Planning application

2 Four Wents Cobham Surrey KT11 2NE

Granted Elmbridge 2023/0963 Full Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Part two/part single-storey side extension to create an additional two storey house with vehicle access, parking and landscaping and bin and cycle stores following demolition of existing outbuilding.

As published by the council, reference 2023/0963

Application record

Reference
2023/0963
Type
Full Application
Status
Final Decision
Decision
Grant Planning Permission
Received
28 Mar 2023
Validated
9 May 2023
Decided
28 May 2024
Ward
Cobham and Downside Ward
Decision by
Officer delegated
Postcode
KT11 2NE

Timeline

Dates from the published record

  1. 28 Mar 2023

    Received by Elmbridge

  2. 9 May 2023

    Validated

    Checked as complete and ready for consideration.

  3. 28 May 2024

    Decision issued: Grant Planning Permission

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • S/O 1 Haleswood On Four Wents Cobham KT11 2NF

    2025/3065 Submitted 19 Nov 2025 29m away

    Telecommunications Notification: Intent to install 1 no. cabinet 2mm Steel EN1088-2 / 1.4003 (3CR12) Powder Coated: Midnight Green RAL: 12B29 to facilitate fixed line broadband apparatus.

    Decided Telecoms 1 doc
  • 1 Four Wents Cobham Surrey KT11 2NE

    2025/1028 Submitted 14 Apr 2025 29m away

    Roof extension incorporating an increase in ridge height and front and rear dormer windows to provide rooms in the roofspace, single-storey side extension, detached single-storey garage, solar panels, front rooflights, new vehicular access, hard landscaping and alterations to fenestration and exterior finish following partial demolition of existing house and removal of chimney stack.

    Withdrawn Householder Extension Loft or dormer +3 13 docs
    Small domestic
  • 18 Tartar Road Cobham Surrey KT11 2AR

    2025/3127 Submitted 27 Nov 2025 37m away

    Change of use from C3 to C3(b).

    Refused Lawful development 11 docs
  • 7 Four Wents Cobham Surrey KT11 2NE

    2021/1836 Submitted 20 May 2021 37m away

    Rear outbuilding.

    Granted Lawful development 8 docs
  • 7 Four Wents Cobham Surrey KT11 2NE

    2026/0524 Submitted 2 Mar 2026 37m away

    Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension.

    Granted Prior approval Extension 11 docs
    Small domestic
  • 16 Tartar Road Cobham Surrey KT11 2AR

    2021/3125 Submitted 2 Sep 2021 41m away

    Two-storey side extension, single-storey rear extension, hip-to-gable roof extension incorporating rear dormer window following demolition of exiting garage and conservatory.

    Granted Householder Extension Loft or dormer +2 10 docs
    Small domestic

In Elmbridge

  • 2026/1551 Granted

    Squirrels Leap 13 Fernhill Oxshott Leatherhead Surrey KT22 0JH

    Two pairs of semi-detached two-storey houses with rooms in the roofspace, bin and cycle storage, new access, associated parking and landscaping following demolition of existing house and detached garage and outbuildings.

    24 Jun 2026 Full applications
  • 2025/2670 Granted

    Cartref Ellesmere Road Weybridge Surrey KT13 0HY

    Residential development comprising 3 detached two-storey houses with rooms in roof space, 1 with a detached garage, and 6 pairs of semi-detached two-storey houses with rooms in the roof space, bin and cycle stores and associated hard and soft landscaping following the demolition of existing house and associated outbuildings.

    14 Oct 2025 Full applications
  • 2026/0550 Refused

    Tanglewood Sandy Lane Cobham Surrey KT11 2EP

    Two-storey detached house with rooms in the roofspace and dormer windows following demolition of the existing house.

    4 Mar 2026 Full applications
  • 2026/1406 Decided

    Unit 1 Worthy Yard Redhill Road Cobham Surrey KT11 1EG

    Application for temporary change of use of land for vehicle parking in connection with vehicle storage and recovery depot (2 years)

    11 Jun 2026 Full applications
  • 2026/1475 Granted

    15 Ashley Park Road Walton-On-Thames Surrey KT12 1JU

    Subdivision of the existing residential plot and the construction of a single self-build residential dwelling, detached garage, parking, new vehicle access from Ashley Park Road with associated entrance gates, pedestrian access from Ashley Drive with associated gate, and associated bin storage and landscaping.

    18 Jun 2026 Full applications