Planning application
15 Bramble Rise Cobham Surrey KT11 2HP
Works: Extension
Relates to 2022/3531
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of Condition 2 (Approved Plans) of planning application 2022/3531 (Extensions) to remove part of front two-storey projecting gable.
As published by the council, reference 2023/0501
Application record
- Reference
- 2023/0501
- Type
- Variation of Condition Under S73
- Status
- Final Decision
- Decision
- Granted As published: Grant Planning Permission
- Received
- 20 Feb 2023
- Validated
- 2 May 2023
- Decided
- 27 Jun 2023
- Ward
- Cobham and Downside Ward
- Decision by
- Officer delegated
- Postcode
- KT11 2HP
Site history
Applications at this address on the Elmbridge register
This site has had 2 applications since 2022: 2 approved, 0 refused.
-
2022/3531 Granted
15 Bramble Rise Cobham Surrey KT11 2HP
Part two/part single-storey front extension, single-storey rear extension, partial conversion of garage into living space and alterations to fenestration and exterior finish.
Timeline
Dates from the published record
-
20 Feb 2023
Received by Elmbridge
-
2 May 2023
Validated
Checked as complete and ready for consideration.
-
27 Jun 2023
Decision issued: Grant Planning Permission
-
19 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
2022/3531 Granted
15 Bramble Rise Cobham Surrey KT11 2HP
Part two/part single-storey front extension, single-storey rear extension, partial conversion of garage into living space and alterations to fenestration and exterior finish.
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Elmbridge granted permission on 27 June 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
15 Bramble Rise Cobham Surrey KT11 2HP
Part two/part single-storey front extension, single-storey rear extension, partial conversion of garage into living space and alterations to fenestration and exterior finish.
Granted Householder Extension Windows or glazing 9 docsSmall domestic -
14 Bramble Rise Cobham Surrey KT11 2HP
Vehicular access with hardstanding.
Granted Lawful development 9 docs -
9 Bramble Rise Cobham Surrey KT11 2HP
Increase in ridge height incorporating rear dormer windows to provide rooms in the roofspace, single storey rear extension, rear juliet balcony, front rooflights, front porch and alterations to fenestration and exterior finish following partial demolition of existing detached garage.
Granted Householder Extension Loft or dormer +3 18 docsSmall domestic -
9 Bramble Rise Cobham Surrey KT11 2HP
Increase in ridge height incorporating rear dormer windows to provide rooms in the roofspace, single storey side/rear extensions, rear juliet balcony, front rooflights, front porch and alterations to exterior finish and fenestration following demolition of existing detached garage.
Refused Householder Extension Loft or dormer +3 21 docsSmall domestic -
9 Bramble Rise Cobham Surrey KT11 2HP
Increase in ridge height incorporating rear dormer windows to provide rooms in the roofspace, single storey side/rear extensions, rear balcony, front rooflights, front porch and alterations to exterior finish and fenestration following demolition of existing detached garage.
Refused Householder Extension Loft or dormer +3 19 docsSmall domestic -
Small domestic
Other amendment applications
In Elmbridge
-
2026/1677 Refused
Laurelwood Cavendish Road Weybridge Surrey KT13 0JY
Variation of Condition 4 (Tree Protection Measures) and 5 (Site Supervision) of planning permission 2025/1959 (Detached two-storey house with attached garage and associated landscaping following demolition of the existing house) to amend Tree Protection Plans and Tree Planting & Hard Surfaces Plan within approved arboricultural report.
-
2026/2363 Awaiting decision
Land off Anyards Road and Copse Road Cobham Surrey KT11 2LH
Non-Material Amendment to planning permission 2025/0373 to revise the landscape plan to remove the trees from the rear gardens of plots 1-8 and replace them within management controlled areas.
-
2026/1471 Granted
15 Chaucer Avenue Weybridge Surrey KT13 0SS
Variation of Condition 2 (Approved Plans) of planning permission 2025/3172 (Single-storey side and rear extension and extended patio following partial demolition of existing house) to relocate patio stairs and extend patio with an additional stepped level and balustrades.
-
2026/2340 Awaiting decision
Weybridge Health Centre 22 Church Street Weybridge Surrey KT13 8DW
Non-Material Amendment to planning permission to 2024/3065 to remove existing wall on part of the western boundary, relocation of bin store and partial reconstruction of the removed wall and to amend the wording of Conditions 8 (Cycle Parking), 15 (SuDS Verification) and 26 (Habitat Management and Maintenance Plan) to specify 'completed development'.
-
2026/2333 Awaiting decision
103 Grange Road West Molesey Surrey KT8 2PR
Removal of Conditions: 5 (Tree Protection Measures) and 6 (Site supervision) of 2024/3083 (Single-storey rear extension, rear dormer window and alterations to fenestration following partial demolition of rear projection) to remove tree conditions based on the findings of the report as the original conditions cannot be complied with.