Planning application
2 Tufton Gardens West Molesey Surrey KT8 1TE
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior Approval Schedule 2, Part 1, Class A: Single-storey rear extension.
As published by the council, reference 2023/1662
Application record
- Reference
- 2023/1662
- Type
- Prior Approval Householders
- Status
- Final Decision
- Decision
- Prior Approval Not Required
- Received
- 13 Jun 2023
- Validated
- 13 Jun 2023
- Decided
- 21 Jul 2023
- Ward
- Molesey East Ward
- Decision by
- Officer delegated
- Postcode
- KT8 1TE
Timeline
Dates from the published record
-
13 Jun 2023
Received by Elmbridge
-
21 Jul 2023
Decision issued: Prior Approval Not Required
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
2 Tufton Gardens West Molesey Surrey KT8 1TE
Single-storey front infill extension and alterations to fenestration.
Granted Householder Extension Windows or glazing 13 docsSmall domestic -
2 Tufton Gardens West Molesey Surrey KT8 1TE
Front infill extension and alterations to fenestration.
Refused Lawful development Extension Windows or glazing 12 docs -
40 Tufton Gardens West Molesey Surrey KT8 1TE
Telecommunications Notification: Installation of high speed broadband cabinet.
Decided Telecoms 15 docs -
27 Bedster Gardens West Molesey Surrey KT8 1TA
Single-storey rear extension following demolition of existing rear detached garage.
Granted Lawful development Extension Demolition 11 docsSmall domestic -
52 Buckingham Gardens West Molesey Surrey KT8 1TJ
72% historically approved · decision due ~6 Oct
Rear dormer to provide rooms in the roofspace, juliet balcony and front rooflights.
Awaiting decision Lawful development Loft or dormer 10 docs -
16 Buckingham Gardens West Molesey Surrey KT8 1TH
Conversion of existing enclosed car port to create double garage to the rear.
Granted Lawful development 11 docs
Other prior approval applications
In Elmbridge
-
2026/2123 Awaiting decision
1 Foxholm Cottage Byfleet Road Cobham Surrey KT11 1EB
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension which projects out from the rear wall of the original house by 6.00 metres, a maximum height of 3.00 metres and with an eaves height of 3.00 metres.
-
2026/2092 Awaiting decision
70 Fleece Road Long Ditton Surbiton Surrey KT6 5JS
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension which projects out from the rear wall of the original house by 5.00 metres, a maximum height of 3.85 metres and with an eaves height of 2.98 metres following partial demolition of existing dwelling.
-
2025/3139 Refused
Unit C 207 St Georges Business Park Brooklands Road Weybridge Surrey KT13 0TS
Prior Approval Schedule 2, Part 3, Class MA: Change of Use from Commercial, Business and Service (E) to Residential (C3).
-
2026/1951 Awaiting decision
102 Upper Farm Road West Molesey Surrey KT8 2QU
Prior Approval Schedule 2, Part 3, Class MA: Change of Use from Commercial, Business and Service (E) to Residential (C3).
-
2026/1649 Granted
7 Ashley Park Road Walton-On-Thames Surrey KT12 1JU
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension which projects out from the rear wall of the original house by 5.50 metres, a maximum height of 3.70 metres and with an eaves height of 3.70 metres.