Skip to content
PlanIndex Get alerts
Menu

Planning application

44 Matham Road East Molesey Surrey KT8 0SU

Granted Elmbridge 2023/1227 Householder Application

Works: Extension Demolition Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Part two/part single-storey side and rear extension and alterations to fenestration following partial demolition of existing house.

As published by the council, reference 2023/1227

Application record

Reference
2023/1227
Type
Householder Application
Status
Final Decision
Decision
Granted As published: Grant Planning Permission
Received
25 Apr 2023
Validated
25 Apr 2023
Decided
30 Jun 2023
Ward
Molesey East Ward
Decision by
Officer delegated
Postcode
KT8 0SU

Site history

Applications at this address on the Elmbridge register

This site has had 4 applications since 2023: 4 approved, 0 refused.

  • 2024/2124 Granted

    44 Matham Road East Molesey Surrey KT8 0SU

    Variation of Condition 2 (Approved Plans) of planning permission 2023/3363 (Single-storey rear extension following partial demolition of existing house) to add a window to ground floor flank elevation.

    Decided 15 Oct 2024 Amendments
  • 2023/3363 Granted

    44 Matham Road East Molesey Surrey KT8 0SU

    Single-storey rear extension following partial demolition of existing house.

    Decided 13 Feb 2024 Householder
  • 2023/1962 Granted

    44 Matham Road East Molesey Surrey KT8 0SU

    East Molesey Old Village Conservation Area - Various works to various trees.

    Decided 17 Aug 2023 Trees

Timeline

Dates from the published record

  1. 25 Apr 2023

    Received by Elmbridge

  2. 30 Jun 2023

    Decision issued: Grant Planning Permission

  3. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Elmbridge granted permission on 30 June 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 44 Matham Road East Molesey Surrey KT8 0SU

    2024/2124 Submitted 9 Aug 2024 50 yards away

    Variation of Condition 2 (Approved Plans) of planning permission 2023/3363 (Single-storey rear extension following partial demolition of existing house) to add a window to ground floor flank elevation.

    Granted Amendments Extension Demolition +1 16 docs
    Small domestic
  • 44 Matham Road East Molesey Surrey KT8 0SU

    2023/1962 Submitted 13 Jul 2023 50 yards away

    East Molesey Old Village Conservation Area - Various works to various trees.

    Granted Trees 3 docs
  • 44 Matham Road East Molesey Surrey KT8 0SU

    2023/3363 Submitted 8 Dec 2023 50 yards away

    Single-storey rear extension following partial demolition of existing house.

    Granted Householder Extension Demolition 31 docs
    Small domestic
  • 42 Matham Road East Molesey Surrey KT8 0SU

    2026/0967 Submitted 24 Apr 2026 50 yards away

    Single storey side extension, single storey rear extensions and alterations to fenestration.

    Granted Householder Extension Windows or glazing 14 docs
    Small domestic
  • 42 Matham Road East Molesey Surrey KT8 0SU

    2026/1889 Submitted 3 Aug 2026 50 yards away

    80% historically approved · decision due ~12 Oct

    Single storey rear outbuilding.

    Awaiting decision Householder 6 docs
    Small domestic
  • 40 Matham Road East Molesey Surrey KT8 0SU

    2020/2763 Submitted 20 Oct 2020 50 yards away

    East Molesey Old Village Conservation Area - Various works to various trees.

    Granted Trees 3 docs

In Elmbridge

  • 2026/1934 Granted

    31 Common Road Claygate Esher Surrey KT10 0HG

    Single storey rear extension with alterations to fenestration.

    Received 7 Aug, published by the council 21 Aug 2026 Householder
  • 2026/1131 Granted

    9 Riverside Drive Esher Surrey KT10 8PG

    Part two-storey front extension, new front porch, two-storey rear extension and alterations to fenestration.

    Received 12 May, published by the council 30 Jul 2026 Householder
  • 2026/1856 Granted

    119 Silverdale Avenue Walton-On-Thames Surrey KT12 1EQ

    Two storey side/rear extension, alteration of the single storey rear extension roof, single storey rear outbuilding, side and rear canopy structures to accommodate outdoor kitchen, retention of the existing vehicular access with proposed replacement entrance gates with associated driveway and landscaping works to the front and rear including land level alterations and alterations to fenestration including metal gates and materiality following demolition of existing detached shed structure.

    Received 30 Jul, published by the council 21 Aug 2026 Householder
  • 2026/1442 Granted

    4 Cedar Close East Molesey Surrey KT8 9HR

    Side dormer window, first floor rear and side extension, single storey side extension, detached garage to rear garden following removal of existing prefabricated detached garage, side rooflights and alterations to fenestration.

    Received 15 Jun, published by the council 30 Jul 2026 Householder
  • 2026/1833 Granted

    5A Sassoons Cottages Cottimore Crescent Walton-On-Thames Surrey KT12 2DA

    Single-storey rear infill extension below existing structure and alterations to fenestration.

    Received 28 Jul, published by the council 14 Aug 2026 Householder