Skip to content
PlanIndex Get alerts
Menu

Planning application

4 Bell Road East Molesey Surrey KT8 0SS

Granted Elmbridge 2023/1918 Full Application

Works: Windows or glazing

Relates to 2023/2092

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Three replacement first-floor windows on rear elevationANDListed Building Consent for replacement windows at first-floor rear with minor repairs to other existing windows (2023/2092).

As published by the council, reference 2023/1918

Application record

Reference
2023/1918
Type
Full Application
Status
Final Decision
Decision
Grant Planning Permission
Received
10 Jul 2023
Validated
10 Jul 2023
Decided
4 Sep 2023
Ward
Molesey East Ward
Decision by
Officer delegated
Postcode
KT8 0SS

Site history

Applications at this address on the Elmbridge register

This site has had 7 applications since 2021: 5 approved, 2 refused.

  • 2024/1470 Granted

    4 Bell Road East Molesey Surrey KT8 0SS

    Listed Building Consent: Nine replacement ground floor windows and two replacement first-floor windows to side elevation, structural works to three brick chimneys, external refurbishment comprising repairs to front porch and rendered walls and full redecoration in association with planning application (2024/1451).

    Decided 9 Aug 2024 Heritage and listed buildings
  • 2024/1451 Granted

    4 Bell Road East Molesey Surrey KT8 0SS

    Nine replacement ground floor windows and two replacement first-floor windows to front and side elevations, structural works to three brick chimneys and external refurbishment comprising repairs to front porch, rendering of walls and full redecoration in association with Listed Building Consent application (2024/1470).

    Decided 9 Aug 2024 Full applications
  • 2023/2092 Granted

    4 Bell Road East Molesey Surrey KT8 0SS

    Listed Building Consent for three replacement first-floor windows on rear elevation with minor repairs to other windows in association with planning permission 2023/1918.

    Decided 4 Sep 2023 Heritage and listed buildings
  • 2023/0673 Refused

    4 Bell Road East Molesey Surrey KT8 0SS

    Replacement windows for first-floor rear elevationANDListed Building Consent for replacement windows (2023/0680).

    Decided 1 Jun 2023 Full applications
  • 2023/0680 Refused

    4 Bell Road East Molesey Surrey KT8 0SS

    Listed Building Consent: Three replacement windows at first-floor rear in association with planning permission 2023/0673.

    Decided 1 Jun 2023 Heritage and listed buildings
  • 2021/0519 Granted

    4 Bell Road East Molesey Surrey KT8 0SS

    Rear shelter (32sqm) and children's play equipment.

    Decided 6 Aug 2021 Full applications

Timeline

Dates from the published record

  1. 10 Jul 2023

    Received by Elmbridge

  2. 4 Sep 2023

    Decision issued: Grant Planning Permission

  3. 14 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2023/2092 Granted

    4 Bell Road East Molesey Surrey KT8 0SS

    Listed Building Consent for three replacement first-floor windows on rear elevation with minor repairs to other windows in association with planning permission 2023/1918.

    Decided 4 Sep 2023 Heritage and listed buildings

1 later application on the register refers to this one:

  • 2023/2092 Granted

    4 Bell Road East Molesey Surrey KT8 0SS

    Listed Building Consent for three replacement first-floor windows on rear elevation with minor repairs to other windows in association with planning permission 2023/1918.

    Decided 4 Sep 2023 Heritage and listed buildings

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 4 September 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 4 Bell Road East Molesey Surrey KT8 0SS

    2021/0519 Submitted 15 Feb 2021 0m away

    Rear shelter (32sqm) and children's play equipment.

    Granted Full applications 22 docs
  • 4 Bell Road East Molesey Surrey KT8 0SS

    2023/2092 Submitted 10 Jul 2023 0m away

    Listed Building Consent for three replacement first-floor windows on rear elevation with minor repairs to other windows in association with planning permission 2023/1918.

    Granted Heritage and listed buildings Windows or glazing 4 docs
  • 4 Bell Road East Molesey Surrey KT8 0SS

    2024/1470 Submitted 3 Jun 2024 0m away

    Listed Building Consent: Nine replacement ground floor windows and two replacement first-floor windows to side elevation, structural works to three brick chimneys, external refurbishment comprising repairs to front porch and rendered walls and full redecoration in association with planning application (2024/1451).

    Granted Heritage and listed buildings Extension Windows or glazing 15 docs
    Small domestic
  • 4 Bell Road East Molesey Surrey KT8 0SS

    2024/1451 Submitted 3 Jun 2024 0m away

    Nine replacement ground floor windows and two replacement first-floor windows to front and side elevations, structural works to three brick chimneys and external refurbishment comprising repairs to front porch, rendering of walls and full redecoration in association with Listed Building Consent application (2024/1470).

    Granted Full applications Extension Windows or glazing 14 docs
    Small domestic
  • 4 Bell Road East Molesey Surrey KT8 0SS

    2023/0673 Submitted 6 Mar 2023 0m away

    Replacement windows for first-floor rear elevationANDListed Building Consent for replacement windows (2023/0680).

    Refused Full applications Windows or glazing 14 docs
  • 4 Bell Road East Molesey Surrey KT8 0SS

    2023/0680 Submitted 6 Mar 2023 0m away

    Listed Building Consent: Three replacement windows at first-floor rear in association with planning permission 2023/0673.

    Refused Heritage and listed buildings Windows or glazing 14 docs

In Elmbridge

  • 2026/1551 Granted

    Squirrels Leap 13 Fernhill Oxshott Leatherhead Surrey KT22 0JH

    Two pairs of semi-detached two-storey houses with rooms in the roofspace, bin and cycle storage, new access, associated parking and landscaping following demolition of existing house and detached garage and outbuildings.

    24 Jun 2026 Full applications
  • 2025/2670 Granted

    Cartref Ellesmere Road Weybridge Surrey KT13 0HY

    Residential development comprising 3 detached two-storey houses with rooms in roof space, 1 with a detached garage, and 6 pairs of semi-detached two-storey houses with rooms in the roof space, bin and cycle stores and associated hard and soft landscaping following the demolition of existing house and associated outbuildings.

    14 Oct 2025 Full applications
  • 2026/0550 Refused

    Tanglewood Sandy Lane Cobham Surrey KT11 2EP

    Two-storey detached house with rooms in the roofspace and dormer windows following demolition of the existing house.

    4 Mar 2026 Full applications
  • 2026/1406 Decided

    Unit 1 Worthy Yard Redhill Road Cobham Surrey KT11 1EG

    Application for temporary change of use of land for vehicle parking in connection with vehicle storage and recovery depot (2 years)

    11 Jun 2026 Full applications
  • 2026/1475 Granted

    15 Ashley Park Road Walton-On-Thames Surrey KT12 1JU

    Subdivision of the existing residential plot and the construction of a single self-build residential dwelling, detached garage, parking, new vehicle access from Ashley Park Road with associated entrance gates, pedestrian access from Ashley Drive with associated gate, and associated bin storage and landscaping.

    18 Jun 2026 Full applications