Planning application
14 Woodend Esher Surrey KT10 8DA
Works: Extension Loft or dormer Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Hip-to-gable roof extension incorporating rear dormer window and front rooflights, front gable extension, front porch canopy and alterations to fenestration.
As published by the council, reference 2023/2469
Application record
- Reference
- 2023/2469
- Type
- Householder Application
- Status
- Final Decision
- Decision
- Grant Planning Permission
- Received
- 6 Sep 2023
- Validated
- 21 Sep 2023
- Decided
- 4 Jan 2024
- Ward
- Hinchley Wood and Weston Green Ward
- Decision by
- Officer delegated
- Postcode
- KT10 8DA
Timeline
Dates from the published record
-
6 Sep 2023
Received by Elmbridge
-
21 Sep 2023
Validated
Checked as complete and ready for consideration.
-
4 Jan 2024
Decision issued: Grant Planning Permission
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About householder applications
How this application type works
Householder applications cover work to an existing house and its garden: extensions, loft and garage conversions, porches, outbuildings and similar alterations within the boundary of the home. They cannot be used to create a separate dwelling or change what the building is used for. Councils aim to decide them within eight weeks, and immediate neighbours are usually notified and given a chance to comment.
Nearby applications
Within 500 metres
-
14 Woodend Esher Surrey KT10 8DA
73% historically approved · decision due ~30 Oct
Variation of Condition 2 (Approved Plans) of planning permission 2023/2469 (Hip-to-gable roof extension incorporating rear dormer window and front rooflights, front gable extension, front porch canopy and alterations to fenestration) to increase footprint of front porch, add 1no. side rooflight and alterations to front and rear fenestration.
Awaiting decision Amendments Extension Loft or dormer +1 8 docsSmall domestic -
1 Woodend Esher Surrey KT10 8DA
Extensions and alterations to convert existing single-storey house into a two-storey house with rooms in the roof space following partial demolition of the existing house.
Refused Householder Extension Demolition 17 docsSmall domestic -
1 Woodend Esher Surrey KT10 8DA
Two-storey side extension, two-storey front extension creating bay window, removal of existing roof to bungalow and replaced with additional floor and new loft space to facilitate a second floor with rear dormer windows and front and side rooflights and alterations to fenestration and eaves height following demolition of existing conservatory.
Refused Householder Extension Loft or dormer +2 25 docsSmall domestic -
1 Woodend Esher Surrey KT10 8DA
Tree Preservation Order EL:24/05 - T1- OAK- Reduce crown by 1.5m/ back to previously reduced pruning points to increase light into all surrounding properties and limit the amount of debris dropping onto buildings, parked vehicles & children's play areas/ gardens below. Current height 18m, remove 1.5m, height to be left at 16.5m. Current width 13m, remove 1.5m from both sides, width to be left at 9m. Crown thin the tree by 20%, focusing on the Right side to even out the density & to further assist the increase of light into all surrounding properties. Remove basal growth up to 3m/ lowest limb. Removal all dead & damaged branches.
Split decision Trees 5 docs -
54 Lower Green Road Esher Surrey KT10 8HD
Non-Material Amendments to 2024/3151 to alter the external finish from render to brick and alter siting.
Decided Amendments 13 docs -
54 Lower Green Road Esher Surrey KT10 8HD
Single-storey rear extension, rear patio, balustrade, landscape alterations and alterations to fenestration.
Granted Householder Extension Windows or glazing 15 docsSmall domestic
Other householder applications
In Elmbridge
-
2026/1651 Granted
Sennen Cottage Evelyn Way Stoke D'Abernon Cobham Surrey KT11 2SJ
Two storey front extension including bay window, part two/part single storey side and rear extensions and alterations to fenestration following demolition of existing rear conservatory and garage,
-
2026/1624 Granted
23 Eaton Park Road Cobham Surrey KT11 2JJ
Single storey side extension.
-
2026/1800 Granted
Derwent The Fairway Weybridge Surrey KT13 0RZ
Single-storey rear extension following partial demolition of existing house.
-
2026/1091 Granted
11 Burstead Close Cobham Surrey KT11 2NL
Part two/part single-storey side/rear extension, single-storey front extension, front dormer window, flat roof over existing garage and rooflight.
-
2026/1335 Granted
15 Heath Ridge Green Cobham Surrey KT11 2QL
Roof extension to provide rooms in the roofspace including front and rear dormers, single storey rear extension with first floor terrace above and alterations to fenestration.