames Ditton Surrey KT7 0SD
Change of use of ground floor from Class E(c) (Sound and film studio) to Class (C3) (Dwelling) and alterations to fenestration.
Granted Full applications Windows or glazing 29 docsDomestic -
32 High Street Thames Ditton Surrey KT7 0RY
Thames Ditton Conservation Area - Fell 1 x Conifer, fell 1 x Silver birch and fell 1 x Laurel tree (shrub).
Decided Trees 4 docs -
32 High Street Thames Ditton Surrey KT7 0RY
Tree Preservation Order EL:20/37 - Crown reduce 1 x Silver birch.
Refused Trees 6 docs
Other full applications
In Elmbridge
-
2026/1384 Granted
20 Sandy Lane Walton-On-Thames Surrey KT12 2EQ
Proposed construction of 5 No houses following demolition of existing buildings with modified access, associated amenity space, parking provision, cycle storage and bin storage.
-
2026/1551 Granted
Squirrels Leap 13 Fernhill Oxshott Leatherhead Surrey KT22 0JH
Two pairs of semi-detached two-storey houses with rooms in the roofspace, bin and cycle storage, new access, associated parking and landscaping following demolition of existing house and detached garage and outbuildings.
-
2025/2670 Granted
Cartref Ellesmere Road Weybridge Surrey KT13 0HY
Residential development comprising 3 detached two-storey houses with rooms in roof space, 1 with a detached garage, and 6 pairs of semi-detached two-storey houses with rooms in the roof space, bin and cycle stores and associated hard and soft landscaping following the demolition of existing house and associated outbuildings.
-
2026/0550 Refused
Tanglewood Sandy Lane Cobham Surrey KT11 2EP
Two-storey detached house with rooms in the roofspace and dormer windows following demolition of the existing house.
-
2026/1406 Decided
Unit 1 Worthy Yard Redhill Road Cobham Surrey KT11 1EG
Application for temporary change of use of land for vehicle parking in connection with vehicle storage and recovery depot (2 years)