Planning application
3 Arran Way Esher Surrey KT10 8BE
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior Approval Schedule 2, Part 1, Class A: Single-storey rear extension.
As published by the council, reference 2023/0172
Application record
- Reference
- 2023/0172
- Type
- Prior Approval Householders
- Status
- Final Decision
- Decision
- Prior Approval Not Required
- Received
- 18 Jan 2023
- Validated
- 18 Jan 2023
- Decided
- 23 Feb 2023
- Ward
- Esher Ward
- Decision by
- Officer delegated
- Postcode
- KT10 8BE
Timeline
Dates from the published record
-
18 Jan 2023
Received by Elmbridge
-
23 Feb 2023
Decision issued: Prior Approval Not Required
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Elmbridge granted permission on 23 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
63 Douglas Road Esher Surrey KT10 8BA
Rear dormer window with front rooflights following removal of chimney stack.
Granted Lawful development Loft or dormer Windows or glazing 6 docs -
91 Douglas Road Esher Surrey KT10 8BG
Two-storey rear extension and alterations to fenestration following demolition of outbuilding.
Granted Householder Extension Demolition +1 14 docsSmall domestic -
91 Douglas Road Esher Surrey KT10 8BG
Prior Approval Schedule 2, Part 1, Class A: Single-storey rear extension following demolition of existing rear outbuilding.
Granted Prior approval Extension Demolition 8 docsSmall domestic -
Cranmere Primary School Arran Way Esher Surrey KT10 8BE
Consultation from Surrey County Council: [2021/1827] Excavation of soil and engineering works to construct two drainage swales to the north and south of the School playing field to connect with the existing ditch to the east of the School site, with associated bridge and crossing point.(SCC Ref 2021/0058).
Granted Outline 6 docs -
Cranmere Primary School Arran Way Esher Surrey KT10 8BE
Consultation from Surrey County Council: [2021/2498] Erection of a new single storey Primary School (630 places) and Nursery (26 places) together with provision of parking for staff (37 spaces), cycle and scooter parking with access of Arran Way, layout of outdoor play areas and sports pitches and landscaping, without compliance with Conditions 15 (landscaping), 16 (implementation of landscaping), 17 (ecology and landscape management) and 23 (contamination) of planning permission EL/2013/1469 dated 4 June 2014. [SCC Ref 2021/0056].
Granted Outline 8 docsSmall domestic -
The Coach House 1 Oak Tree Place Esher Surrey KT10 8HJ
Tree Preservation Order EL:05/26 - Crown reduce x Oak (T1).
Refused Trees 8 docs
Other prior approval applications
In Elmbridge
-
2026/2123 Awaiting decision
1 Foxholm Cottage Byfleet Road Cobham Surrey KT11 1EB
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension which projects out from the rear wall of the original house by 6.00 metres, a maximum height of 3.00 metres and with an eaves height of 3.00 metres.
-
2026/2092 Awaiting decision
70 Fleece Road Long Ditton Surbiton Surrey KT6 5JS
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension which projects out from the rear wall of the original house by 5.00 metres, a maximum height of 3.85 metres and with an eaves height of 2.98 metres following partial demolition of existing dwelling.
-
2025/3139 Refused
Unit C 207 St Georges Business Park Brooklands Road Weybridge Surrey KT13 0TS
Prior Approval Schedule 2, Part 3, Class MA: Change of Use from Commercial, Business and Service (E) to Residential (C3).
-
2026/1951 Awaiting decision
102 Upper Farm Road West Molesey Surrey KT8 2QU
Prior Approval Schedule 2, Part 3, Class MA: Change of Use from Commercial, Business and Service (E) to Residential (C3).
-
2026/1649 Granted
7 Ashley Park Road Walton-On-Thames Surrey KT12 1JU
Prior Approval Schedule 2, Part 1, Class A: Single storey rear extension which projects out from the rear wall of the original house by 5.50 metres, a maximum height of 3.70 metres and with an eaves height of 3.70 metres.