Planning application
5 Hurst Road East Molesey Surrey KT8 9AQ
Works: Extension Windows or glazing
Relates to 2022/3779
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of Condition 2 (Approved Plans) and Removal of Condition 6 (Noise from Plant and Equipment) of planning permission 2022/3779 (Extensions) with alterations to patio area, changes to fenestration and removal of heat source pump.
As published by the council, reference 2023/2374
Application record
- Reference
- 2023/2374
- Type
- Variation of Condition Under S73
- Status
- Final Decision
- Decision
- Granted As published: Grant Planning Permission
- Received
- 24 Aug 2023
- Validated
- 24 Aug 2023
- Decided
- 5 Jan 2024
- Ward
- Molesey East Ward
- Decision by
- Officer delegated
- Postcode
- KT8 9AQ
Site history
Applications at this address on the Elmbridge register
This site has had 6 applications since 2021: 4 approved, 1 refused.
-
2023/2373 Decided
5 Hurst Road East Molesey Surrey KT8 9AQ
Confirmation of Compliance with Condition: 5 (Screen walls, fences and planting (details)) of planning permission 2022/3779.
-
2023/1668 Granted
5 Hurst Road East Molesey Surrey KT8 9AQ
Hip-to-gable roof extension incorporating rear dormer window to provide rooms in the roof space, front and rear rooflights and chimney stack extension following removal of chimney stack.
-
2022/3779 Granted
5 Hurst Road East Molesey Surrey KT8 9AQ
Part two/part single-storey rear/side extension, first-floor front extension, single-storey front extension, rear patio, render and cladding, sliding gate and entrance gate, and alterations to fenestration following partial demolition of existing house and removal of chimney stack.
-
2021/4285 Refused
5 Hurst Road East Molesey Surrey KT8 9AQ
Part two/part single-storey side/rear extension, roof extension incorporating hip-to-gable, two rear dormer windows with balcony and front and rear rooflights, first-floor front extension, render and cladding, alterations to fenestration, patio, sliding gate and entrance gate and render front wall following partial demolition of existing house and removal of chimney stacks.
-
2021/2165 Granted
5 Hurst Road East Molesey Surrey KT8 9AQ
Single-storey rear outbuilding.
Timeline
Dates from the published record
-
24 Aug 2023
Received by Elmbridge
-
5 Jan 2024
Decision issued: Grant Planning Permission
-
14 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
2022/3779 Granted
5 Hurst Road East Molesey Surrey KT8 9AQ
Part two/part single-storey rear/side extension, first-floor front extension, single-storey front extension, rear patio, render and cladding, sliding gate and entrance gate, and alterations to fenestration following partial demolition of existing house and removal of chimney stack.
Documents
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Elmbridge granted permission on 5 January 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
5 Hurst Road East Molesey Surrey KT8 9AQ
Part two/part single-storey side/rear extension, roof extension incorporating hip-to-gable, two rear dormer windows with balcony and front and rear rooflights, first-floor front extension, render and cladding, alterations to fenestration, patio, sliding gate and entrance gate and render front wall following partial demolition of existing house and removal of chimney stacks.
Refused Householder Extension Loft or dormer +2 37 docsSmall domestic -
5 Hurst Road East Molesey Surrey KT8 9AQ
Part two/part single-storey rear/side extension, first-floor front extension, single-storey front extension, rear patio, render and cladding, sliding gate and entrance gate, and alterations to fenestration following partial demolition of existing house and removal of chimney stack.
Granted Householder Extension Demolition +1 40 docsSmall domestic -
5 Hurst Road East Molesey Surrey KT8 9AQ
Single-storey rear outbuilding.
Granted Householder 15 docsSmall domestic -
5 Hurst Road East Molesey Surrey KT8 9AQ
Hip-to-gable roof extension incorporating rear dormer window to provide rooms in the roof space, front and rear rooflights and chimney stack extension following removal of chimney stack.
Granted Lawful development Extension Loft or dormer +1 17 docs -
5 Hurst Road East Molesey Surrey KT8 9AQ
Confirmation of Compliance with Condition: 5 (Screen walls, fences and planting (details)) of planning permission 2022/3779.
Decided Conditions 11 docs -
9 Hurst Road East Molesey Surrey KT8 9AQ
Single-storey rear/side extension, rear raised patio, conversion of garage into living space and alterations to fenestration following partial demolition of existing house.
Granted Householder Extension Demolition +1 19 docsSmall domestic
Other amendment applications
In Elmbridge
-
2026/1677 Refused
Laurelwood Cavendish Road Weybridge Surrey KT13 0JY
Variation of Condition 4 (Tree Protection Measures) and 5 (Site Supervision) of planning permission 2025/1959 (Detached two-storey house with attached garage and associated landscaping following demolition of the existing house) to amend Tree Protection Plans and Tree Planting & Hard Surfaces Plan within approved arboricultural report.
-
2026/2363 Awaiting decision
Land off Anyards Road and Copse Road Cobham Surrey KT11 2LH
Non-Material Amendment to planning permission 2025/0373 to revise the landscape plan to remove the trees from the rear gardens of plots 1-8 and replace them within management controlled areas.
-
2026/1471 Granted
15 Chaucer Avenue Weybridge Surrey KT13 0SS
Variation of Condition 2 (Approved Plans) of planning permission 2025/3172 (Single-storey side and rear extension and extended patio following partial demolition of existing house) to relocate patio stairs and extend patio with an additional stepped level and balustrades.
-
2026/2340 Awaiting decision
Weybridge Health Centre 22 Church Street Weybridge Surrey KT13 8DW
Non-Material Amendment to planning permission to 2024/3065 to remove existing wall on part of the western boundary, relocation of bin store and partial reconstruction of the removed wall and to amend the wording of Conditions 8 (Cycle Parking), 15 (SuDS Verification) and 26 (Habitat Management and Maintenance Plan) to specify 'completed development'.
-
2026/2333 Awaiting decision
103 Grange Road West Molesey Surrey KT8 2PR
Removal of Conditions: 5 (Tree Protection Measures) and 6 (Site supervision) of 2024/3083 (Single-storey rear extension, rear dormer window and alterations to fenestration following partial demolition of rear projection) to remove tree conditions based on the findings of the report as the original conditions cannot be complied with.